R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
Natural Heritage Area (incl. proposed)
1
Royal Canal
NIAH-recorded building
4
Ashton House; Longford Bridge and 10th Lock; Ashtown Mill
Radon risk area
6
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
This site is on an RZLT map — the draft map 2027 and the final map 2026 (1.25 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements:
• Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein:
- The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147).
- The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232).
- The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131).
The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232).
The proposed underground cable routes will incorporate the following elements:
• Communication links and fibre optic cables between all substations in the same trench as the UGC;
• Joint bays and communication chambers along the UGC alignment;
• Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings.
• All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance.
Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.
WEB1097/26received 16 Jan 2026decided 11 Mar 2026192 m away
We, Party Food 4U LTD, intend to apply for permission for development at this site Unit 4, River Centre, Rathborne Place, Dublin 15. The proposed development involves the following: Change of use from retail to a pizzeria takeaway, which also includes preparation of food for social events for delivery and takeaway; Installation of signage above the front door and graphics on the main door; Provision of a new filtered extract and intake ventilation grill to the front of the building behind the existing louvres. All with ancillary site works.
WEB5915/25received 9 Dec 2025decided 7 May 2026390 m away
Change of Use from Retail [Class A1] to Yoga/Pilates studio [Class C2]. No physical material changes are involved; no development works. There is no anticipated change to visitor numbers or car parking requirements.
WEB5300/25received 3 Oct 2025decided 6 Oct 202593 m away
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 23 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Dublin City Council — Dublin city and suburbs
8.08 hafolio DN187934F52 m awayas of 1 Apr 2023
Fingal County Council — Dublin city and suburbs
0.41 hafolio DN158887L106 m awayas of 1 Apr 2023
Fingal County Council — Dublin city and suburbs
1.16 hafolio DN158887L129 m awayas of 1 Apr 2023
Fingal County Council — Dublin city and suburbs
1.9 hafolio DN158887L198 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
7.13 hafolio DN190203F208 m awayas of 1 Apr 2023
Fingal County Council — Dublin city and suburbs
0.95 hafolio DN158887L311 m awayas of 1 Apr 2023
Fingal County Council — Dublin city and suburbs
1.37 hafolio DN158887L454 m awayas of 1 Apr 2023
Electricity Supply Board — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 20:54 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.