Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 02:17

Griffith Parade

53.38290, -6.28186

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (99%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Griffith ParadeBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2022: 1 file on Griffith Parade2023: 1 file on Griffith Parade2026: 1 file on Griffith Parade3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings2post box
Radon grid squares3
Monuments4House - indeterminate date; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 02:01
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 98–100% by type. A new house in a garden is harder: 55% approved, and 1 in 2 are asked for more information.

Single-storey rear62 decided · more info asked 23%
100% · council 97%
Two-storey rear25 decided · more info asked 28%
100% · council 96%
Attic or dormer162 decided · more info asked 10%
98% · council 96%
First-floor19 decided · more info asked 16%
100% · council 94%
Garage conversion14 decided · more info asked 14%
100% · council 99%
Porch or front13 decided · more info asked 23%
100% · council 97%
New house in a garden or site11 decided · more info asked 55%
55% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 306 nearby, 5,427 council-wide

Figure 3

Griffith Parade, file by file since 2022

2 of 2 decided extensions on the road were approved.

3 planning files on Griffith Parade since 2022, by kind and decision.20222023202420252026Extensions, atticsNo. 17 · 2022 · attic conversion / dormer · approved · 4020/22No. 43 · 2023 · two-storey rear · approved · 3432/23Porches, roofs, otherNo. 60 · 2026 · other work · approved · WEB2950/26New house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Griffith Parade" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear20—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 68 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 123 days; Appeal window: 4 weeks; If appealed: +131 days; Building starts: 142 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=294)55 daysIf more info asked (1 in 6)With further information: median 123 days (n=57)123 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 131 days (n=37, all appeals within 1.5 km)+131 daysBuilding startsStart notice: median 142 days after permission (n=186)142 days after permissionSigned off349 days after the start, for the few who file. 51% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated351 decided home extensions, 188 start notices, 37 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    5 of 15 appealed refusals became permissions. 1 of 23 appealed approvals were reversed.

    Refusals appealed15 decided
    5 became permissions
    Approvals appealed23 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months

    None of 1 changed the council's decision

    • 500358 Granted · 74 Glassmeen Road, Tolka Estate, Glasnevin, Dublin 11 · 252 m report
    • 500294 Invalid · 74 Glassmeen Road, Tolka Estate, Glasnevin, Dublin 11 · 252 m
    • 500274 Invalid · 74 Glassmeen Road, Tolka Estate, Glasnevin, Dublin 11 · 252 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 4

    What's changing around you?

    Street map around Griffith Parade with 8 numbered planning items
    ⌖ the houseWindow closingApprovedNo decision yet
    1. 1Quarryhouse, 68 Ballygall Road East WEB3109/26Approved · 383 m
    2. 260, Griffith Parade WEB2950/26Approved · 58 m
    3. 36, Glasnamana Place 5212/26No decision yet · 115 m
    4. 447, Tolka Estate WEB2817/26No decision yet · 200 m
    5. 538, Claremont Drive WEB5844/25Approved · 282 m
    6. 651, Claremont Drive WEB2605/26No decision yet · 294 m
    7. 71, Glasmeen Road WEB3179/26No decision yet · 320 m
    8. 846 Glasilawn Road, Glasnevin WEB2474/26No decision yet · 357 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 67 permissions since 2016, 30 show a start notice and 0 have a completion certificate.

    84 applications lodged within 500 m. Council: 68 approved, 2 refused. After appeals: 67 approved. Of those: 0 signed off, 11 built with the owner's opt-out, 19 started, 37 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT68: lodged → approved2: lodged → refused9: lodged → withdrawn or invalid5: lodged → undecided67: approved → approved2: refused → refused9: withdrawn or invalid → withdrawn5: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal37: approved → no start notice found11: approved → built, owner opted out19: approved → started, not signed off84 lodged84 lodged68 approved68 approved2 refused2 refused9 withdrawn or invalid9 withdrawn or invalid5 undecided5 undecided67 approved67 approved2 refused2 refused10 withdrawn10 withdrawn5 undecided5 undecided37 no start notice found37 no start notice found11 built, owner opted out11 built, owner opted out19 started, not signed off19 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured84 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 10 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-10 WEB3109/26: GRANT PERMISSION — To attach 3 No. wall mounted steel poles each carrying 2 antennae (6 antennae in total) and two RRU units per pole, to rtoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecWEB3109/26: GRANT PERMISSION — To attach 3 No. wall mounted steel poles each carrying 2 antennae (6 antennae in total) and two RRU units per pole, to r · 383 m away · 2026-11-10
    Time to appeal ends
    • Time to appeal ends 10 Nov 20269 days left
      1WEB3109/26 · GRANT PERMISSION — To attach 3 No. wall mounted steel poles each carrying 2 antennae (6 antennae in total) and two RRU…
      €220 to An Coimisiún Pleanála (€110 observer) · 383 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 9 and 18 a year; busiest 2024. 97% of decisions were approvals.

    2021: 19, 2022: 12, 2023: 9, 2024: 18, 2025: 15, 2026: 11051015202021: 17 approved2021: 1 refused2021: 1 withdrawn or invalid19’21*2022: 12 approved12’222023: 9 approved9’232024: 17 approved2024: 1 refused18’242025: 11 approved2025: 4 withdrawn or invalid15’252026: 2 approved2026: 4 withdrawn or invalid2026: 5 undecided11’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 12 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 4 in the last 12 months
    1 not signed off3 no sign-off needed
    • 3 Northland Grove, Dublin 11, D11 F8Y0 · 18 Sept 2026 · start notice, opted out no sign-off needed · WEB1600/25 · 467 m
    • 74 Tolka Estate, Glsnevin, Dublin 11, D11 Y6X9 · 11 May 2026 · start notice, opted out no sign-off needed · WEB2233/25 · 264 m
    • 96A Griffith Road, Dublin, Dublin 11, D11 RH74 · 11 May 2026 · 1 homes · start notice, opted out no sign-off needed · 3331/25 · 216 m
    • 28 Tolka Estate, Glasnevin, Dublin 11, D11 W8C5 · 18 Mar 2026 · start notice not signed off · WEB1915/24 · 254 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Former Premier Dairies Site200200 built (2026-Q1)601 m
    Former Oak Public House Site8989 not started (2026-Q2)682 m
    Rivermount Cottages9797 not started (2026-Q2)913 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Griffith Community Playgroup · Crèche3 Apr 2025 · report · Tusla Early Years Inspectorate176 m
    Butterflies Community Playgroup · Crèche30 Apr 2026 · report · Tusla Early Years Inspectorate276 m
    Willow Tree Creche · Crèche27 Apr 2026 · report · Tusla Early Years Inspectorate356 m
    Little Stars Childcare · Crèche15 Apr 2025 · report · Tusla Early Years Inspectorate356 m
    ABC Childcare & Montessori · Crèche8 Jul 2025 · report · Tusla Early Years Inspectorate371 m
    Bizzy B's Afterschool & Pre School · Crèche2 Mar 2026 · report · Tusla Early Years Inspectorate499 m
    Ballygall Community Playgroup · Crèche20 Apr 2026 · report · Tusla Early Years Inspectorate627 m
    Bizzy B's Creche · Crèche23 Jul 2025 · report · Tusla Early Years Inspectorate666 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here0
    Council middle50
    Homes started
    Here209
    Council middle125
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    93% of homes built before 1971 (council 52%). 78% owner-occupied (council 47%).

    Homes built before 1971
    93% · council 52%
    Homes built since 2001
    1% · council 19%
    Owner-occupied
    78% · council 47%
    Rented
    20% · council 45%
    Children under 15
    17% · council 15%
    Aged 65 and over
    16% · council 13%
    Households with 2+ cars
    19% · council 19%
    Work mainly from home
    11% · council 12%
    This small area (218 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268014009

    Bus
    66 m
    Griffith Parade · 23 · busiest stop within 500 m: 3 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    411 m
    St Kevins College, 503 pupils
    Homes sold nearby
    40
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • St Kevins College · postprimary · 503 pupils · 411 m
    • Scoil na Croi Naofa · primary · 404 pupils · 521 m
    • Mother Of Divine Grace · primary · 480 pupils · 533 m
    • St Ciarans Spec Sch · primary · 140 pupils · 570 m
    • Gaelscoil Ui Earcain · primary · 248 pupils · 735 m
    • Beneavin De La Salle College · postprimary · 585 pupils · 771 m
    • St Brigids Convent · primary · 406 pupils · 791 m
    • North Dublin Ns Project · primary · 214 pupils · 909 m

    Stops 68

    • Griffith Parade · 23 · 3/hour at peak · 66 m
    • Glasnamana Pl · 23 · 3/hour at peak · 123 m
    • Griffith Drive · 23 · 3/hour at peak · 158 m
    • Griffith Drive · 23 · 3/hour at peak · 179 m
    • Griffith Road · 23 · 3/hour at peak · 194 m
    • Johnstown Park · 23 · 3/hour at peak · 214 m
    • Johnstown Park · 23 · 3/hour at peak · 224 m
    • Tolka Estate · 23 · 3/hour at peak · 254 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Kevins College · 411 m+0.4% pupils (503)
    • Scoil na Croi Naofa · 521 m-2.2% pupils (404)
    • Mother Of Divine Grace · 533 m-2% pupils (480)
    • St Ciarans Spec Sch · 570 m-2.8% pupils (140)
    • Gaelscoil Ui Earcain · 735 m-7.8% pupils (248)
    • Beneavin De La Salle College · 771 m-3% pupils (585)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.82 ha · 122 m
    • Dublin City Council · 2.32 ha · 147 m
    • Dublin City Council · 0.27 ha · 148 m
    • Dublin City Council · 0.19 ha · 152 m
    • Dublin City Council · 0.16 ha · 170 m
    • Dublin City Council · 0.33 ha · 221 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Ballygall D
    Electoral area
    Ballymun-Finglas
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • Northland Gr (bus 23, 70D) 476 m away: 3 an hour at morning peak; 56 from all stops within 500 m.
    • Here (2022 census): 78% owner-occupied (council 47%); 2% of homes empty (council 8%); most built 1946–1960; 50% drive to work (council 28%).
    • 2 home extensions within 250 m since 2026. Most were single-storey rear extensions.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • 12 applications nearby in the last 12 months.
    • 1 building job started within 250 m in the last six months.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 02:17 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.