R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (13.05 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
The development will consist of: (a) The change in roof profile from hipped to gable ended roof to accommodate a conversion to the existing attic space to non-habitable storage space with new rear dormer window. (b) The addition of a new gable window on the side elevation. (c) The construction of a ground floor rear extension with 3no. rooflights. (d) The construction of a ground floor porch to the front. (e) The development is to include for internal alterations, drainage and all associated site works.
Attic conversion for storage purposes incorporating a raised side gable, rear dormer, and new gable window. Construction of a single-storey flat roof side extension. Demolition of the existing garage to the side of the dwelling.
The development will consist of widening of the existing front pedestrian entrance to form new vehicular access and driveway and associated site works.
Planning permission for attic conversion with hip roof to gable and dormer to rear roof to accommodate stairs to allow conversion of attic as non habitable storage space with roof windows to front , gable window to side all with associated ancillary works.
WEB2110/26received 7 May 2026decided 30 Jun 2026219 m away
1. Conversion of existing attic space to storage area to include a change of roof profile from hip to gable and a new dormer to the rear.
2. Construction of a 2.65 sq/m porch to the front of existing dwelling.
WEB2060/26received 1 May 2026decided 25 Jun 2026358 m away
The development will consist of the widening of existing pedestrian entrance to create vehicular access & dishing of public footpath and all ancillary site works.
WEB1857/26received 15 Apr 2026decided 6 Jul 2026439 m away
(1) Demolition of the existing single-storey garage to the side and existing single storey extension to the rear of the existing dwelling, (2) construction of a two-storey half hipped roof extension to the side of the existing dwelling, (3) construction of a two-storey & single-storey pitched roof extension to the front of the existing dwelling, (4) construction of a single-storey flat-roof extension to the rear of the existing dwelling, (5) conversion of the existing attic to a habitable bedroom with new dormer window to the rear and roof-lights to the front, (6) all associated internal modifications, site, drainage and structural works.
WEB1574/26received 12 Mar 2026decided 15 Jun 2026402 m away
(1) Demolition of the existing single-storey garage to the side and existing single storey extension to the rear of the existing dwelling, (2) construction of a two-storey half hipped roof extension to the side of the existing dwelling, (3) construction of a two-storey & single-storey pitched roof extension to the front of the existing dwelling, (4) construction of a single-storey flat-roof extension to the rear of the existing dwelling, (5) conversion of the existing attic to a habitable bedroom with new dormer window to the rear and roof-lights to the front, (6) widening of existing piers along front boundary and (6) all associated internal modifications, site, drainage and structural works.
WEB1508/26received 5 Mar 2026decided 6 Mar 2026402 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 6 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 07:47 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.