An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
NIAH-recorded building
1
Westmanstown House
Radon risk area
4
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
a 10-year approval for development at this site consisting of up to approximately 15.05 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) and all associated site and development works at various locations in County Kildare with a total site area of c. 16.13ha. The proposed development crosses the townlands of Cullaghreeva, Confey, Newtown, Leixlip, Kellystown, Sion, Ravensdale, Blakestown, Collinstown, Greenfield, Dowdstown and Railpark.
The proposed development consists of the following elements: Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Kildare County Council (KCC) as outlined below and illustrated on the maps herein: The proposed Coolmine cable route section in KCC (shown in purple) is approximately 1 km in length crossing the townlands of Cullaghreeva and Confey from east to west. The proposed Leixlip cable route section in KCC (shown in blue) is approximately 11.51 km in length crossing the townlands of Newtown, Confey, Leixlip, Kellystown, Sion, Ravensdale, Blakestown and Collinstown from east to west. There are two Protected Structures located within the application area of the Leixlip cable route, Deey Bridge and Lock (RPS B06-14) and Sandford Bridge (RPS B06-16). The proposed Moneycooley cable route is wholly within KCC (shown in orange) and is approximately 2.54 km in length crossing the townlands of Greenfield, Dowdstown and Railpark from south to north. The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232). The proposed underground cable routes will incorporate the following elements: - Communication links and fibre optic cables between all substations in the same trench as the UGC; Joint bays and communication chambers along the UGC alignment; Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings; - All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the Application
a 10-year approval for development at this site consisting of up to approximately 15.05 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) and all associated site and development works at various locations in County Kildare with a total site area of c. 16.13ha. The proposed development crosses the townlands of Cullaghreeva, Confey, Newtown, Leixlip, Kellystown, Sion, Ravensdale, Blakestown, Collinstown, Greenfield, Dowdstown and Railpark.
The proposed development consists of the following elements: Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Kildare County Council (KCC) as outlined below and illustrated on the maps herein: The proposed Coolmine cable route section in KCC is approximately 1 km in length crossing the townlands of Cullaghreeva and Confey from east to west. - The proposed Leixlip cable route section in KCC is approximately 11.51 km in length crossing the townlands of Newtown, Confey, Leixlip, Kellystown, Sion, Ravensdale, Blakestown and Collinstown from east to west. - The proposed Moneycooley cable route is wholly within KCC and is approximately 2.54 km in length crossing the townlands of Greenfield, Dowdstown and Railpark from south to north. The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232). The proposed underground cable routes will incorporate the following elements: • Communication links and fibre optic cables between all substations in the same trench as the UGC; • Joint bays and communication chambers along the UGC alignment; • Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings; • All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance
Refer to the enclosed site and newspaper notices for a full description of development.
the development consists of 1. The construction of a 4-no. bed 2 storey type dwelling 2. To upgrade the existing site entrance to a private entrance 3. To remove the existing non-native irish planting species and replace with semimature indigenous planting and set back 3m from the road frontage behind the timber & post fence and a new 3m grass verge to allow for proper unobstructed sightlines of 90m and all ancillary site development works
2561218received 9 Nov 2025decided 9 Jan 20261 units531 m away
the construction of a single storey bungalow, single storey domestic garage, secondary effluent treatment system, upgrade existing agricultural entrance to shared double recessed entrance and all associated site works
2561175received 16 Oct 2025decided 24 Mar 20261 units190 m away
for (A) erection of a one and a half storey type house (B) garage / fuel store for domestic use (C) the installation of a proprietary waste water treatment system and raised soil polishing filter percolation area and (D) provision of a recessed vehicular entrance and access driveway and all associated site works
2460685received 18 Jul 2024decided 19 Mar 20251 units0 m away
for (A) erection of a one and a half storey type house (B) garage / fuel store for domestic use (C) the installation of a proprietary waste water treatment system and raised soil polishing filter percolation area and (D) provision of a recessed vehicular entrance and access driveway and all associated site works
2460045received 24 Jan 2024decided 14 Mar 20241 units0 m away
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
No publishable utility-capacity record within the radius. 4 records from Esb substation, Wastewater, Water withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
all-rights-reserved (water.ie terms cl. 2.1, personal/non-commercial); NOT covered by UÉ's CC-BY-4.0 open-data grant · not redistributable — shown as a flag only
all-rights-reserved (water.ie terms cl. 2.1, personal/non-commercial); NOT covered by UÉ's CC-BY-4.0 open-data grant · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 15 Sept 2026, 14:30 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.