PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 31 Oct 2026, 23:20

Malahide Road

53.38261, -6.20568

Homes here mostly date from the 1950s. 1 planning file on this house, the latest from 2023. Home extensions nearby almost always get approved (98%). 5 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed. 1 planning file on this house, the latest from 2024.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960. 1 planning file on this house.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Malahide RoadBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2024: 4500/23 · work already done, approved2022: 3 files on Malahide Road2023: 6 files on Malahide Road2024: 1 file on Malahide Road2025: 7 files on Malahide Road17 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2024
    4500/23 · work already done · approved 2024 · work already done
    approvedstartedsigned off?
  • 10 Oct 2022 · notice that building work was starting · signed off as finished jul 2023
On this site
M3
Zoning · Neighbourhood centre
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z3 - DEV PLAN 2022-2028

ZoningM3 · Neighbourhood centre
What it says

Z3: Neighbourhood Centres: To provide for and improve neighbourhood facilities.

A local centre: shops, services and apartments over them, serving the surrounding housing.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningM3 · Neighbourhood centre
What it says

Z3: Neighbourhood Centres: To provide for and improve neighbourhood facilities.

A local centre: shops, services and apartments over them, serving the surrounding housing.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Mondelez Ireland Production Limited (Coolock) (942 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings4Church of Our Lady of Mercy; post box
Radon grid squares1
Monuments4Church; Graveyard
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 97–100% by type. A new house in a garden is harder: 81% approved, and 1 in 4 is asked for more information.

Single-storey rear67 decided · more info asked 12%
100% · council 97%
Two-storey rear41 decided · more info asked 24%
100% · council 96%
Two-storey side22 decided · more info asked 14%
100% · council 98%
Single-storey side19 decided · more info asked 11%
100% · council 99%
Attic or dormer246 decided · more info asked 13%
98% · council 96%
First-floor31 decided · more info asked 13%
97% · council 94%
Garage conversion32 decided · more info asked 16%
100% · council 99%
Porch or front17 decided · more info asked 12%
100% · council 97%
New house in a garden or site26 decided · more info asked 23%
81% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 501 nearby, 5,771 council-wide

Figure 3

Malahide Road, file by file since 2022

6 of 6 decided extensions on the road were approved.

17 planning files on Malahide Road since 2022, by kind and decision.20222023202420252026Extensions, atticsNo. 11 · 2022 · garage conversion · approved · 3897/22No number · 2022 · attic conversion / dormer · approved · 4389/22No. 5A · 2022 · single-storey rear · approved · 5199/22No number · 2023 · attic conversion / dormer · withdrawn or invalid · 4984/23No. 294 · 2024 · attic conversion / dormer · approved · WEB1454/24No number · 2025 · attic conversion / dormer · withdrawn or invalid · WEB2252/25No number · 2025 · attic conversion / dormer · withdrawn or invalid · WEB2371/25No. 288 · 2025 · two-storey rear · approved · WEB5171/25No. 298 · 2025 · attic conversion / dormer · approved · WEB5914/25Porches, roofs, otherNo number · 2023 · other work · refused · 3509/23No. 25G · 2023 · other work · approved · 3946/23No number · 2023 · other work · approved · 4020/23No. 44A · 2023 · other work · approved · 4500/23No. 2 · 2023 · other work · approved · WEB1689/23No. 43 · 2025 · other work · withdrawn or invalid · WEB2073/25No. 43 · 2025 · other work · approved · WEB2219/25No number · 2025 · other work · approved · WEB2855/25New house in a side garden
ApprovedRefusedWithdrawn or invalid

17 files with "Malahide Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 11 within 250 m · 0 refused within 100 m

Extensions and refusals near you 11 extensions within 250 m · the last 12 months

3 approved8 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear51—
Dormer or attic42—
Single-storey side20—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 63 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 126 days; Appeal window: 4 weeks; If appealed: +169 days; Building starts: 126 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=460)55 daysIf more info asked (1 in 7)With further information: median 126 days (n=74)126 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 169 days (n=58, all appeals within 1.5 km)+169 daysBuilding startsStart notice: median 126 days after permission (n=244)126 days after permissionSigned off365 days after the start, for the few who file. 50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated534 decided home extensions, 249 start notices, 58 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    6 of 19 appealed refusals became permissions. 2 of 39 appealed approvals were reversed.

    Refusals appealed19 decided
    6 became permissions
    Approvals appealed39 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months

    None of 1 changed the council's decision

    • 501247 Granted with conditions · Mount Dillon Business Park/ Commercial Yard, Brookville Park,… · 182 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 23:12
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 4

    What's changing around you?

    Street map around Malahide Road with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingDerelict buildingAppealApprovedNo decision yet
    1. 1106 Ardlea Road, Artane WEB3439/26No decision yet · 51 m
    2. 225, Maryfield Crescent WEB3452/26No decision yet · 472 m
    3. 335, Ardbeg Park WEB3050/26Approved · 304 m
    4. 412 Artane Cottages Lower Malahide Road Dublin 5 D05V4Y8 DS1287Derelict building · 402 m
    5. 5Mount Dillon Business Park/ Commercial Yard, Brookville Park 501247Appeal: approved with conditions · 182 m
    6. 6Former Styletex Premises, Mornington Business Park WEB2958/26Approved · 65 m
    7. 732, Gracefield Road WEB2786/26No decision yet · 197 m
    8. 845 Ardcollum Avenue, Beaumont 5015/26Approved · 214 m
    9. 920, Brookwood Avenue WEB1495/26Approved · 231 m
    10. 1013 St. Brigid's Road, Dublin 5 5053/26Approved · 310 m
    11. 1154, Ardbeg Park WEB2074/26No decision yet · 311 m
    12. 1272, Ardlea Road 5189/26No decision yet · 313 m
    13. 131, School Avenue WEB2116/26Approved · 320 m
    14. 1412 Mask Green, Artane WEB1860/26No decision yet · 344 m
    15. 1540 Maryfield Crescent, Dublin 5 5020/26Approved · 359 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 132 permissions since 2016, 47 show a start notice and 3 have a completion certificate.

    171 applications lodged within 500 m. Council: 133 approved, 5 refused. After appeals: 132 approved. Of those: 3 signed off, 19 built with the owner's opt-out, 25 started, 85 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT133: lodged → approved5: lodged → refused24: lodged → withdrawn or invalid9: lodged → undecided132: approved → approved5: refused → refused24: withdrawn or invalid → withdrawn9: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal85: approved → no start notice found19: approved → built, owner opted out25: approved → started, not signed off3: approved → signed off171 lodged171 lodged133 approved133 approved5 refused5 refused24 withdrawn or invalid24 withdrawn or invalid9 undecided9 undecided132 approved132 approved5 refused5 refused25 withdrawn25 withdrawn9 undecided9 undecided85 no start notice found85 no start notice found19 built, owner opted out19 built, owner opted out25 started, not signed off25 started, not signed off3 signed off3 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured171 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    7 deadlines within 500 m; the first closes 3 Nov 2026.

    7 deadlines in the next 30 days: 2026-11-03 WEB3050/26: GRANT RETENTION PERMISSION — RETENTION : Retention for extended vehicle access with permeable driveway and roof window to front roof all with associa; 2026-11-06 WEB3439/26: application received — PERMISSION AND RETENTION: (a) Retention permission for a front porch with a floor area of 2.4 Sq.m and (b) Planning perm; 2026-11-09 WEB3452/26: application received — The development will consist of the part demolition of the front boundary wall. Construction of a new vehicular access a; 2026-11-11 WEB3464/26: application received — The construction of a single storey flat roof extension to front, gable end and rear of house, part of new extension for; 2026-11-16 WEB3131/26: GRANT PERMISSION — The development consists of a single storey porch extension to the front & to convert the existing garage with provision; 2026-11-19 WEB3529/26: application received — a. Demolition of existing single storey extensions to the rear and side. b. Construction of a single storey extension to; 2026-11-20 WEB3548/26: application received — The development will consist of; 1. Partial Demolition of existing rear wall; 2. the construction of a single storey, netoday5 Nov10 Nov15 Nov20 Nov25 Nov30 NovWEB3050/26: GRANT RETENTION PERMISSION — RETENTION : Retention for extended vehicle access with permeable driveway and roof window to front roof all with associa · 304 m away · 2026-11-03WEB3439/26: application received — PERMISSION AND RETENTION: (a) Retention permission for a front porch with a floor area of 2.4 Sq.m and (b) Planning perm · 51 m away · 2026-11-06WEB3452/26: application received — The development will consist of the part demolition of the front boundary wall. Construction of a new vehicular access a · 472 m away · 2026-11-09WEB3464/26: application received — The construction of a single storey flat roof extension to front, gable end and rear of house, part of new extension for · 51 m away · 2026-11-11WEB3131/26: GRANT PERMISSION — The development consists of a single storey porch extension to the front & to convert the existing garage with provision · 51 m away · 2026-11-16WEB3529/26: application received — a. Demolition of existing single storey extensions to the rear and side. b. Construction of a single storey extension to · 51 m away · 2026-11-19WEB3548/26: application received — The development will consist of; 1. Partial Demolition of existing rear wall; 2. the construction of a single storey, ne · 51 m away · 2026-11-20
    Comments closeTime to appeal ends
    • Time to appeal ends 3 Nov 20263 days left
      3WEB3050/26 · GRANT RETENTION PERMISSION — RETENTION : Retention for extended vehicle access with permeable driveway and roof window…
      €220 to An Coimisiún Pleanála (€110 observer) · 304 m away
    • Comments close 6 Nov 20266 days left
      1WEB3439/26 · application received — PERMISSION AND RETENTION: (a) Retention permission for a front porch with a floor area of 2.4…
      €20 to the council · 51 m away
    • Comments close 9 Nov 20269 days left
      2WEB3452/26 · application received — The development will consist of the part demolition of the front boundary wall. Construction of…
      €20 to the council · 472 m away
    • Comments close 11 Nov 202611 days left
      WEB3464/26 · application received — The construction of a single storey flat roof extension to front, gable end and rear of house,…
      €20 to the council · 51 m away
    • Time to appeal ends 16 Nov 202616 days left
      WEB3131/26 · GRANT PERMISSION — The development consists of a single storey porch extension to the front & to convert the existing…
      €220 to An Coimisiún Pleanála (€110 observer) · 51 m away
    • Comments close 19 Nov 202619 days left
      WEB3529/26 · application received — a. Demolition of existing single storey extensions to the rear and side. b. Construction of a…
      €20 to the council · 51 m away
    • Comments close 20 Nov 202620 days left
      WEB3548/26 · application received — The development will consist of; 1. Partial Demolition of existing rear wall; 2. the…
      €20 to the council · 51 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 1 within 500 m

    Derelict building 1

    • 412 Artane Cottages Lower Malahide Road Dublin 5 D05V4Y8 · derelict since Nov 2024 · 402 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 21 and 44 a year; busiest 2025. 96% of decisions were approvals.

    2021: 21, 2022: 33, 2023: 21, 2024: 22, 2025: 44, 2026: 30010203040502021: 18 approved2021: 2 refused2021: 1 withdrawn or invalid21’21*2022: 33 approved33’222023: 17 approved2023: 2 refused2023: 2 withdrawn or invalid21’232024: 22 approved22’242025: 30 approved2025: 1 refused2025: 13 withdrawn or invalid44’252026: 13 approved2026: 8 withdrawn or invalid2026: 9 undecided30’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 36 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 8 in the last 12 months
    1 not signed off7 no sign-off needed
    • 1 School Avenue, Dublin 5, D05 V9H9 · 20 Aug 2026 · short notice no sign-off needed · WEB2116/26 · 334 m
    • 3 Maryfield Crescent, Dublin 5, D05 K6C6 · 24 Jun 2026 · short notice no sign-off needed · WEB1384/26 · 403 m
    • 8 Saint Brendan's Avenue, Dublin 5, D05 F7K8 · 18 Jun 2026 · start notice, opted out no sign-off needed · WEB2352/25 · 236 m
    • 20 Danieli Drive, Artane, Dublin 5, D05 XV02 · 9 Feb 2026 · start notice, opted out no sign-off needed · WEB2072/25 · 71 m
    • 1 Saint Brigid's Road, Killester, Dublin 5, D05 T6N6 · 4 Feb 2026 · start notice, opted out no sign-off needed · WEB5371/25 · 444 m
    • 69 Ardlea Road, Artane, Dublin 5, Dublin 5, D05 X9P6 · 1 Dec 2025 · short notice no sign-off needed · WEB1941/25 · 384 m
    • Unit 3EB and EC, Kilmore Road, Dublin, Dublin 5, D05 YD98 · 21 Nov 2025 · short notice no sign-off needed · 496 m
    • 1 Saint Brigid's Road, Killester, Dublin 5, D05 T6N6 · 21 Nov 2025 · 3 homes · start notice not signed off · WEB2007/25 · 444 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Kids World · Crèche11 Jun 2025 · report · Tusla Early Years Inspectorate240 m
    Little Rainbows Limited · Crèche14 Aug 2025 · report · Tusla Early Years Inspectorate335 m
    Cocoon Childcare- Artane · Crèche10 Apr 2025 · report · Tusla Early Years Inspectorate453 m
    Carousel Day Nursery · Crèche13 Apr 2026 · report · Tusla Early Years Inspectorate519 m
    Best Start Childcare Killester · Crèche17 Jun 2025 · report · Tusla Early Years Inspectorate603 m
    Naíonra Neasáin · Crèche11 Feb 2025 · report · Tusla Early Years Inspectorate618 m
    Little Steps · Crèche11 Jun 2026 · report · Tusla Early Years Inspectorate629 m
    Magic Little Kids Limited · Crèche10 Jul 2025 · report · Tusla Early Years Inspectorate645 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Quieter than most of Dublin City Council.
    Homes approved
    Here15
    Council middle62
    Homes started
    Here18
    Council middle132
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    67% of homes built before 1971 (council 52%). 60% owner-occupied (council 47%).

    Homes built before 1971
    67% · council 52%
    Homes built since 2001
    20% · council 19%
    Owner-occupied
    60% · council 47%
    Rented
    36% · council 45%
    Children under 15
    17% · council 15%
    Aged 65 and over
    14% · council 13%
    Households with 2+ cars
    26% · council 19%
    Work mainly from home
    15% · council 12%
    This small area (310 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268046010

    Road noise
    60–64 dB
    day–night average (EPA 2022)
    Bus
    37 m
    Artane Rnbt · 15, 27, 27A · busiest stop within 500 m: 26 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    450 m
    St Brigids Convent NS, 369 pupils
    Homes sold nearby
    788
    in 3 years, 22 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Brigids Convent NS · primary · 369 pupils · 450 m
    • St Marys Secondary School · postprimary · 320 pupils · 468 m
    • S N Caitriona Naionain · primary · 178 pupils · 529 m
    • Sn Caitriona Girls · primary · 185 pupils · 568 m
    • Chanel College · postprimary · 451 pupils · 612 m
    • Scoil Neasain · primary · 241 pupils · 618 m
    • Mercy College Coolock · postprimary · 402 pupils · 621 m
    • Scoil Bhreandain · primary · 136 pupils · 658 m

    Stops 48

    • Artane Rnbt · 15, 27, 27A, 27B, 27X, 42 · 26/hour at peak · 37 m
    • Artane Rnbt · 15, 27, 27A, 27B, 27X, 42 · 23/hour at peak · 83 m
    • Ardlea Road · 27B · 4/hour at peak · 180 m
    • Gracefield Rd · 27A · 2/hour at peak · 207 m
    • Danieli Road · 15, 27, 27A, 27B, 27X, 42 · 26/hour at peak · 229 m
    • Ardlea Road · 27B · 4/hour at peak · 229 m
    • Gracefield Rd · 27A · 2/hour at peak · 230 m
    • Mask Avenue · 15, 27, 27X, 42, 43 · 20/hour at peak · 266 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Brigids Convent NS · 450 m-3.7% pupils (369)
    • St Marys Secondary School · 468 m+0.3% pupils (320)
    • S N Caitriona Naionain · 529 m-8.2% pupils (178)
    • Sn Caitriona Girls · 568 m-6.1% pupils (185)
    • Chanel College · 612 m-3.2% pupils (451)
    • Scoil Neasain · 618 m-1.6% pupils (241)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.26 ha · 79 m
    • Dublin City Council · 0.27 ha · 181 m
    • Electricity Supply Board · 0.17 ha · 221 m
    • Dublin City Council · 0.38 ha · 248 m
    • Dublin City Council · 0.53 ha · 261 m
    • Dublin City Council · 1.35 ha · 278 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Work already done (4500/23): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    2. Application 51 m away open for comments until 6 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Decision 51 m away can be appealed until 16 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Clontarf West A
    Electoral area
    Clontarf
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 4500/23, approved 2024, work already done.
    • Zoned M3 (neighbourhood centre); not protected; no vacant land tax.
    • 1 site nearby could change: 1 derelict.
    • 5 applications open for comments nearby; nearest closes 6 Nov 2026.
    • Artane Rnbt (bus 15, 27) 37 m away: 26 an hour at morning peak; 154 from all stops within 500 m.
    • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 60% owner-occupied (council 47%); 8% of homes empty (council 8%); most built 1946–1960; 31% drive to work (council 28%); population up 3% since 2016.
    • 11 home extensions within 250 m since 2026. Most were single-storey rear extensions.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 23:20 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.