R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (3.45 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
Planning permission for (1) partial demolition with construction / alterations to an existing single storey extension to the front, replacing the existing pitched tiled roof with a zinc clad flat roof and with new rendered finishes, (2) to convert the existing garage to the front to a new office / wc / cloak room, (3) to replace an existing flat roof on an existing single storey extension to the rear providing a new lantern skylight over, with all associated site works and SUDs drainage.
Ross & Siobhan Lavan intend to apply for planning permission for the construction of 1) a single storey extension to the rear, 2) a first floor extension on top of the existing single storey element to the side / front, 3) , an attic conversion with velux roof windows to the front, side and rear, 4) deep retrofit upgrades and insulation throughout, 5) all associated site works & SUDs drainage all at 541 Howth Road, Dublin 5.
5139/26received 25 May 2026decided 16 Jul 2026342 m away
A proposed new first floor extension to the side of the existing house extending 4m into the rear garden. A new ground floor only porch to the front of the existing house and all ancillary works .
5124/26received 1 May 2026decided 25 Jun 2026351 m away
We, Gregory Savage & Sinead Savage intend to apply for Permission for development at this site 177 Foxfield Grove, Raheny, Foxfield, Dublin 5, D05 V627 for (1) 39 m2 garden studio containing a Bedroom and Bathroom facilities together with all associated site works. All of the above to include all associated ancillary site works at the above address.
WEB1718/26received 27 Mar 2026decided 20 May 2026150 m away
The development will consist/consists of: (i) demolition of existing rear and side extension and out-buildings; chimney removal; (ii) construction of single storey flat roof extension to the rear and side of existing dwelling with a partially glazed roof and rooflight; (iii) new windows & rooflights, internal modifications, new patio area to the rear, landscaping, SUDS drainage and all associated works necessary to facilitate the development
WEB1358/26received 19 Feb 2026decided 13 Apr 2026158 m away
Proposed new detached two-storey dwelling house with an attic level habitable bedroom and a single storey element to the rear to the side of existing house ; Proposed using the existing front vehicular access , site development works , demolition of side garage and shed , service connections , division of land , rainwater harvest tank under back garden , landscaping and boundary treatment , external alterations to existing house , block up rear facade bedroom 3 window and form side facade window opening , partial block up rear facade kitchen sliding door and insert swing door opening .
5039/26received 13 Feb 2026decided 9 Apr 20261 units249 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
No publishable utility-capacity record within the radius. 15 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 14 Sept 2026, 15:45 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.