PlanningRegister.ie
Planning report · Fingal County Council · 500 m around the house · the last 12 months · 17 Oct 2026, 10:00

Beechpark Crescent

53.37745, -6.36347

Homes here mostly date from the 2000s. 3 planning files on this house, the latest from 2025. Home extensions nearby almost always get approved (92%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 3 planning files on this house, the latest from 2026.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 3 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Beechpark CrescentBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2026: FW25A/0518E · extension, approved2020: FW20B/0062 · les lennox intends, refused2020: FW20B/0002 · extension, approved2020: 3 files on Beechpark Crescent2021: 2 files on Beechpark Crescent2025: 1 file on Beechpark Crescent6 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    FW25A/0518E · extension · approved 2026 · not started, runs out 2031
    approvedstartedsigned off
  2. 2020
    FW20B/0062 · les lennox intends · refused 2020
    approvedstarted?signed off?
  3. 2020
    FW20B/0002 · extension · approved 2020 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas1Castleknock ACA
Heritage inventory buildings9Kilbride House; Saint Brigid's Church (Castleknock)
Radon grid squares4
Protected buildings7St. Brigid's Church of Ireland Church; Village House
Monuments4Graveyard; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, National Inventory of Architectural Heritage, Records of Protected Structures, Sites and Monuments Record · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–100% by type. A new house in a garden is harder: 62% approved, and 1 in 2 is asked for more information.

Single-storey rear73 decided · more info asked 14%
97% · council 94%
Two-storey rear46 decided · more info asked 11%
89% · council 86%
Two-storey side14 decided · more info asked 7%
100% · council 92%
Single-storey side16 decided · more info asked 19%
88% · council 95%
Attic or dormer124 decided · more info asked 10%
90% · council 90%
First-floor20 decided · more info asked 15%
100% · council 86%
Garage conversion26 decided · more info asked 12%
96% · council 91%
Porch or front20 decided · more info asked 10%
100% · council 94%
New house in a garden or site52 decided · more info asked 46%
62% · council 60%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 391 nearby, 5,119 council-wide

Figure 3

Beechpark Crescent, file by file since 2020

5 of 6 decided extensions on the road were approved.

6 planning files on Beechpark Crescent since 2020, by kind and decision.2020202120222023202420252026Extensions, atticsNo. 6 · 2020 · garage conversion · approved · FW20B/0002No. 6 · 2020 · other extension · refused · FW20B/0062No. 3 · 2020 · attic conversion / dormer · approved · FW20B/0111No. 3 · 2021 · other extension · approved · FW21B/0012No. 14 · 2021 · garage conversion · approved · FW21B/0160No. 5 · 2025 · attic conversion / dormer · approved · FW25A/0518EPorches, roofs, otherNew house in a side garden
ApprovedRefusedWithdrawn or invalid

6 files with "Beechpark Crescent" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2020–2026

Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m

Extensions and refusals near you 4 extensions within 250 m · the last 12 months

4 approved
KindAppliedApprovedRefused
Dormer or attic22—
Single-storey rear11—
Single-storey side11—

On Beechpark: 22 extensions in 10 years, 83% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 50 days. 1 in 8 is asked for more information, which adds about 58 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 8): 91 days; Appeal window: 4 weeks; If appealed: +120 days; Building starts: 142 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 47–54 (n=365)50 daysIf more info asked (1 in 8)With further information: median 91 days (n=17)91 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 120 days (n=96, all appeals within 1.5 km)+120 daysBuilding startsStart notice: median 142 days after permission (n=196)142 days after permissionSigned off399 days after the start, for the few who file. 56% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated421 decided home extensions, 196 start notices, 96 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    20 of 45 appealed refusals became permissions. 3 of 55 appealed approvals were reversed.

    Refusals appealed45 decided
    20 became permissions
    Approvals appealed55 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501860 Pending · 43 Pecks Lane, Castleknock, Dublin 15, D15 XWF3 · 470 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher17 Oct 2026, 01:34open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 4

    What's changing around you?

    Street map around Beechpark Crescent with 15 numbered planning items
    ⌖ the houseOpen for commentsBuilding startedApprovedNo decision yet
    1. 119 Oak Lawn, Castleknock FW26A/0373ENo decision yet · 199 m
    2. 212 Hawthorn Lawn, Dublin 15 FW26A/0175EBuilding started · 88 m
    3. 317 Beechpark Avenue, Dublin 15 FW25A/0432Building started · 89 m
    4. 435 Beechpark Avenue, Castleknock FW25A/0059EBuilding started · 103 m
    5. 55 Beechpark Crescent, Castleknock FW25A/0518EApproved · 4 m
    6. 68 Beechpark, Castleknock Road FW26A/0014EApproved · 88 m
    7. 744 Beechpark Avenue, Castleknock FW26A/0062ENo decision yet · 163 m
    8. 846 Beechpark Avenue, Castleknock FW26A/0281EApproved · 172 m
    9. 9Locations across Fingal in an east to west direction crossing the town FW26A/0017ENo decision yet · 207 m
    10. 1052 Beechpark Avenue, Castleknock FW26A/0169ENo decision yet · 217 m
    11. 11St. Brigid's National School, Beechpark Lawn FW26A/0266EApproved · 231 m
    12. 121 Beechpark Lawn, Castleknock FW25A/0558EApproved · 237 m
    13. 1387 The Pines, Castleknock FW26A/0134EApproved · 239 m
    14. 146 Beechpark Orchard, Castleknock FW26A/0323ENo decision yet · 264 m
    15. 1556 Castleknock Park, Castleknock FW26A/0185EApproved · 361 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 138 permissions since 2016, 71 show a start notice and 8 have a completion certificate.

    184 applications lodged within 500 m. Council: 136 approved, 20 refused. After appeals: 138 approved. Of those: 8 signed off, 34 built with the owner's opt-out, 29 started, 67 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT136: lodged → approved20: lodged → refused21: lodged → withdrawn or invalid7: lodged → undecided133: approved → approved15: refused → refused21: withdrawn or invalid → withdrawn7: undecided → undecided1 approved by the council, undecided after an appeal2 approved by the council, withdrawn or invalid after an appeal5 refused by the council, approved after an appeal67: approved → no start notice found34: approved → built, owner opted out29: approved → started, not signed off8: approved → signed off184 lodged184 lodged136 approved136 approved20 refused20 refused21 withdrawn or invalid21 withdrawn or invalid7 undecided7 undecided138 approved138 approved15 refused15 refused23 withdrawn23 withdrawn8 undecided8 undecided67 no start notice found67 no start notice found34 built, owner opted out34 built, owner opted out29 started, not signed off29 started, not signed off8 signed off8 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured184 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 5 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-05 FW26A/0373E: application received — Planning Permission and Retention Permission is sought by Alan Moynihan at 19 Oak Lawn, Castleknock, D15 K44W for (1) Pltoday22 Oct27 Oct1 Nov6 Nov11 Nov16 NovFW26A/0373E: application received — Planning Permission and Retention Permission is sought by Alan Moynihan at 19 Oak Lawn, Castleknock, D15 K44W for (1) Pl · 199 m away · 2026-11-05
    Comments close
    • Comments close 5 Nov 202619 days left
      1FW26A/0373E · application received — Planning Permission and Retention Permission is sought by Alan Moynihan at 19 Oak Lawn,…
      €20 to the council · 199 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    DART+ West is planned 541 m away.

    DART+ West, DART+ West:…: railway order granted (July 2024); DART+ West, Castleknock: railway order granted (July 2024)20242025202620272028DART+ West, DART+ West:…541 m · plannedrailway order granted (July 2024)DART+ West, Castleknock704 m · plannedrailway order granted (July 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Figure 9

    Applications within 500 m, by year

    Between 11 and 23 a year; busiest 2023. 87% of decisions were approvals.

    2016: 3, 2017: 15, 2018: 11, 2019: 14, 2020: 16, 2021: 18, 2022: 22, 2023: 23, 2024: 19, 2025: 21, 2026: 2201020302016: 3 approved3’16*2017: 14 approved2017: 1 refused15’172018: 9 approved2018: 1 refused2018: 1 withdrawn or invalid11’182019: 10 approved2019: 3 refused2019: 1 withdrawn or invalid14’192020: 9 approved2020: 6 refused2020: 1 withdrawn or invalid16’202021: 14 approved2021: 2 refused2021: 2 withdrawn or invalid18’212022: 17 approved2022: 2 refused2022: 3 withdrawn or invalid22’222023: 19 approved2023: 2 refused2023: 2 withdrawn or invalid23’232024: 17 approved2024: 2 withdrawn or invalid19’242025: 13 approved2025: 2 refused2025: 6 withdrawn or invalid21’252026: 11 approved2026: 1 refused2026: 3 withdrawn or invalid2026: 7 undecided22’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 25 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Building work nearby 7 in the last 12 months
    1 signed off as finished1 not signed off5 no sign-off needed
    • 212 Hawthorn Lawn, Dublin 15, Dublin, D15 YHT2 · 8 Sept 2026 · 1 homes · short notice no sign-off needed · FW26A/0175E · 88 m
    • 1 Beechpark Lawn, Dublin 15, Dublin, D15 F83P · 17 Jul 2026 · start notice, opted out no sign-off needed · FW25A/0558E · 248 m
    • 317 Beechpark Avenue, Dublin 15, Dublin, D15 HP5H · 16 Jun 2026 · 1 homes · short notice no sign-off needed · FW25A/0432 · 89 m
    • 435 Beechpark Avenue, Castleknock, Dublin 15, Fingal, D15 TC7D · 6 May 2026 · 1 homes · start notice, opted out no sign-off needed · FW25A/0059E · 103 m
    • 52 Beechpark Avenue, Castleknock, Fingal · 13 Apr 2026 · 3 homes · start notice not signed off · FW25A/0307E · 256 m
    • 17 Beechpark Avenue, Dublin, Fingal, D15 HP5H · 9 Feb 2026 · 1 homes · short notice no sign-off needed · FW23A/0053 · 89 m
    • Castleknock Road, Castleknock, Fingal, D15 XTP3 · 5 Jan 2026 · start notice signed off · FW25A/0340 · 278 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 17 Oct 2026, 01:09
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Beechpark · 36 applications in 10 years · 83% approved · most common: attic conversion / dormer

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Brady's Public House——714 m
    Former Phoenix Park Racecourse5123 built · 28 being built (2026-Q2)850 m
    Phoenix Park Racecourse——922 m

    Who applies most nearby

    • St. Brigid’s National School Castleknock Board of Management — 2 applications, latest 1 Jul 2026
    • CWP Investments Ltd — 2 applications, latest 29 Apr 2026

    Crèches and schools inspected

    NameLatest inspectionDistance
    Chrysalis Montessori & Afterschool · Crèche9 Oct 2025 · report · Tusla Early Years Inspectorate176 m
    Castleknock Montessori School · Crèche7 Oct 2024 · report · Tusla Early Years Inspectorate307 m
    Cherry Blossom Montessori - Castleknock · Crèche19 Nov 2024 · report · Tusla Early Years Inspectorate307 m
    Park Drive Day Nursery · Crèche11 Jun 2025 · report · Tusla Early Years Inspectorate607 m
    Kidology · Crèche8 Jul 2025 · report · Tusla Early Years Inspectorate726 m
    The Children's House Montessori School · Crèche12 Jun 2024 · report · Tusla Early Years Inspectorate934 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.012 Oct 2026, 23:02open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Applicant organisations (from the CRO)Derived by Planning Register11 Oct 2026, 23:05—
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Fingal County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here57
    Council middle3
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    24% of homes built before 1971 (council 11%). 66% owner-occupied (council 67%).

    Homes built before 1971
    24% · council 11%
    Homes built since 2001
    64% · council 43%
    Owner-occupied
    66% · council 67%
    Rented
    29% · council 28%
    Children under 15
    33% · council 22%
    Aged 65 and over
    9% · council 11%
    Households with 2+ cars
    55% · council 42%
    Work mainly from home
    20% · council 12%
    This small area (494 people)Fingal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267041013

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Bus
    152 m
    Oak Lawns · 37, 38, 70D · busiest stop within 500 m: 9 an hour at peak
    Planned
    541 m
    DART+ West, DART+ West: Connolly - Maynooth
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    276 m
    St Brigids Mxd NS, 834 pupils
    Homes sold nearby
    29
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • St Brigids Mxd NS · primary · 834 pupils · 276 m
    • Castleknock Educate Together NS · primary · 374 pupils · 282 m
    • Scoil Naisunta Chnuacha · primary · 198 pupils · 370 m
    • Edmund Rice College · postprimary · 912 pupils · 924 m
    • Scoil Thomais · primary · 622 pupils · 958 m
    • Scoil Bride B · primary · 193 pupils · 971 m

    Stops 27

    • Oak Lawns · 37, 38, 70D · 9/hour at peak · 152 m
    • Hawthorn Lawn · 37, 38, 70D, 70n · 5/hour at peak · 188 m
    • Ashleigh Green · 37, 38, 70D, 70n · 5/hour at peak · 355 m
    • Beechpark Lawn · 38 · 3/hour at peak · 358 m
    • Auburn Avenue · 38, 70n · 2/hour at peak · 364 m
    • Hadleigh Green · 38, 70n · 2/hour at peak · 365 m
    • Ashleigh Green · 37, 38, 70D · 9/hour at peak · 369 m
    • Auburn Green · 38 · 3/hour at peak · 394 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Brigids Mxd NS · 276 m-5% pupils (834) · an extension 2026, approved
    • Castleknock Educate Together NS · 282 m-8.6% pupils (374)
    • Scoil Naisunta Chnuacha · 370 m-0.5% pupils (198) · an extension 2026, approved
    • Edmund Rice College · 924 m+12.2% pupils (912)
    • Scoil Thomais · 958 m-2.8% pupils (622)
    • Scoil Bride B · 971 m-7.7% pupils (193)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.12 ha · 131 m
    • The Minister for Education and Skills · 2.78 ha · 202 m
    • Dublin City Council · 0.15 ha · 208 m
    • Dublin City Council · 0.46 ha · 245 m
    • Dublin City Council · 0.14 ha · 250 m
    • Dublin City Council · 2.65 ha · 255 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 17 Oct 2026, 02:12
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Council consultation portalsPublic17 Oct 2026, 01:36open
    Council meetings (ModernGov)Public17 Oct 2026, 02:12open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Extension (FW25A/0518E) approved 2026, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. Extension (FW20B/0002) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    3. Les lennox intends (FW20B/0062) refused 2020: built anyway?
      Ask for: The seller's answer and your surveyor's check.
      Seller · solicitor
    4. Application 199 m away open for comments until 5 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    5. Building work started 88 m away: for how long?
      Ask for: The planning conditions for FW26A/0175E.
      Agent · council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Castleknock
    Electoral division
    Castleknock-Park
    Electoral area
    Castleknock
    Council
    Fingal County Council
    Everything we found, as a list 8 lines
    • 3 applications on this site; latest FW25A/0518E, approved 2026, not started, runs out 2031.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 1 application open for comments nearby; nearest closes 5 Nov 2026.
    • Oak Lawns (bus 37, 38) 152 m away: 9 an hour at morning peak; 44 from all stops within 500 m. Planned: DART+ West 541 m away, railway order granted (July 2024).
    • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 66% owner-occupied (council 67%); 2% of homes empty (council 5%); most built 2001–2010; 52% drive to work (council 52%); population up 19% since 2016.
    • 4 home extensions within 250 m since 2025. Most were dormers or attic conversions. On Beechpark: 22 in 10 years, 83% approved.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 33
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.017 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public17 Oct 2026
    www2.courts.ie—© the publisher17 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.012 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public17 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.017 Oct 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register11 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence17 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 17 Oct 2026, 10:00 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.