HA - High Amenity: Protect these highly sensitive and scenic locations from inappropriate development and reinforce their character, distinctiveness and sense of place. In recognition of the amenity potential of these areas opportunities to increase public access will be explored.
G3 — High amenitythe fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029
HA - High Amenity: Protect and enhance high amenity areas
What that means: Protected high-amenity landscape. Development is resisted to preserve the character of the area.
An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
Natural Heritage Area (incl. proposed)
1
Royal Canal
NIAH-recorded building
4
Ashton House; Longford Bridge and 10th Lock; Ashtown Mill
Radon risk area
7
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements:
• Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein:
- The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147).
- The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232).
- The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131).
The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232).
The proposed underground cable routes will incorporate the following elements:
• Communication links and fibre optic cables between all substations in the same trench as the UGC;
• Joint bays and communication chambers along the UGC alignment;
• Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings.
• All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance.
Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.
WEB1097/26received 16 Jan 2026decided 11 Mar 2026244 m away
Change of Use from Retail [Class A1] to Yoga/Pilates studio [Class C2]. No physical material changes are involved; no development works. There is no anticipated change to visitor numbers or car parking requirements.
WEB5300/25received 3 Oct 2025decided 6 Oct 202575 m away
The Development will consist of the construction of a ground floor, flat roof extension to the rear of the house, comprising a living area and utility room, together with all necessary internal modifications. The works include relocation of an access gate and concrete path to the side of the boundary wall for better utilization of available area, together with all associated landscaping and external works. It is also proposed to enlarge and convert a second-floor storage room into a single bedroom by construction of a rear facing dormer.
WEB1297/24received 15 Mar 2024decided 7 Oct 2024430 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 20 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 18:31 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.