Planning report · Fingal County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 17:08

Roselawn Way, Blanchardstown, Blanchardstown

53.38272, -6.37358

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (91%). 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Natural heritage areas1Royal Canal
Heritage inventory buildings2Saint Brigid's Catholic Church; Granard Bridge
Radon grid squares5
Protected buildings3Granard Bridge; St. Brigid's Church (RC)
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (NIFM), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Records of Protected Structures · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 90–100% by type. A new house in a garden is harder: 58% approved, and 1 in 3 is asked for more information.

Single-storey rear52 decided · more info asked 10%
94% · council 92%
Two-storey rear20 decided · more info asked 10%
90% · council 81%
Two-storey side14 decided · more info asked 7%
100% · council 91%
Single-storey side10 decided · more info asked 20%
90% · council 93%
Attic or dormer87 decided · more info asked 6%
90% · council 92%
First-floor17 decided · more info asked 29%
100% · council 86%
Garage conversion17 decided · more info asked 12%
94% · council 87%
Porch or front17 decided · more info asked 12%
100% · council 94%
New house in a garden or site19 decided · more info asked 37%
58% · council 53%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 253 nearby, 2,931 council-wide

Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m

Extensions and refusals near you 4 extensions within 250 m · the last 12 months

2 approved2 no decision or withdrawn
KindAppliedApprovedRefused
Garage conversion32—
First-floor10—

On Roselawn: 16 extensions in 10 years, 76% of all applications approved; most common single-storey rear.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 49 days. 1 in 10 is asked for more information, which adds about 49 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 49 days; If more info asked (1 in 10): 106 days; Appeal window: 4 weeks; If appealed: +120 days; Building starts: 106 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 47–53 (n=256)49 daysIf more info asked (1 in 10)With further information: median 106 days (n=11)106 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 120 days (n=54, all appeals within 1.5 km)+120 daysBuilding startsStart notice: median 106 days after permission (n=119)106 days after permissionSigned off399 days after the start, for the few who file. 52% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated283 decided home extensions, 120 start notices, 54 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    9 of 31 appealed refusals became permissions. 2 of 27 appealed approvals were reversed.

    Refusals appealed31 decided
    9 became permissions
    Approvals appealed27 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months
    • 501949 Invalid · 131 Roselawn Road, Blanchardstown, Dublin 15, D15 NP7W · 437 m
    • 501706 Pending · 26 Roselawn Road, Blanchardstown, Dublin 15, D15 KDF3 · 145 m
    • 501501 Pending · Site to the east of PTSB Bank, Main Street, Blanchardstown, Dublin 15 · 331 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Roselawn Way, Blanchardstown, Blanchardstown with 15 numbered planning items
    ⌖ the houseOpen for commentsAppealApprovedNo decision yetRefused
    1. 116 Spire View, Riverston Abbey WEB3445/26No decision yet · 435 m
    2. 226 Roselawn Road, Blanchardstown 501706Appeal: no decision yet · 145 m
    3. 3No. 32 Woodpark, Castleknock Road FW26A/0272EApproved · 207 m
    4. 425 Old Navan Road, Castleknock FW26A/0201EApproved · 241 m
    5. 55 (& 5A) Church Avenue, Blanchardstown FW26A/0326ENo decision yet · 294 m
    6. 6Vishnu House, River Road FW26A/0199Approved · 300 m
    7. 7Avon Lodge Montessori & Creche, Church Avenue FW25A/0476EApproved · 317 m
    8. 8Site to the east of PTSB Bank, Main Street FW26A/0121Refused · 331 m
    9. 951 Woodpark, Castleknock FW26A/0231EApproved · 366 m
    10. 10Mill House, Main Street FW26A/0253ENo decision yet · 369 m
    11. 11Locations across Fingal in an east to west direction crossing the town FW26A/0017ENo decision yet · 370 m
    12. 12Mill House, Main Street FW26A/0280ENo decision yet · 375 m
    13. 1315 Hazel Lawn, Blanchardstown FW26A/0364ENo decision yet · 395 m
    14. 148 St. Patrick's Park, Blanchardstown FW26A/0217EApproved · 408 m
    15. 15131 Roselawn Road, Blanchardstown FW26A/0234ERefused · 437 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 72 permissions since 2016, 34 show a start notice and 8 have a completion certificate.

    116 applications lodged within 500 m. Council: 71 approved, 17 refused. After appeals: 72 approved. Of those: 8 signed off, 15 built with the owner's opt-out, 11 started, 38 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT71: lodged → approved17: lodged → refused18: lodged → withdrawn or invalid10: lodged → undecided69: approved → approved11: refused → refused18: withdrawn or invalid → withdrawn10: undecided → undecided1 approved by the council, undecided after an appeal1 approved by the council, refused after an appeal3 refused by the council, approved after an appeal1 refused by the council, undecided after an appeal2 refused by the council, withdrawn or invalid after an appeal38: approved → no start notice found15: approved → built, owner opted out11: approved → started, not signed off8: approved → signed off116 lodged116 lodged71 approved71 approved17 refused17 refused18 withdrawn or invalid18 withdrawn or invalid10 undecided10 undecided72 approved72 approved12 refused12 refused20 withdrawn20 withdrawn12 undecided12 undecided38 no start notice found38 no start notice found15 built, owner opted out15 built, owner opted out11 started, not signed off11 started, not signed off8 signed off8 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured116 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    3 deadlines within 500 m; the first closes 3 Nov 2026.

    3 deadlines in the next 30 days: 2026-11-03 WEB3034/26: GRANT PERMISSION — Extension and refurbishment of existing house to include (a) ground floor flat roof extension to rear with roof lights (; 2026-11-09 WEB3445/26: application received — The development will consist/consists of widening of the existing vehicular entrance/driveway by 0.844 meters (bringing ; 2026-11-09 WEB3451/26: application received — The development will consist of new elevational treatment and a new shopfront to the front elevation of the unit, includtoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecWEB3034/26: GRANT PERMISSION — Extension and refurbishment of existing house to include (a) ground floor flat roof extension to rear with roof lights ( · 435 m away · 2026-11-03WEB3445/26: application received — The development will consist/consists of widening of the existing vehicular entrance/driveway by 0.844 meters (bringing · 435 m away · 2026-11-09WEB3451/26: application received — The development will consist of new elevational treatment and a new shopfront to the front elevation of the unit, includ · 435 m away · 2026-11-09
    Comments closeTime to appeal ends
    • Time to appeal ends 3 Nov 20262 days left
      WEB3034/26 · GRANT PERMISSION — Extension and refurbishment of existing house to include (a) ground floor flat roof extension to…
      €220 to An Coimisiún Pleanála (€110 observer) · 435 m away
    • Comments close 9 Nov 20268 days left
      1WEB3445/26 · application received — The development will consist/consists of widening of the existing vehicular entrance/driveway by…
      €20 to the council · 435 m away
    • Comments close 9 Nov 20268 days left
      WEB3451/26 · application received — The development will consist of new elevational treatment and a new shopfront to the front…
      €20 to the council · 435 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    DART+ West is planned 159 m away.

    DART+ West, DART+ West:…: railway order granted (July 2024); DART+ West, Castleknock: railway order granted (July 2024)20242025202620272028DART+ West, DART+ West:…159 m · plannedrailway order granted (July 2024)DART+ West, Castleknock189 m · plannedrailway order granted (July 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Figure 8

    Applications within 500 m, by year

    Between 10 and 23 a year; busiest 2022. 81% of decisions were approvals.

    2021: 14, 2022: 23, 2023: 10, 2024: 17, 2025: 20, 2026: 320102030402021: 10 approved2021: 2 refused2021: 2 withdrawn or invalid14’21*2022: 16 approved2022: 7 refused23’222023: 7 approved2023: 2 refused2023: 1 withdrawn or invalid10’232024: 12 approved2024: 2 refused2024: 3 withdrawn or invalid17’242025: 16 approved2025: 2 refused2025: 2 withdrawn or invalid20’252026: 10 approved2026: 2 refused2026: 10 withdrawn or invalid2026: 10 undecided32’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 33 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 8 in the last 12 months
    2 not signed off6 no sign-off needed
    • 1 Saint Brigid's Park, Dublin 15, Dublin, D15 R7NF · 2 Nov 2026 · 1 homes · start notice not signed off · PF/2213/25 · 248 m
    • Vishnu House, Old River Road, Dublin 15, Dublin · 2 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · FW26A/0199 · 318 m
    • Rere of 14 Church Avenue, Dublin 15, D15 E860., Dublin 15, Dublin · 25 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · FW25A/0279 · 225 m
    • 1 Church Avenue, Dublin 15, Dublin · 18 Aug 2026 · start notice, opted out no sign-off needed · 307 m
    • 28 Saint Brigid's Park, Blanchardstown, Fingal, D15 RX8E · 25 May 2026 · 1 homes · start notice, opted out no sign-off needed · FW24A/0423E · 229 m
    • 21 Church Avenue, Dublin, Dublin 9, D09 A4T2 · 2 Apr 2026 · start notice, opted out no sign-off needed · WEB 5612/25 · 291 m
    • 5 Church Avenue, BLANCHARDSTOWN, Fingal · 13 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · FW23A/0228 · 305 m
    • 131 Roselawn Road, Blanchardstown, Fingal, D15 NP7W · 24 Nov 2025 · 1 homes · start notice not signed off · FW25A/0125E · 444 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 0 not started
    • 169a Clonsilla Road, Blanchardstown, Dublin 15 · Completed · 1 homes · 115 m
    • 50 Sheepmoor Avenue, Blanchardstown, D15 · Completed · 1 homes · 115 m
    • Clonross, Navan Road, Blanchardstown, Dublin 15 (Phase 1)* · Completed · 26 homes · 115 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Roselawn · 26 applications in 10 years · 76% approved · most common: single-storey rear

    Crèches and schools inspected

    NameLatest inspectionDistance
    The Children's House Montessori School · Crèche12 Jun 2024 · report · Tusla Early Years Inspectorate137 m
    Parkview Pre School · Crèche19 Mar 2026 · report · Tusla Early Years Inspectorate279 m
    Chrysalis St Brigid's Montessori & Afterschool · Crèche19 Nov 2024 · report · Tusla Early Years Inspectorate279 m
    Naionra Mol An Oige · Crèche11 Sept 2024 · report · Tusla Early Years Inspectorate279 m
    Avon Lodge Creche & Montessori · Crèche12 May 2026 · report · Tusla Early Years Inspectorate320 m
    Scope to Grow · Crèche7 Aug 2025 · report · Tusla Early Years Inspectorate535 m
    Kidology · Crèche8 Jul 2025 · report · Tusla Early Years Inspectorate664 m
    The Kiddies Day Nursery and Montessori School · Crèche9 Dec 2025 · report · Tusla Early Years Inspectorate831 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Fingal County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here52
    Council middle3
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    31% of homes built before 1971 (council 11%). 91% owner-occupied (council 67%).

    Homes built before 1971
    31% · council 11%
    Homes built since 2001
    1% · council 43%
    Owner-occupied
    91% · council 67%
    Rented
    5% · council 28%
    Children under 15
    16% · council 22%
    Aged 65 and over
    33% · council 11%
    Households with 2+ cars
    49% · council 42%
    Work mainly from home
    12% · council 12%
    This small area (245 people)Fingal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267033001

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Train
    189 m
    Castleknock · Dublin - Maynooth · busiest stop within 500 m: 12 an hour at peak
    Planned
    159 m
    DART+ West, DART+ West: Connolly - Maynooth
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    188 m
    Scoil Bride B, 193 pupils
    Homes sold nearby
    38
    in 3 years, 3 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Scoil Bride B · primary · 193 pupils · 188 m
    • Scoil Bride C · primary · 213 pupils · 220 m
    • Scoil Thomais · primary · 622 pupils · 577 m
    • St Francis Xavier Senior NS · primary · 388 pupils · 643 m
    • St Francis Xavier J NS · primary · 357 pupils · 647 m
    • Le Cheile Secondary School · postprimary · 944 pupils · 761 m
    • Castleknock Educate Together NS · primary · 374 pupils · 780 m

    Stops 33

    • Castleknock · Dublin - Maynooth · 7/hour at peak · 189 m
    • Scoil Bhride · 38, 70D · 3/hour at peak · 207 m
    • The Parochial House · 38 · 2/hour at peak · 233 m
    • Old Navan Road · 220, 220A, 38A, 39, N4 · 10/hour at peak · 291 m
    • Blanchardstown Vlge · 220, 220A, 38, 38A, 39, 70D · 11/hour at peak · 331 m
    • Park Lodge · 38, 70D · 2/hour at peak · 341 m
    • Church Road · 220, 220A, 38, 38A, 39, 70D · 12/hour at peak · 400 m
    • Junction 6 · 109, 109B, 111, 39A, 70, W4 · 11/hour at peak · 417 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil Bride B · 188 m-7.7% pupils (193)
    • Scoil Bride C · 220 m-7.8% pupils (213)
    • Scoil Thomais · 577 m-2.8% pupils (622)
    • St Francis Xavier Senior NS · 643 m+3.2% pupils (388)
    • St Francis Xavier J NS · 646 m-8% pupils (357)
    • Le Cheile Secondary School · 761 m-1.6% pupils (944)

    Council meetings 30 items

    Public land

    • Fingal County Council · 0.46 ha · 27 m
    • Dublin City Council · 0.46 ha · 186 m
    • Fingal County Council · 0.16 ha · 239 m
    • Fingal County Council · 0.73 ha · 254 m
    • Dublin City Council · 1.43 ha · 382 m
    • Health Service Executive · 2.37 ha · 408 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 435 m away open for comments until 9 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Blanchardstown
    Electoral division
    Blanchardstown-Roselawn
    Electoral area
    Castleknock
    Council
    Fingal County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 2 applications open for comments nearby; nearest closes 9 Nov 2026.
    • Church Road (bus 220, 220A) 400 m away: 12 an hour at morning peak; 68 from all stops within 500 m. Planned: DART+ West 159 m away, railway order granted (July 2024).
    • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 91% owner-occupied (council 67%); 9% of homes empty (council 5%); most built 1971–1980; 48% drive to work (council 52%); population down 2% since 2016.
    • 4 home extensions within 250 m since 2026. Most were garage conversions. On Roselawn: 16 in 10 years, 76% approved.
    • The council decides in a median 54 days (about 8 weeks); 1 in 4 is asked for more information.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 17:08 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.