Planning Register
Site report · 500 m radius · generated 13 Sept 2026, 19:08

Intel Ireland, Leixlip ED

Eircode Coordinates 53.37824, -6.51994Local authority Kildare County Council
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

What closes soonest 0 open windows

No observation, appeal or consultation window is open within 500 m today.

    Sources: acp, consult, moderngov, npad, rzlt · fetched 12 Sept 2026, 00:05
    SourceLicenceFetchedLink
    acpCC-BY-4.012 Sept 2026, 00:05open
    consultpublic12 Sept 2026, 02:04open
    moderngovpublic12 Sept 2026, 21:48open
    npadCC-BY-4.012 Sept 2026, 20:38open
    rzltCC-BY-4.012 Sept 2026, 00:23open

    Where this is

    Townland
    Leixlip
    Electoral division
    Leixlip
    Local electoral area
    Leixlip
    Local authority
    Kildare County Council

    Census 2022, small area 087064049

    200
    people
    66
    households
    64
    dwellings

    77.4% owner-occupied, 16.1% privately rented, 1.6% social. Vacancy 1.6%.

    Sources: places, parcels · fetched 11 Sept 2026, 21:28
    SourceLicenceFetchedLink
    placesCC-BY-4.011 Sept 2026, 21:28open
    parcelsCC-BY-4.011 Sept 2026, 19:06open

    Zoning evaluated against the point

    No zoning objective covers this site in the current plan (or the plan is not loaded for this county).

    Source: zoning · fetched 12 Sept 2026, 02:04
    SourceLicenceFetchedLink
    zoningCC-BY-4.012 Sept 2026, 02:04open

    Designations and constraints within 500 m

    An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
    DesignationCountExamples
    EPA-licensed facility3Intel Ireland Limited; P0207; Intel Ireland Limited
    Natural Heritage Area (incl. proposed)1Rye Water Valley/Carton
    Radon risk area2About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
    Special Area of Conservation1Rye Water Valley/Carton SAC
    Sources: constraints, constraints.epa_licence, constraints.flood_cfram, constraints.nha, constraints.radon, constraints.sac · fetched 11 Sept 2026, 19:11
    SourceLicenceFetchedLink
    constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)11 Sept 2026, 19:11open
    constraints.epa_licenceCC-BY-4.011 Sept 2026, 19:11open
    constraints.flood_cframCC-BY-NC-ND-4.0 · not redistributable — shown as a flag only11 Sept 2026, 19:11open
    constraints.nhaCC-BY-4.011 Sept 2026, 19:11open
    constraints.radonCC-BY-4.011 Sept 2026, 19:11open
    constraints.sacCC-BY-4.011 Sept 2026, 19:11open

    Residential Zoned Land Tax

    This site is not on the current draft or final RZLT map.

    Source: rzlt · fetched 12 Sept 2026, 00:23
    SourceLicenceFetchedLink
    rzltCC-BY-4.012 Sept 2026, 00:23open

    Planning applications 13 in 5 years within 500 m

    Recent decisions and applications

    7
    Conditional
    5
    N/a
    1
    Refused
    • Malone Farm , Confey Road Confey , Kellystown Leixlip Conditional
      change of use of temporary construction related access laneway into permanent agricultural use at my farmlands located at Malone Farm, Confey Road, Confey, Kellystown, Leixlip, Co. Kildare. The temporary construction related access laneways were developed under Grant of Planning Permission Reg. Ref. 221417. The development will consist of the following items: Change of use of temporary construction related access laneway into permanent agricultural use. The total length of this agricultural laneway is approximately 481 metres. This access laneway will safely connect the upper and lower lands of the farm
      2660290received 20 Mar 2026decided 14 May 2026273 m away
    • The site consists of up to approximately 15.05 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) and all associated site and development works at various locations in County Kildare with a total site area of c. 16.13ha. , Cullaghreeva Conf N/a
      a 10-year approval for development at this site consisting of up to approximately 15.05 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) and all associated site and development works at various locations in County Kildare with a total site area of c. 16.13ha. The proposed development crosses the townlands of Cullaghreeva, Confey, Newtown, Leixlip, Kellystown, Sion, Ravensdale, Blakestown, Collinstown, Greenfield, Dowdstown and Railpark. The proposed development consists of the following elements: Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Kildare County Council (KCC) as outlined below and illustrated on the maps herein: The proposed Coolmine cable route section in KCC (shown in purple) is approximately 1 km in length crossing the townlands of Cullaghreeva and Confey from east to west. The proposed Leixlip cable route section in KCC (shown in blue) is approximately 11.51 km in length crossing the townlands of Newtown, Confey, Leixlip, Kellystown, Sion, Ravensdale, Blakestown and Collinstown from east to west. There are two Protected Structures located within the application area of the Leixlip cable route, Deey Bridge and Lock (RPS B06-14) and Sandford Bridge (RPS B06-16). The proposed Moneycooley cable route is wholly within KCC (shown in orange) and is approximately 2.54 km in length crossing the townlands of Greenfield, Dowdstown and Railpark from south to north. The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232). The proposed underground cable routes will incorporate the following elements: - Communication links and fibre optic cables between all substations in the same trench as the UGC; Joint bays and communication chambers along the UGC alignment; Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings; - All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the Application
      2660074received 27 Jan 2026487 m away
    • The site consisting of up to approximately 15.05 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) and all associated site and development works at various locations in County Kildare with a total site area of c. 16.13ha. , The proposed de N/a
      a 10-year approval for development at this site consisting of up to approximately 15.05 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) and all associated site and development works at various locations in County Kildare with a total site area of c. 16.13ha. The proposed development crosses the townlands of Cullaghreeva, Confey, Newtown, Leixlip, Kellystown, Sion, Ravensdale, Blakestown, Collinstown, Greenfield, Dowdstown and Railpark. The proposed development consists of the following elements: Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Kildare County Council (KCC) as outlined below and illustrated on the maps herein: The proposed Coolmine cable route section in KCC is approximately 1 km in length crossing the townlands of Cullaghreeva and Confey from east to west. - The proposed Leixlip cable route section in KCC is approximately 11.51 km in length crossing the townlands of Newtown, Confey, Leixlip, Kellystown, Sion, Ravensdale, Blakestown and Collinstown from east to west. - The proposed Moneycooley cable route is wholly within KCC and is approximately 2.54 km in length crossing the townlands of Greenfield, Dowdstown and Railpark from south to north. The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232). The proposed underground cable routes will incorporate the following elements: • Communication links and fibre optic cables between all substations in the same trench as the UGC; • Joint bays and communication chambers along the UGC alignment; • Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings; • All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance Refer to the enclosed site and newspaper notices for a full description of development.
      2660044received 16 Jan 2026487 m away
    • Intel Ireland Limited , Collinstown Industrial Park , Leixlip Conditional
      for additions, replacements and modifications to existing industrial facilities located at Collinstown, Leixlip, Blakestown, Kellystown, Collinstown Industrial Park, Leixlip, Co. Kildare. The proposed development consisting of additions and modifications to the previously permitted (KCC Reg. Ref. 19/1054) and partially completed development, which incorporates a new Utility Building. The proposed development also includes other buildings, plant and equipment to be located North of Fab 10 and Fab 24. The proposed development is comprised of the following: (1) A Utility Building sized approximately 561 square metres approximately 10 metres high, housing plant and equipment and also including adjacent yard-based plant and equipment, consisting of a 16-metre-high storage tank approximately 3 metres in diameter, housing for electrical controls and external pipework. Also including a 4-metre-high acoustic screen, additional pipe bridges, all located north of Fab 10. (2) An elevated single-storey extension to the existing electrical building located north-west of Fab 10 sized 60 square metres approximately and 8.5 metres high approximately and a local connecting pipe bridge. (3) A building ancillary to the Fab 10 Reverse Osmosis Deionised Water (RODI) building located north of Fab 10 sized 75 square metres approximately and 7.9 metres high approximately including an Air Handling Unit, approximately 3.1 metre high located on the roof. (4) 2 no. tanks, each sized approximately 20.4 metres high and approximately 4.6 metres in diameter. 1no. located in the yard to the north of Fab 10 and 1no. located in the yard north of Fab 24. (5) The proposed development also includes minor modifications to site works, access road, underground surface water retention features, additional underground utilities, site lighting, pipe bridges, roof mounted equipment and internal roadworks. The application relates to a modification to a development which comprises or is for the purpose of an activity requiring an industrial emissions license under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. This application relates to development consisting of the modifications to an establishment within the meaning of the Major Accidents Directive (i.e. a COMAH / Seveso site).
      24177received 28 May 2024decided 17 Jul 202419 m away
    • Collinstown Leixlip , Blakestown Kellystown , Collinstown Industrial Park Conditional
      additions, alterations and modification to existing/permitted industrial facilities. The proposed development comprises of the following: 1. An extension to plant and equipment associated with FAB 34 located on an existing/permitted concrete slab to the rear of FAB 34. The development also comprises a modification to the proposed Boiler and Chiller Building to facilitate this development reducing its enclosed area from 22,188 square metres to 19,208 square metres. 2. The proposed equipment comprises 9 no. holding and treatment tanks located in a sealed reinforced concrete bund sized 542 square metres approximately together with associated pumps, pipe bridges and equipment. The tanks vary in height from 5 metres to 9 metres approximately. 3. The permitted (ABP Ref. Pl. 09.304672-19 / KCC Reg. Ref. 1991) two storey Boiler and Chiller Building is reduced by 2,980 square metres approximately, including modifications to the existing elevations, relocated escape stairs and miscellaneous layout modifications. The height of the modified facility will match the existing building height at 24.5 metres. 4. The works also include modifications to site works, underground utilities, roof mounted equipment and site lighting and a louvred screen wall approximately 85 metres in length, as an extension to the existing 8.5-metre-high elevational screen located on top of the Boundary wall to the rear of the Boiler and Chiller Building. 5. Erection of 2 no. ground level, illuminated monument signs at the main east and west vehicular entrances to the site from the R148. Both signs are 1.5 metres high and 2.4 metres wide approximately. 6. Illumination (internally) of 1 no. replacement building sign to the south elevation of the IR6 Building. The sign is 1.4 metres high and 3.3 metres wide approximately and is mounted so that the top of the sign is approximately 0.5 metres below for the parapet level of IR6. This application consists of a variation to a previously permitted development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 )as amended by the Protection of the Environment Act, 2003) is required. This is a site to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies
      23227received 9 Mar 2023decided 26 Apr 2023351 m away
    • Mariavilla Carton Demesne , Oldcarton Catherinestown Kellystown Ravensdale , Sion and Confey Conditional
      development at this site in the townlands of Mariavilla, Carton Demesne, Oldcarton, Catherinestown, Kellystown, Ravensdale, Sion and Confey. The development will traverse the administrative areas of both Kildare County Council and Meath County Council. The development within the Kildare County Council administrative area will consist of: (a) Permanent Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) upgrade works, upgrade of the existing chemical dosing system and ancillary works at the Maynooth Wastewater Pumping Station (WWPS) site in the townland of Mariavilla; and, (b) Provision of approximately 7.9km new pipeline (approximately 9.8km total development length within Kildare and Meath) and associated infrastructure (air valves, scour valves, flow meter, ventilation columns etc.) between the Maynooth WWPS and existing Irish Water infrastructure along the R149 in the townland of Confey. A Natura Impact Statement accompanies the subject application
      22784received 28 Jun 2022decided 13 Jan 2023487 m away
    • Collinstown Leixlip , Blakestown Kellystown , Collinstown Industrial Park Leixlip Conditional
      for a new chemical tanker storage compound located north of FAB 10. The proposed development consists of a modification and alterations to previously permitted and partly built development under planning application Reg. Ref. 19/1054. The proposed development comprises of the following: (1) Chemical Tanker Storage Compound. A chemical storage compound housing 3 no. parked chemical tanker trailers complete with bunded area, steel canopy and adjacent loading bay with bunded fixed tank (12,000 litres). The chemical tanker storage compound is approximately 220 square metres and the steel canopy is sized 13 metres x 11 metres approximately. (2) Site works. The proposed development includes minor modifications to previously permitted roads and underground utilities, paths, fencing, site lighting, signage and also includes miscellaneous site works. This application consists of a variation to a previously permitted development on an activity for licence under Part IV of the Environment Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. A Natura Impact Statement ("NIS") accompanies this application, and will be available for inspection or purchase at the office of the Planning Authority. This is a site to which the Chemicals Act ( Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies
      22491received 28 Apr 2022decided 20 Jun 20220 m away
    • Collinstown Leixlip , Blakestown Kellystown , Collinstown Industrial Park Leixlip N/a
      for a new chemical tanker storage compound located north of FAB 10. The proposed development consists of a modification and alterations to previously permitted and partly built development under planning application Reg. Ref. 19/1054. The proposed development comprises of the following: (1) Chemical Tanker Storage Compound. A chemical storage compound housing 3 no. parked chemical tanker trailers complete with bunded area, steel canopy and adjacent loading bay with bunded fixed tank (12,000 litres). The chemical tanker storage compound is approximately 220 square metres and the steel canopy is sized 13 metres x 11 metres approximately. (2) Site works. The proposed development includes minor modifications to previously permitted roads and underground utilities, paths, fencing, site lighting, signage and also includes miscellaneous site works. This application consists of a variation to a previously permitted development on an activity for licence under Part IV of the Environment Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. This is a site to which the Chemicals Act ( Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies
      22448received 14 Apr 20220 m away
    • Land South of the L1015 Road at Confey , Leixlip , Co. Kildare Conditional
      to amend the design of the approved development (Planning Reference 16/848) which comprises consent for a Solar PV Energy Development. Proposed amendments include: (1) Substation to increase in size and relocate; (2) Customer substation to be removed, (3) Storage container to relocate, (4) Transformer containers to relocate, increase in size and reduce in numbers, (5) Change in height and layout of deer fencing, (6) Reduction in height and number of CCTV cameras, (7) Slight alteration to the access tracks, (8) Change in height and angle of solar panels, (9) MW output to be reduced from 10MW to 8.2MW, and (10) Project lifetime proposed to be extended from 30 to 35 years. Revised by Significant Further Information which consists of the duration allowed for the works permitted under planning application reference 16/848 is sought to be increased to 10 years from the date of the final grant of permission (9th March 2017); and Condition 18 is sought to be amended to allow construction of both Confey Solar Farm (16/848) and Towerhill Solar Farm (16/777 to occur at the same time
      226received 10 Jan 2022decided 24 May 2022299 m away
    • Confey , Leixlip , Co. Kildare. N/a
      development at this site on land south of the L1015 Road at Confey, Leixlip. The development will consist of permission to amend the design of the approved development (Planning Reference 16/848) which comprises consent for a Solar PV Energy Development. Proposed amendments include: (1) Substation to increase in size and relocate; (2) Customer Substation to be removed; (3) Storage Container to relocate; (4) Transformer Containers to relocate, increase in size and reduce in numbers; (5) Change in height and layout of Deer Fencing: (6) Reduction in height and number of CCTV cameras; (7) Slight alteration to the access tracks; (8) Change in height and angle of solar panels; (9) MW output to be reduced from 10MW to 8.2MW, and (10) Project lifetime proposed to be extended from 30 to 35 years
      211773received 17 Dec 2021299 m away

    `description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.

    Source: npad · fetched 12 Sept 2026, 20:38
    SourceLicenceFetchedLink
    npadCC-BY-4.012 Sept 2026, 20:38open

    Appeals 0 in 5 years within 500 m

    No appeal to An Coimisiún Pleanála within 500 m in 5 years.

      Source: acp · fetched 12 Sept 2026, 00:05
      SourceLicenceFetchedLink
      acpCC-BY-4.012 Sept 2026, 00:05open

      Commencement notices 0 in 3 years within 500 m

      No commencement notice lodged with the Building Control Management System nearby.

        One notice can cover many buildings — count notices, never building rows, or a single multi-unit scheme reads as a trend (T11).

        Source: bcms · fetched 12 Sept 2026, 23:34
        SourceLicenceFetchedLink
        bcmsCC-BY-4.012 Sept 2026, 23:34open

        Sales 0 in 36 months within 500 m

        No Property Price Register sale geocoded within 500 m in 36 months.

        Sources: cara_listings, ppr · fetched 11 Sept 2026, 20:14
        SourceLicenceFetchedLink
        cara_listingsThird-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.11 Sept 2026, 20:14open
        pprPSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.'12 Sept 2026, 20:31open

        Consultations 0 matched by place

        No open council consultation covers this place.

          Source: consult · fetched 12 Sept 2026, 02:04
          SourceLicenceFetchedLink
          consultpublic12 Sept 2026, 02:04open

          Council items 0 in 24 months

          No committee item is geolinked to this place. Council minutes are linked at county or electoral-area level, so this is usually empty for a single house.

            Source: moderngov · fetched 12 Sept 2026, 21:48
            SourceLicenceFetchedLink
            moderngovpublic12 Sept 2026, 21:48open

            Capacity and public land

            No publishable utility-capacity record within the radius.

            No site on the LDA register of relevant public lands within 500 m.

            Source: lda_lands · fetched 11 Sept 2026, 16:43
            SourceLicenceFetchedLink
            lda_landsCC-BY-4.011 Sept 2026, 16:43open

            Schools and public transport within 1.0 km

            Schools

            None within 1.0 km.

              Stops 9 · routes 139, 52, C3, C5, DY02, UM11, X25, X26

              • Intel Campus 1
                52463 m
              • Intel Campus 1
                52467 m
              • Intel Main Entrance
                139, 52, C3, C5, DY02, UM11, X25, X26571 m
              • Intel Campus 2
                52593 m
              • Intel Main Entrance
                139, C3, C5, DY02, UM11, X25596 m
              • Intel West
                139, C3, C5, X25, X26646 m
              • Intel West
                139, C3, C5, X25655 m
              • Intel East
                139, C3927 m
              Sources: gtfs, schools · fetched 11 Sept 2026, 19:16
              SourceLicenceFetchedLink
              gtfsCC-BY-4.011 Sept 2026, 19:16open
              schoolsCC-BY-4.011 Sept 2026, 16:41open

              Sources used in this report

              SectionSourceLicenceFetched
              LocationplacesCC-BY-4.011 Sept 2026, 21:28
              ParcelparcelsCC-BY-4.011 Sept 2026, 19:06
              ZoningzoningCC-BY-4.012 Sept 2026, 02:04
              Constraintsconstraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)11 Sept 2026, 19:11
              Constraintsconstraints.epa_licenceCC-BY-4.011 Sept 2026, 19:11
              Constraintsconstraints.flood_cframCC-BY-NC-ND-4.0 · not redistributable, flag only11 Sept 2026, 19:11
              Constraintsconstraints.nhaCC-BY-4.011 Sept 2026, 19:11
              Constraintsconstraints.radonCC-BY-4.011 Sept 2026, 19:11
              Constraintsconstraints.sacCC-BY-4.011 Sept 2026, 19:11
              RzltrzltCC-BY-4.012 Sept 2026, 00:23
              PlanningnpadCC-BY-4.012 Sept 2026, 20:38
              AppealsacpCC-BY-4.012 Sept 2026, 00:05
              CommencementsbcmsCC-BY-4.012 Sept 2026, 23:34
              Salescara_listingsThird-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.11 Sept 2026, 20:14
              SalespprPSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.'12 Sept 2026, 20:31
              Consultationsconsultpublic12 Sept 2026, 02:04
              Council itemsmoderngovpublic12 Sept 2026, 21:48
              Public landlda_landsCC-BY-4.011 Sept 2026, 16:43
              Projectssocial_housingCC-BY-SA-4.011 Sept 2026, 20:13
              AmenitiesgtfsCC-BY-4.011 Sept 2026, 19:16
              AmenitiesschoolsCC-BY-4.011 Sept 2026, 16:41
              DeadlinesacpCC-BY-4.012 Sept 2026, 00:05
              Deadlinesconsultpublic12 Sept 2026, 02:04
              Deadlinesmoderngovpublic12 Sept 2026, 21:48
              DeadlinesnpadCC-BY-4.012 Sept 2026, 20:38
              DeadlinesrzltCC-BY-4.012 Sept 2026, 00:23

              Generated 13 Sept 2026, 19:08 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.