PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 31 Oct 2026, 22:27

Annadale Crescent

53.37083, -6.23958

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (97%). A building site 418 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Annadale CrescentBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2021: 2 files on Annadale Crescent2022: 2 files on Annadale Crescent2023: 1 file on Annadale Crescent2024: 2 files on Annadale Crescent2025: 5 files on Annadale Crescent2026: 2 files on Annadale Crescent14 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Heritage inventory1 within 100 m post box
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Everlac Paints Ltd (746 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings11Hampton Convent; church/chapel
Radon grid squares1
Monuments1R149650
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 95–100% by type. A new house in a garden is harder: 72% approved, and 1 in 2 is asked for more information.

Single-storey rear88 decided · more info asked 18%
99% · council 97%
Two-storey rear77 decided · more info asked 23%
95% · council 96%
Two-storey side16 decided · more info asked 25%
100% · council 98%
Attic or dormer222 decided · more info asked 9%
99% · council 96%
First-floor37 decided · more info asked 14%
95% · council 94%
Garage conversion23 decided · more info asked 9%
100% · council 99%
Porch or front13 decided · more info asked 8%
100% · council 97%
New house in a garden or site47 decided · more info asked 47%
72% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 523 nearby, 5,624 council-wide

Figure 3

Annadale Crescent, file by file since 2021

5 of 5 decided extensions on the road were approved.

14 planning files on Annadale Crescent since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 84 · 2021 · attic conversion / dormer · approved · 2407/21No. 7 · 2022 · attic conversion / dormer · approved · WEB1480/22No. 43 · 2023 · attic conversion / dormer · approved · 4873/23No. 62 · 2024 · single-storey rear · approved · WEB2105/24No. 46 · 2026 · attic conversion / dormer · approved · WEB1525/26Porches, roofs, otherNo. 36 · 2021 · other work · approved · 2775/21No. 37 · 2022 · other work · approved · 4683/22No. 29 · 2024 · other work · approved · WEB1723/24No. 82 · 2025 · other work · withdrawn or invalid · WEB1962/25No. 35 · 2025 · other work · approved · WEB2016/25No. 82 · 2025 · other work · refused · WEB2236/25No. 82 · 2025 · other work · withdrawn or invalid · WEB5401/25No. 82 · 2025 · other work · approved · WEB5428/25No. 12 · 2026 · other work · withdrawn or invalid · WEB1728/26New house in a side garden
ApprovedRefusedWithdrawn or invalid

14 files with "Annadale Crescent" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

4 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic22—
First-floor21—
Single-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 70 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 125 days; Appeal window: 4 weeks; If appealed: +206 days; Building starts: 118 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 54–55 (n=462)55 daysIf more info asked (1 in 7)With further information: median 125 days (n=83)125 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 206 days (n=98, all appeals within 1.5 km)+206 daysBuilding startsStart notice: median 118 days after permission (n=276)118 days after permissionSigned off515 days after the start, for the few who file. 54% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated545 decided home extensions, 284 start notices, 98 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    9 of 40 appealed refusals became permissions. 7 of 59 appealed approvals were reversed.

    Refusals appealed40 decided
    9 became permissions
    Approvals appealed59 decided
    7 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months

    None of 1 changed the council's decision

    • 324344 Granted with conditions · Block G, St. Vincent's, Fairview, Dublin 3. · 66 m
    • 501317 Refused · 149, Griffith Avenue, Drumcondra, Dublin 9, D09Y7F9 · 373 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher30 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 4

    What's changing around you?

    Street map around Annadale Crescent with 15 numbered planning items
    ⌖ the houseBuilding site that stoppedAppealBuilding startedApprovedNo decision yetRefused
    1. 1Griffith Avenue, Grace Park Road 4277/22Building site that stopped · 418 m
    2. 2Block G, St. Vincent's 324344Appeal: approved with conditions · 66 m
    3. 346 Annadale Crescent, Dublin 9 WEB1525/26Building started · 74 m
    4. 4106 Griffith Avenue, Dublin 9 WEB5324/25Building started · 191 m
    5. 5195 Philipsburgh Avenue, Dublin 3 WEB5667/25Approved · 29 m
    6. 612 Annadale Crescent, Drumcondra WEB1753/26No decision yet · 36 m
    7. 746, Annadale Crescent WEB1525/26Approved · 61 m
    8. 8202 Philipsburgh Avenue, Marino WEB5789/25Approved · 90 m
    9. 960 Annadale Drive, Dublin 9 WEB5776/25Approved · 157 m
    10. 1063, Croydon Park Avenue WEB2633/26No decision yet · 259 m
    11. 116, Foyle Road WEB1310/26Approved · 326 m
    12. 1241 Casino Road, Marino 5093/26No decision yet · 348 m
    13. 13149, Griffith Avenue WEB1391/26Refused · 373 m
    14. 1439, Foyle Road WEB3174/26No decision yet · 398 m
    15. 1537A, Marino Green WEB2705/26No decision yet · 457 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 123 permissions since 2016, 50 show a start notice and 6 have a completion certificate.

    158 applications lodged within 500 m. Council: 125 approved, 12 refused. After appeals: 123 approved. Of those: 6 signed off, 21 built with the owner's opt-out, 23 started, 73 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT125: lodged → approved12: lodged → refused17: lodged → withdrawn or invalid4: lodged → undecided121: approved → approved10: refused → refused17: withdrawn or invalid → withdrawn4: undecided → undecided2 approved by the council, refused after an appeal2 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal73: approved → no start notice found21: approved → built, owner opted out23: approved → started, not signed off6: approved → signed off158 lodged158 lodged125 approved125 approved12 refused12 refused17 withdrawn or invalid17 withdrawn or invalid4 undecided4 undecided123 approved123 approved12 refused12 refused19 withdrawn19 withdrawn4 undecided4 undecided73 no start notice found73 no start notice found21 built, owner opted out21 built, owner opted out23 started, not signed off23 started, not signed off6 signed off6 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured158 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 11 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-11 ACP 324344: Allow appeal amend conditionstoday5 Nov10 Nov15 Nov20 Nov25 Nov30 NovACP 324344: Allow appeal amend conditions · 66 m away · 2026-11-11
    High Court window ends
    • Time to ask the High Court for a review ends 11 Nov 202611 days left
      Allow appeal amend conditions
      66 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    1 building site nearby stopped before sign-off.

    Griffith Avenue, Grace… · 27 homes: 27 homes, started Aug 2023, never signed off202320242025202620272028Griffith Avenue, Grace… · 27 homes418 m · 4277/2227 homes, started Aug 2023, never signed off27 homes, started Aug 2023, never signed offtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 500 m

    Building site that stopped 1

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 20 and 43 a year; busiest 2025. 91% of decisions were approvals.

    2021: 23, 2022: 31, 2023: 20, 2024: 32, 2025: 43, 2026: 9010203040502021: 22 approved2021: 1 refused23’21*2022: 31 approved31’222023: 11 approved2023: 7 refused2023: 1 withdrawn or invalid2023: 1 undecided20’232024: 31 approved2024: 1 refused32’242025: 28 approved2025: 2 refused2025: 13 withdrawn or invalid43’252026: 2 approved2026: 1 refused2026: 3 withdrawn or invalid2026: 3 undecided9’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 17 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 11 in the last 12 months
    1 not signed off10 no sign-off needed
    • 58 Croydon Green, Dublin 3, D03 A7X2 · 2 Nov 2026 · start notice, opted out no sign-off needed · WEB1763/26 · 425 m
    • 12 Croydon Park Avenue, Dublin 3, D03 A3A0 · 6 Oct 2026 · short notice no sign-off needed · 3496/25 · 492 m
    • 43 Glandore Road, Dublin 9, D09 F9N2 · 3 Aug 2026 · start notice, opted out no sign-off needed · WEB5433/25 · 370 m
    • 4106 Griffith Avenue, Dublin 9, D09 A6K5 · 3 Aug 2026 · short notice no sign-off needed · WEB5324/25 · 191 m
    • 346 Annadale Crescent, Dublin 9, D09 H3K4 · 22 Jun 2026 · short notice no sign-off needed · WEB1525/26 · 74 m
    • 5 Griffith Avenue, Dublin 9, D09 Y8K8 · 13 Mar 2026 · start notice, opted out no sign-off needed · WEB5449/25 · 338 m
    • 65 Shelmartin Avenue, Marino, Dublin 3, D03 P9C0 · 27 Jan 2026 · short notice no sign-off needed · WEB1158/25 · 464 m
    • 45 Croydon Park Avenue, Dublin, Dublin 3, D03 Y3E0 · 26 Jan 2026 · start notice, opted out no sign-off needed · WEB2391/25 · 368 m
    • Hampton, Grace Park Road, Drumcondra, Dublin 9 · 19 Dec 2025 · 38 homes · start notice not signed off · WEB 2521/25 · 379 m
    • 117 Griffith Avenue, Dublin, D09 A6P9 · 19 Nov 2025 · start notice, opted out no sign-off needed · WEB2759/24 · 280 m
    • 20 Grace Park Grove, Dublin, Dublin 9, D09 XY7Y · 17 Nov 2025 · short notice no sign-off needed · WEB2471/25 · 462 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    St. Vincent's Hospital Site779283 being built · 496 not started (2026-Q2)66 m
    Former Carmelite Convent of the Incarnation19034 built · 43 being built · 113 not started (2026-Q2)333 m
    Richmond Road and Convent Avenue104104 not started (2026-Q2)689 m
    17-19 Richmond Avenue2121 not started (2026-Q2)734 m
    Former Leydens Wholesalers & Distributors107107 not started (2026-Q2)755 m
    19 and 21 Esmond Avenue2121 not started (2026-Q2)787 m
    61-65 Fairview Strand and 3 Esmond Avenue8282 not started (2026-Q2)789 m
    9/9a Richmond Avenue2828 being built (2026-Q2)791 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Rainbows Ltd · Crèche20 Apr 2026 · report · Tusla Early Years Inspectorate321 m
    First Steps Creche and Montessori · Crèche9 Sept 2024 · report · Tusla Early Years Inspectorate414 m
    Lullabys Montessori & Afterschool · Crèche13 May 2025 · report · Tusla Early Years Inspectorate736 m
    First Step Movements · Crèche14 Jan 2026 · report · Tusla Early Years Inspectorate758 m
    Drumcondra Montessori School · Crèche2 Oct 2025 · report · Tusla Early Years Inspectorate790 m
    Lullaby's Creche & Montessori · Crèche15 Apr 2025 · report · Tusla Early Years Inspectorate793 m
    Smart Kids Creche/Montessori · Crèche7 Nov 2024 · report · Tusla Early Years Inspectorate870 m
    Grace Park Montessori · Crèche3 Jun 2025 · report · Tusla Early Years Inspectorate873 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here150
    Council middle62
    Homes started
    Here1,936
    Council middle132
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    96% of homes built before 1971 (council 52%). 90% owner-occupied (council 47%).

    Homes built before 1971
    96% · council 52%
    Homes built since 2001
    0% · council 19%
    Owner-occupied
    90% · council 47%
    Rented
    3% · council 45%
    Children under 15
    20% · council 15%
    Aged 65 and over
    19% · council 13%
    Households with 2+ cars
    27% · council 19%
    Work mainly from home
    9% · council 12%
    This small area (193 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268058003

    Bus
    72 m
    Morroch Terrace · 42n, 73 · busiest stop within 500 m: 9 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    360 m
    Grace Park Community School, 139 pupils
    Homes sold nearby
    70
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Grace Park Community School · postprimary · 139 pupils · 360 m
    • S N Mhuire na mBrathar · primary · 336 pupils · 475 m
    • St Josephs For Blind Ns · primary · 48 pupils · 486 m
    • Grace Park Educate Together National School · primary · 409 pupils · 561 m
    • St Vincents De Paul Junior NS · primary · 334 pupils · 612 m
    • St Vincent De Paul Senior School · primary · 305 pupils · 617 m
    • Maryfield College · postprimary · 527 pupils · 645 m
    • Drumcondra NS · primary · 81 pupils · 686 m

    Stops 40

    • Morroch Terrace · 42n, 73 · 5/hour at peak · 72 m
    • Marino Institute · 42n, 73, N2 · 8/hour at peak · 223 m
    • Marino Institute · 73, N2 · 9/hour at peak · 223 m
    • Croydon Gardens · 73 · 6/hour at peak · 256 m
    • Griffith Court · 42n, 73 · 5/hour at peak · 259 m
    • Torlogh Parade · 42n, 73, N2 · 8/hour at peak · 327 m
    • Croydon Park Ave · 73 · 5/hour at peak · 353 m
    • Grace Park Rd · N2 · 4/hour at peak · 397 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Grace Park Community School · 360 m+25.2% pupils (139)
    • S N Mhuire na mBrathar · 475 m-1.8% pupils (336)
    • St Josephs For Blind Ns · 486 m-5.9% pupils (48) · an extension 2024, approved
    • Grace Park Educate Together National School · 561 m-0.7% pupils (409)
    • St Vincents De Paul Junior NS · 612 m-5.6% pupils (334)
    • St Vincent De Paul Senior School · 616 m+2.7% pupils (305)

    Open consultations

    Council meetings 30 items

    Public land

    • Health Service Executive · 0.26 ha · 329 m
    • Health Service Executive · 0.29 ha · 366 m
    • An Post · 0.15 ha · 483 m
    • Dublin City University · 8.6 ha · 495 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Building work started 74 m away: for how long?
      Ask for: The planning conditions for WEB1525/26.
      Agent · council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Drumcondra South A
    Electoral area
    Clontarf
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 1 site nearby could change: 1 stalled build.
    • Marino Institute (bus 73, N2) 223 m away: 9 an hour at morning peak; 62 from all stops within 500 m.
    • Here (2022 census): 90% owner-occupied (council 47%); 8% of homes empty (council 8%); most built 1946–1960; 32% drive to work (council 28%); population up 17% since 2016.
    • 5 home extensions within 250 m since 2025. Most were dormers or attic conversions.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • Homes started within 1 km: 1,700 in the last year, 129 three years before.
    • 17 applications nearby in the last 12 months; 86% approved (council 90%).
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher30 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 22:27 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.