R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (1.47 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
Development will consist of widening an existing front pedestrian gate to allow vehicle access for off-street vehicle/ car parking, with all associated site works.
The development will consist of widening an existing front pedestrian gate to allow vehicle access for off-street vehicle/ car parking, with all associated site works.
WEB2759/26received 15 Jul 2026decided 20 Jul 2026483 m away
To replace the existing advertising lightboxes within the bus shelter, each with an advertising display area of 1.8m x 1.2m on each face with a double-sided unit that includes a digital advertising display area of 1.6 m x .93m on each side, along with all associated site works and services, on the public footpath at Bus Stop 600, Howth road, (opp Our Lady’s Mother of Devine Grace Church), Dublin 5.
The development will consist of:
(1) an attic conversion for storage with sideraised gable, including a dormer window to the rear and front, and two new side windows at attic level
(2) the creation of a new vehicular entrance in the front boundary wall onto Avondale Park.
The development will consist of:
(1) an attic conversion for storage with sideraised gable, including a dormer window to the rear and front, and two new side windows at attic level
(2) the creation of a new vehicular entrance in the front boundary wall onto Avondale Park.
WEB2622/26received 1 Jul 2026decided 1 Jul 2026318 m away
The development will consist of the partial demolition of existing front flat roof canopy and modification of existing wall beneath to facilitate the construction of a single-storey front extension to existing two-storey dwelling house, including associated elevational alterations and ancillary site works.
WEB2354/26received 4 Jun 2026decided 5 Jun 202649 m away
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 9 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 08:56 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.