R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (1.21 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
The removal of the existing front porch and rear extension, a proposed new front porch and single storey flat roof rear extension with 1no. new rooflight, and all associated ancillary site and boundary works.
Single-storey mono-pitch front extension with part canopy over the front entrance, widening of the vehicular access with dropped kerb, and a single-storey extension to the rear.
WEB1621/26received 18 Mar 2026decided 7 May 2026375 m away
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
WEB1526/26received 6 Mar 2026decided 27 Apr 2026439 m away
Permission is sought for works at No. 343 Navan Road, Dublin 7, D07VW11. Development to include: 1.) construction of a single storey garden room to the rear of the property measuring 33sqm, with materials of composite timber and aluminium cladding, and 2.) widening of the existing vehicular entrance to 3 metres from pillar to pillar, and all site works to accommodate proposed the alterations.
WEB1470/26received 1 Mar 2026decided 22 Jul 2026260 m away
The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements:
• Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein:
- The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147).
- The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232).
- The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131).
The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232).
The proposed underground cable routes will incorporate the following elements:
• Communication links and fibre optic cables between all substations in the same trench as the UGC;
• Joint bays and communication chambers along the UGC alignment;
• Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings.
• All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance.
Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.
WEB1097/26received 16 Jan 2026decided 11 Mar 2026362 m away
PERMISSION AND RETENTION: The development seeking retention permission consists of the creation of a vehicular access and provision of car parking in the garden to the front of the property. The development seeking permission will consist of narrowing the vehicular access to 2.765m.
WEB1072/26received 14 Jan 2026decided 10 Mar 2026461 m away
For the construction of a two storey extension (c.74.2m.sq.) to the rear of the existing single storey mid-terraced dwelling comprising 2no. bedrooms, bathroom and living areas, along with alterations to the internal layout of existing dwelling, minor elevational amendments, removal of the existing front porch and 3no. existing sheds to the rear, new boundary treatments all other associated site development works at 2 St. Joseph’s Cottages, Blackhorse Avenue, Dublin 7.
WEB5851/25received 2 Dec 2025decided 12 Mar 20260 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 6 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
The Office of Public Works — Dublin city and suburbs
257.18 hafolio DN220756F11 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.13 hafolio DN205488F87 m awayas of 1 Apr 2023
Fingal County Council — Dublin city and suburbs
0.16 hafolio DN104104L221 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
1.35 ha242 m awayas of 1 Apr 2023
The Office of Public Works — Dublin city and suburbs
142.23 hafolio DN220756F259 m awayas of 1 Apr 2023
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 12 Sept 2026, 20:52 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.