PlanningRegister.ie
Planning report · Westmeath County Council · 2000 m around the house · the last 12 months · 23 Oct 2026, 13:43

Midlands Gateway Business Park, Kilbeggan

53.37290, -7.50076

Homes here mostly date from the 2000s. 2 planning files on this house, the latest from 2025. 46 homes approved 809 m away haven't started.

See on the mapWatch this area

Not held yet for Westmeath County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 2 planning files on this house, the latest from 2025.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2025: 2560023 · work already done, approved2021: 21158 · extension, approved

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    2560023 · work already done · approved 2025 · work already done
    approvedstartedsigned off?
  2. 2021
    21158 · extension · approved 2021 · built, signed off
    approvedstartedsigned off
On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: KMK Metals Recycling Limited (557 m); Dawn Meats Ireland Unlimited Company (973 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings63house; Kilbeggan Distillery
Monuments27R143853; R143860
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 18 on the draft 2027 map; 18 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 3

    How long, and what if someone objects?

    Figure 2

    A home extension's journey here

    A decision takes 53 days.

    Comments open: 5 weeks · €20; Council decision: 53 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 49–55 (n=8)53 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off40% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated14 decided home extensions, 5 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 3

    What appeals changed

    1 of 1 appealed approvals were reversed.

    Approvals appealed1 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Midlands Gateway Business Park, Kilbeggan with 15 numbered planning items
    ⌖ the houseOpen for commentsBuilding site that stoppedApproved, not startedEmpty land zoned for homesApprovedNo decision yet
    1. 1Kilbeggan South, Co. Westmeath 2660547No decision yet · 1.7 km
    2. 2Coola Lawns, Kilbeggan 196206Building site that stopped · 488 m
    3. 3Dublin Road R446 2660199Approved, no sign building has started · 809 m
    4. 4Tullamore Road Kilbeggan 2460385Approved, no sign building has started · 1.0 km
    5. 51.3 ha zoned for homesEmpty land zoned for homes · 165 m
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 374 m
    7. 70.6 ha zoned for homesEmpty land zoned for homes · 448 m
    8. 80.3 ha zoned for homesEmpty land zoned for homes · 491 m
    9. 91.8 ha zoned for homesEmpty land zoned for homes · 522 m
    10. 10Lower Main Street, Kilbeggan 2560636Approved with conditions · 426 m
    11. 11The Hill, Kilbeggan 2560649Approved with conditions · 462 m
    12. 12KMK Metals Recycling Ltd., Meeniska and Meadowpark Townlands Moate Road 2560606Approved with conditions · 492 m
    13. 13The Crescent, KIlbeggan 2660491No decision yet · 665 m
    14. 14Former Mercy Secondary school Dublin Rd, Killbeggan 2660291No decision yet · 796 m
    15. 15Tullamore Road, Kilbeggan 2560631Approved with conditions · 976 m
    Figure 4

    What happens to applications within 500 m

    Permission isn't building. Of 11 permissions since 2016, 5 show a start notice and 1 has a completion certificate.

    12 applications lodged within 500 m. Council: 11 approved, 1 refused. After appeals: 11 approved. Of those: 1 signed off, 1 built with the owner's opt-out, 3 started, 6 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT11: lodged → approved1: lodged → refused11: approved → approved1: refused → refused6: approved → no start notice found1: approved → built, owner opted out3: approved → started, not signed off1: approved → signed off12 lodged12 lodged11 approved11 approved1 refused1 refused11 approved11 approved1 refused1 refused6 no start notice found6 no start notice found1 built, owner opted out1 built, owner opted out3 started, not signed off3 started, not signed off1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured12 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 5

    The next 30 days

    1 deadline within 2.0 km; the first closes 13 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-13 2660547: application received — development will consist of the construction of two-storey house, domestic garage, effluent treatment system and all asstoday28 Oct2 Nov7 Nov12 Nov17 Nov22 Nov2660547: application received — development will consist of the construction of two-storey house, domestic garage, effluent treatment system and all ass · 1.7 km away · 2026-11-13
    Comments close
    • Comments close 13 Nov 202621 days left
      12660547 · application received — development will consist of the construction of two-storey house, domestic garage, effluent…
      €20 to the council · 1.7 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 6

    Approved, stalled or planned, not built yet

    46 homes 809 m away were approved Sept 2026 with no start notice yet; the permission runs to Sept 2031. 1 building site nearby stopped before sign-off.

    Dublin Road R446 · 46 homes: 46 homes approved Sep 2026, not started; Coola Lawns, Kilbeggan · 36 homes: 36 homes, started Oct 2022, never signed off; Tullamore Road Kilbeggan · 13 homes: 13 homes approved Aug 2025, not started20222023202420252026202720282029203020312032Dublin Road R446 · 46 homes809 m · 266019946 homes approved Sep 2026, not started46 homes approved Sep 2026, not startedCoola Lawns, Kilbeggan · 36 homes488 m · 19620636 homes, started Oct 2022, never signed off36 homes, started Oct 2022, never signed offTullamore Road Kilbeggan · 13 homes1.0 km · 246038513 homes approved Aug 2025, not started13 homes approved Aug 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 13 within 2.0 km

    Building site that stopped 1

    • 2Coola Lawns, Kilbeggan · 36 homes, started Oct 2022, never signed off · 488 m

    Approved, not started 2

    Empty land zoned for homes 10

    • 51.3 ha zoned for homes · no homes built on it yet · 165 m
    • 60.2 ha zoned for homes · no homes built on it yet · 374 m
    • 70.6 ha zoned for homes · no homes built on it yet · 448 m
    • 80.3 ha zoned for homes · no homes built on it yet · 491 m
    • 91.8 ha zoned for homes · no homes built on it yet · 522 m
    • 0.3 ha zoned for homes · no homes built on it yet · 537 m
    • 0.3 ha zoned for homes · no homes built on it yet · 569 m
    • 0.2 ha zoned for homes · no homes built on it yet · 571 m
    • 0.2 ha zoned for homes · no homes built on it yet · 577 m
    • 0.4 ha zoned for homes · no homes built on it yet · 585 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 7

    Applications within 500 m, by year

    Between 1 and 1 a year; busiest 2022. 92% of decisions were approvals.

    2021: 2, 2022: 1, 2023: 1, 2025: 805102021: 2 approved2’21*2022: 1 approved1’222023: 1 approved1’232025: 7 approved2025: 1 refused8’25
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 14 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    Building work nearby 6 in the last 12 months
    3 not signed off3 no sign-off needed
    • Moate Road, Meadow Park, Westmeath · 15 Oct 2026 · start notice not signed off · 25/60606 · 594 m
    • Harbour Road, Abbeybrook, Westmeath · 24 Sept 2026 · start notice, opted out no sign-off needed · 267 · 1.5 km
    • Comagh Road, Kilbeggan, Westmeath, N91 TP22 · 5 May 2026 · 1 homes · start notice, opted out no sign-off needed · 2560477 · 386 m
    • Loughanagore House, Kilbeggan, Westmeath · 12 Mar 2026 · 1 homes · short notice no sign-off needed · 22/246 · 874 m
    • Abbeybrook Garden, Kilbeggan, Westmeath · 20 Feb 2026 · start notice not signed off · 2460346 · 764 m
    • Abbeybrook, Westmeath · 26 Jan 2026 · 12 homes · start notice not signed off · 24/60346 · 868 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 23 Oct 2026, 02:22
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    Homes coming 59 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Child's Play ABA Ltd · Crèche16 Feb 2026 · report · Tusla Early Years Inspectorate420 m
    Kilbeggan Montessori · Crèche22 May 2025 · report · Tusla Early Years Inspectorateapprox. 921 m
    MSR Childcare Services ltd · Crèche20 May 2025 · report · Tusla Early Years Inspectorateapprox. 921 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Westmeath County Council.
    Homes approved
    Here144
    Council middle0
    Homes started
    Here100
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    37% owner-occupied (council 68%).

    Homes built before 1971
    21% · council 26%
    Homes built since 2001
    54% · council 34%
    Owner-occupied
    37% · council 68%
    Rented
    47% · council 26%
    Children under 15
    19% · council 21%
    Aged 65 and over
    10% · council 15%
    Households with 2+ cars
    28% · council 44%
    Work mainly from home
    4% · council 9%
    This small area (387 people)Westmeath

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 237058004

    Bus
    560 m
    Kilbeggan · 70, 763, MB01
    Nearest school
    789 m
    Scoil An Chlochair Cill Bheagan, 226 pupils
    Schools, stops and the council

    Schools

    • Scoil An Chlochair Cill Bheagan · primary · 226 pupils · 789 m
    • Meán Scoil an Chlochair · postprimary · 740 pupils · 1.2 km

    Stops 4

    • Kilbeggan · 70, 763, MB01 · 1/hour at peak · 560 m
    • Kilbeggan · 70, 763, MB01 · 1/hour at peak · 567 m
    • Kilbeggan East · 837, 845, UM02 · 2/hour at peak · 713 m
    • Kilbeggan East · 837, 845, 847, UM02 · 1/hour at peak · 743 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil An Chlochair Cill Bheagan · 789 m-0.4% pupils (226)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 23 Oct 2026, 02:42
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Council consultation portalsPublic23 Oct 2026, 01:47open
    Council meetings (ModernGov)Public23 Oct 2026, 02:42open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Work already done (2560023): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    2. Application 1.7 km away open for comments until 13 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Aghamore
    Electoral division
    Kilbeggan
    Electoral area
    Moate
    Council
    Westmeath County Council
    Everything we found, as a list 8 lines
    • 2 applications on this site; latest 2560023, approved 2025, work already done.
    • Not protected; no vacant land tax.
    • 13 sites nearby could change: 1 stalled build, 2 approved schemes, 10 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 13 Nov 2026.
    • 59 homes approved nearby, not started; largest 46 at Dublin Road R446.
    • No morning-peak service within 500 m; nearest is Kilbeggan, 560 m away (10 a day).
    • Here (2022 census): 46% rent (council 26%); 12% of homes empty (council 9%); most built 2001–2010; 47% drive to work (council 63%); population up 19% since 2016.
    • The council decides in a median 59 days (about 8 weeks); 43% are asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.023 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public23 Oct 2026
    www2.courts.ie—© the publisher22 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public23 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.023 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence23 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 23 Oct 2026, 13:43 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.