PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 4 Nov 2026, 15:44

Elm Mount Crescent

53.38457, -6.22337

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (98%). 53 homes approved 238 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares1
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 4 Nov 2026, 05:17
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
National Planning Application DatabaseCC BY 4.04 Nov 2026, 05:17open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 94–100% by type. A new house in a garden is harder: 79% approved, and 1 in 5 is asked for more information.

Single-storey rear65 decided · more info asked 20%
98% · council 97%
Two-storey rear34 decided · more info asked 29%
100% · council 96%
Two-storey side14 decided · more info asked 36%
100% · council 98%
Single-storey side13 decided · more info asked 15%
100% · council 99%
Attic or dormer244 decided · more info asked 9%
99% · council 96%
First-floor33 decided · more info asked 18%
94% · council 94%
Garage conversion39 decided · more info asked 15%
100% · council 99%
Porch or front20 decided · more info asked 10%
100% · council 97%
New house in a garden or site24 decided · more info asked 21%
79% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 486 nearby, 5,771 council-wide

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 approved
KindAppliedApprovedRefused
Dormer or attic11—
Rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 4 Nov 2026, 05:17
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 05:17open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 4 Nov 2026, 05:17
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 05:17open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 63 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 125 days; Appeal window: 4 weeks; If appealed: +129 days; Building starts: 122 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=436)55 daysIf more info asked (1 in 6)With further information: median 125 days (n=81)125 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 129 days (n=42, all appeals within 1.5 km)+129 daysBuilding startsStart notice: median 122 days after permission (n=241)122 days after permissionSigned off342 days after the start, for the few who file. 50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated517 decided home extensions, 246 start notices, 42 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    3 of 11 appealed refusals became permissions. 1 of 32 appealed approvals were reversed.

    Refusals appealed11 decided
    3 became permissions
    Approvals appealed32 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months
    • 502069 Pending · 2, Elm Mount Drive, Beaumont, Dublin 9, D09 DE63 · 427 m
    • 501811 Pending · 99, Elm Mount Avenue, Dublin 9, D09 V244 · 446 m
    • 501806 Pending · 7, Coolatree Road, Beaumont, Dublin 9, D09W861 · 490 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 4 Nov 2026, 05:17
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher3 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 05:17open
    Question 4

    What's changing around you?

    Street map around Elm Mount Crescent with 12 numbered planning items
    ⌖ the houseWindow closingApproved, not startedDerelict buildingBuilding startedApprovedRefused
    1. 117, Beaumont Crescent WEB3140/26Approved · 307 m
    2. 22 Montrose Park WEB1047/24Approved, no sign building has started · 238 m
    3. 3131 Elm Mount Road, Beaumont DS2356Derelict building · 470 m
    4. 49 Montrose Avenue, Dublin 5 WEB1299/26Building started · 134 m
    5. 59 Montrose Avenue, Dublin 5 WEB1299/26Approved · 119 m
    6. 639 Whitethorn Crescent, Dublin 5 3497/25Approved · 195 m
    7. 7236, Ardmore Drive WEB1273/26Approved · 395 m
    8. 842 Dromawling Road, Beaumont 3485/25Approved · 423 m
    9. 919, Elm Mount Park WEB1297/26Approved · 424 m
    10. 1042, Elm Mount Avenue WEB2034/26Approved · 446 m
    11. 11348 Ardmore Drive, Artane WEB1941/26Approved · 459 m
    12. 127, Coolatree Road WEB2308/26Refused · 490 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 89 permissions since 2016, 46 show a start notice and 6 have a completion certificate.

    101 applications lodged within 500 m. Council: 89 approved, 3 refused. After appeals: 89 approved. Of those: 6 signed off, 15 built with the owner's opt-out, 25 started, 43 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT89: lodged → approved3: lodged → refused9: lodged → withdrawn or invalid89: approved → approved1: refused → refused9: withdrawn or invalid → withdrawn1 refused by the council, undecided after an appeal1 refused by the council, withdrawn or invalid after an appeal43: approved → no start notice found15: approved → built, owner opted out25: approved → started, not signed off6: approved → signed off101 lodged101 lodged89 approved89 approved3 refused3 refused9 withdrawn or invalid9 withdrawn or invalid89 approved89 approved1 refused1 refused10 withdrawn10 withdrawn1 undecided1 undecided43 no start notice found43 no start notice found15 built, owner opted out15 built, owner opted out25 started, not signed off25 started, not signed off6 signed off6 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured101 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 17 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-17 WEB3140/26: GRANT PERMISSION — a single storey extension to the front and all associated windows, doors and site workstoday9 Nov14 Nov19 Nov24 Nov29 Nov4 DecWEB3140/26: GRANT PERMISSION — a single storey extension to the front and all associated windows, doors and site works · 307 m away · 2026-11-17
    Time to appeal ends
    • Time to appeal ends 17 Nov 202613 days left
      1WEB3140/26 · GRANT PERMISSION — a single storey extension to the front and all associated windows, doors and site works
      €220 to An Coimisiún Pleanála (€110 observer) · 307 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    53 homes 238 m away were approved Apr 2024 with no start notice yet; the permission runs to Apr 2029.

    2 Montrose Park · 53 homes: 53 homes approved Apr 2024, not started20242025202620272028202920302 Montrose Park · 53 homes238 m · WEB1047/2453 homes approved Apr 2024, not started53 homes approved Apr 2024, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 2 within 500 m

    Derelict building 1

    • 3131 Elm Mount Road, Beaumont · derelict since Sep 2026 · 470 m

    Approved, not started 1

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 4 Nov 2026, 05:17
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    Council meetings (ModernGov)Public4 Nov 2026, 02:32open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 05:17open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Figure 8

    Applications within 500 m, by year

    Between 12 and 28 a year; busiest 2024. 97% of decisions were approvals.

    2021: 17, 2022: 16, 2023: 17, 2024: 28, 2025: 12, 2026: 1101020302021: 15 approved2021: 2 withdrawn or invalid17’21*2022: 15 approved2022: 1 refused16’222023: 16 approved2023: 1 withdrawn or invalid17’232024: 26 approved2024: 1 refused2024: 1 withdrawn or invalid28’242025: 10 approved2025: 2 withdrawn or invalid12’252026: 7 approved2026: 1 refused2026: 3 withdrawn or invalid11’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 13 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 4 Nov 2026, 05:17
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 05:17open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
    Building work nearby 6 in the last 12 months
    6 no sign-off needed
    • 49 Montrose Avenue, Dublin 5, D05 V504 · 30 Sept 2026 · start notice, opted out no sign-off needed · WEB1299/26 · 134 m
    • 6 Dromeen Avenue, Dublin 9, D09 F6P4 · 21 Sept 2026 · short notice no sign-off needed · WEB5552/25 · 433 m
    • 348 Ardmore Drive, Dublin 5, D05 XR68 · 17 Sept 2026 · short notice no sign-off needed · WEB1941/26 · 476 m
    • 1 Elm Mount Drive, Dublin 9, D09 PF60 · 17 Aug 2026 · start notice, opted out no sign-off needed · 320 m
    • 11 Elm Mount Lawn, Dublin 9, D09 X074 · 2 Jul 2026 · short notice no sign-off needed · 3267/24 · 218 m
    • 42 Dromawling Road, Dublin, Dublin 9, D09 EE36 · 9 Apr 2026 · short notice no sign-off needed · 3485/25 · 442 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 4 Nov 2026, 03:43
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
    Homes coming 53 not started
    • 22 Montrose Park · 53 homes · not started · runs out 10 Apr 2029 · 238 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 4 Nov 2026, 05:17
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 05:17open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    2 Montrose Park53—223 m
    Beaumont Road and Beaumont Drive In99—848 m
    Beaumont Road and Beaumont Grove Development99—848 m
    Cromcastle Court and Old Coal Yard152152 not started (2026-Q2)950 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Beaumont Pre- School Community Playgroup · Crèche21 May 2025 · report · Tusla Early Years Inspectorate355 m
    Happyways Artane Beaumont · Crèche3 Apr 2025 · report · Tusla Early Years Inspectorate431 m
    Tots & Co.Childcare · Crèche15 Jan 2025 · report · Tusla Early Years Inspectorate493 m
    Little Steps · Crèche11 Jun 2026 · report · Tusla Early Years Inspectorate571 m
    Theresa's Playgroup · Crèche17 Oct 2024 · report · Tusla Early Years Inspectorate652 m
    Little Rascals / Clever Cloggs · Crèche22 Jan 2025 · report · Tusla Early Years Inspectorate663 m
    Artane Montessori Circle · Crèche2 Sept 2024 · report · Tusla Early Years Inspectorate667 m
    Carousel Day Nursery · Crèche13 Apr 2026 · report · Tusla Early Years Inspectorate691 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 4 Nov 2026, 05:17
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.02 Nov 2026, 23:01open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 05:17open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Quieter than most of Dublin City Council.
    Homes approved
    Here53
    Council middle50
    Homes started
    Here7
    Council middle125
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 4 Nov 2026, 05:17
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 05:17open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    87% owner-occupied (council 47%).

    Homes built before 1971
    42% · council 52%
    Homes built since 2001
    5% · council 19%
    Owner-occupied
    87% · council 47%
    Rented
    7% · council 45%
    Children under 15
    13% · council 15%
    Aged 65 and over
    36% · council 13%
    Households with 2+ cars
    35% · council 19%
    Work mainly from home
    15% · council 12%
    This small area (324 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268026011

    Bus
    31 m
    Skelly's Lane · 104, 14 · busiest stop within 500 m: 7 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    352 m
    St Fiachras Sen NS, 609 pupils
    Homes sold nearby
    45
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • St Fiachras Sen NS · primary · 609 pupils · 352 m
    • Scoil Fhiachra Soisir · primary · 557 pupils · 404 m
    • St Davids NS · primary · 308 pupils · 430 m
    • Our Lady Of Mercy College · postprimary · 407 pupils · 546 m
    • St. David's College · postprimary · 550 pupils · 548 m
    • St John Of God NS · primary · 182 pupils · 694 m
    • St Pauls Hospital Special School · primary · 54 pupils · 824 m
    • Beaumont Hospital Special School · primary · 9 pupils · 834 m

    Stops 55

    • Skelly's Lane · 104, 14 · 6/hour at peak · 31 m
    • Skelly's Lane · 104, 14 · 7/hour at peak · 48 m
    • Whitethorn Rise · 104, 14 · 6/hour at peak · 209 m
    • Whitethorn Rise · 104, 14 · 7/hour at peak · 253 m
    • Beaumont Crescent · 14 · 5/hour at peak · 326 m
    • Beaumont Crescent · 104, 14 · 7/hour at peak · 432 m
    • Artaine Castle · 14 · 6/hour at peak · 479 m
    • Artaine Castle · 14 · 5/hour at peak · 482 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Fiachras Sen NS · 352 m-3.8% pupils (609)
    • Scoil Fhiachra Soisir · 404 m-4.3% pupils (557)
    • St Davids NS · 430 m+10.8% pupils (308)
    • Our Lady Of Mercy College · 546 m+7.4% pupils (407)
    • St. David's College · 548 m+8.9% pupils (550)
    • St John Of God NS · 694 m-3.7% pupils (182)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.12 ha · 35 m
    • Dublin City Council · 0.18 ha · 62 m
    • Dublin City Council · 0.58 ha · 75 m
    • Dublin City Council · 0.78 ha · 392 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Nov 2026, 05:17
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 05:17open
    Council consultation portalsPublic4 Nov 2026, 01:13open
    Council meetings (ModernGov)Public4 Nov 2026, 02:32open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. 53 homes approved 238 m away (2 Montrose Park), not started: what is planned?
      Ask for: The planning file for WEB1047/24.
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Beaumont F
    Electoral area
    Clontarf
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 2 sites nearby could change: 1 derelict, 1 approved scheme.
    • 53 homes approved nearby, not started; largest 53 at 2 Montrose Park.
    • Beaumont Crescent (bus 104, 14) 432 m away: 7 an hour at morning peak; 50 from all stops within 500 m.
    • Here (2022 census): 87% owner-occupied (council 47%); 2% of homes empty (council 8%); most built 1971–1980; 49% drive to work (council 28%); population up 8% since 2016.
    • 2 home extensions within 250 m since 2025.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • Homes started within 1 km: 2 in the last year, 120 three years before.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.04 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public4 Nov 2026
    www2.courts.ie—© the publisher3 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.02 Nov 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public4 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.04 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence4 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 4 Nov 2026, 15:44 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.