R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (4.1 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
Planning permission for the construction of (1) single storey extension to the front/side/rear of the existing dwelling, (2) the conversion of an existing single storey garden room in the rear garden into habitable space, (3) an attic conversion including a raised side gable wall, raised roof ridge and new roof profile to the front/side and rear including a dormer window to the rear, all associated site works and SUDs drainage.
We, InstaVolt Europe Limited, intend to apply for planning permission for development at the site: McDonald’s, Artane Castle Shopping Centre, Kilmore Rd, Dublin, D05 Y984. The development will consist of the installation of 2 no. electric vehicle (EV) chargers, ancillary equipment and all associated site development works.
We, InstaVolt Europe Limited, intend to apply for planning permission for development at the site: McDonald’s, Artane Castle Shopping Centre, Kilmore Rd, Dublin, D05 Y984. The development will consist of the installation of 2 no. electric vehicle (EV) chargers, ancillary equipment and all associated site development works.
WEB2665/26received 6 Jul 2026decided 7 Jul 2026150 m away
PERMISSION AND RETENTION is sought for the vehicular entrance from Ardbeg Park to 54 Ardbeg Park. Planning permission is sought for alterations to existing front garden wall and all associated site works at 54 Ardbeg Park, Artane, Dublin 5, D05 X6R3, for Ian Doody.
The development will consist of a partial ground floor only extension added to the existing extension to the rear of the existing house. The blocking of 1No. window & door at ground level on side elevation and to be replaced with 2No. new windows & 1No. door. A new flat roof dormer to the rear of the existing house roof. 1 No. new velux window to the front & side of the existing house roof. The window on front elevation ground level to be raised inline with window & door of existing house. Existing chimney to the side elevation to be demolished and all ancillary works.
5114/26received 24 Apr 2026decided 22 Jul 2026455 m away
RETENTION : Planning Permission is sought for the retention of and alterations to vehicular entrance, and all associated site works, from Ardbeg Park to 54 Ardbeg Park, Artane, Dublin 5, D05 X6R3, for Ian Doody.
WEB1928/26received 22 Apr 2026decided 23 Apr 2026353 m away
The development will consist of: The change of use of Unit 9B from light industrial use to self-storage facility.
Planning permission is also sought for alterations to the units comprising:
a) The creation of a new three-storey mezzanine floor structure and
b) Blocking up of an existing door on the ground floor of the northeast elevation.
WEB1670/26received 23 Mar 2026decided 31 Mar 2026251 m away
Planning permission for attic conversion with hip roof to gable and dormer to rear to accommodate stairs to allow conversion of attic as non habitable storage space, roof window to front all with associate ancillary works
WEB1384/26received 20 Feb 2026decided 14 Apr 202659 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 19 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Electricity Supply Board — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 12 Sept 2026, 23:19 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.