PlanningRegister.ie
Planning report · Fingal County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 23:52

Aldermere Drive

53.38743, -6.42673

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (91%). 56 homes approved 312 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Natural heritage areas1Royal Canal
Heritage inventory buildings1Saint Mary's Church (Clonsilla)
Radon grid squares3
Protected buildings2Allandale; St. Mary's Church (CofI)
Monuments4Church; Graveyard
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 12 on the draft 2027 map; 12 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Records of Protected Structures, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–100% by type. A new house in a garden is harder: 60% approved, and 1 in 3 is asked for more information.

Single-storey rear25 decided · more info asked 8%
88% · council 92%
Single-storey side10 decided · more info asked 10%
100% · council 93%
Attic or dormer142 decided · more info asked 4%
92% · council 92%
New house in a garden or site15 decided · more info asked 40%
60% · council 53%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 192 nearby, 2,316 council-wide

Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m

Extensions and refusals near you 4 extensions within 250 m · the last 12 months

3 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic43—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 49 days. 1 in 14 is asked for more information, which adds about 84 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 49 days; Appeal window: 4 weeks; If appealed: +119 days; Building starts: 121 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 46–53 (n=207)49 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 119 days (n=33, all appeals within 1.5 km)+119 daysBuilding startsStart notice: median 121 days after permission (n=83)121 days after permissionSigned off40% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated222 decided home extensions, 83 start notices, 33 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    6 of 19 appealed refusals became permissions. 0 of 14 appealed approvals were reversed.

    Refusals appealed19 decided
    6 became permissions
    Approvals appealed14 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501463 Invalid · 45 The Lawn, Hansfield Wood, Clonsilla, Dublin 15, D15 C2PK · 496 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 23:12
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 4

    What's changing around you?

    Street map around Aldermere Drive with 15 numbered planning items
    ⌖ the houseApproved, not startedBuilding startedEmpty land zoned for homesApprovedNo decision yet
    1. 1Lands South of Allendale House FW24A/0388EApproved, no sign building has started · 313 m
    2. 27 Aldemere Close, Dublin 15 FW23B/0036Building started · 60 m
    3. 37.3 ha zoned for homesEmpty land zoned for homes · 153 m
    4. 40.5 ha zoned for homesEmpty land zoned for homes · 174 m
    5. 50.6 ha zoned for homesEmpty land zoned for homes · 216 m
    6. 60.4 ha zoned for homesEmpty land zoned for homes · 247 m
    7. 70.3 ha zoned for homesEmpty land zoned for homes · 311 m
    8. 80.6 ha zoned for homesEmpty land zoned for homes · 362 m
    9. 923 Porters Gate Way, Clonsilla FW26A/0106EApproved · 196 m
    10. 1035 Mount Symon Dale, Clonsilla FW26A/0232EApproved · 231 m
    11. 1119 Mount Symon Crescent, Clonsilla FW26A/0363ENo decision yet · 248 m
    12. 1243 Mount Symon Dale, Clonsilla FW25A/0488EApproved · 258 m
    13. 138 Porters Gate, Clonsilla FW26A/0020No decision yet · 298 m
    14. 14Allendale House, Clonsilla FW26A/0349ENo decision yet · 352 m
    15. 153 Porters Gate View, Clonsilla FW26A/0319ENo decision yet · 359 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 55 permissions since 2016, 20 show a start notice and 0 have a completion certificate.

    77 applications lodged within 500 m. Council: 56 approved, 4 refused. After appeals: 55 approved. Of those: 0 signed off, 7 built with the owner's opt-out, 13 started, 35 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT56: lodged → approved4: lodged → refused11: lodged → withdrawn or invalid6: lodged → undecided55: approved → approved3: refused → refused11: withdrawn or invalid → withdrawn6: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, withdrawn or invalid after an appeal35: approved → no start notice found7: approved → built, owner opted out13: approved → started, not signed off77 lodged77 lodged56 approved56 approved4 refused4 refused11 withdrawn or invalid11 withdrawn or invalid6 undecided6 undecided55 approved55 approved3 refused3 refused13 withdrawn13 withdrawn6 undecided6 undecided35 no start notice found35 no start notice found7 built, owner opted out7 built, owner opted out13 started, not signed off13 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured77 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Approved, stalled or planned, not built yet

      56 homes 312 m away were approved Aug 2025 with no start notice yet; the permission runs to Aug 2030. DART+ West is planned 394 m away.

      Lands South of Allendale… · 56 homes: 56 homes approved Aug 2025, not started; DART+ West, DART+ West:…: railway order granted (July 2024); DART+ West, Clonsilla: railway order granted (July 2024)20242025202620272028202920302031Lands South of Allendale… · 56 homes312 m · FW24A/0388E56 homes approved Aug 2025, not started56 homes approved Aug 2025, not startedDART+ West, DART+ West:…394 m · plannedrailway order granted (July 2024)DART+ West, Clonsilla549 m · plannedrailway order granted (July 2024)today

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 11 within 500 m

      Approved, not started 1

      Empty land zoned for homes 10

      • 37.3 ha zoned for homes · no homes built on it yet · 153 m
      • 40.5 ha zoned for homes · no homes built on it yet · 174 m
      • 50.6 ha zoned for homes · no homes built on it yet · 216 m
      • 60.4 ha zoned for homes · no homes built on it yet · 247 m
      • 70.3 ha zoned for homes · no homes built on it yet · 311 m
      • 80.6 ha zoned for homes · no homes built on it yet · 362 m
      • 2.1 ha zoned for homes · no homes built on it yet · 415 m
      • 0.5 ha zoned for homes · no homes built on it yet · 427 m
      • 0.6 ha zoned for homes · no homes built on it yet · 448 m
      • 1.2 ha zoned for homes · no homes built on it yet · 478 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public31 Oct 2026, 02:21open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 7 and 18 a year; busiest 2025. 93% of decisions were approvals.

      2021: 12, 2022: 12, 2023: 7, 2024: 13, 2025: 18, 2026: 15051015202021: 11 approved2021: 1 withdrawn or invalid12’21*2022: 11 approved2022: 1 withdrawn or invalid12’222023: 6 approved2023: 1 refused7’232024: 8 approved2024: 1 refused2024: 4 withdrawn or invalid13’242025: 12 approved2025: 2 refused2025: 4 withdrawn or invalid18’252026: 8 approved2026: 1 withdrawn or invalid2026: 6 undecided15’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 21 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Building work nearby 7 in the last 12 months
      1 not signed off6 no sign-off needed
      • 27 Aldemere Close, Dublin 15, Dublin, D15 E0HH · 1 Oct 2026 · start notice, opted out no sign-off needed · FW23B/0036 · 60 m
      • 5 Allendale Copse, Killberry, Fingal, D15 R3N0 · 15 May 2026 · 1 homes · start notice, opted out no sign-off needed · FW25A/0203E · 438 m
      • 9 Allendale Close, Fingal, D15 A2R2 · 30 Mar 2026 · 1 homes · short notice no sign-off needed · FW25A/0473E · 425 m
      • CLONSILLA ROAD, CLONSILLA, Fingal, D15 T2FW · 16 Mar 2026 · start notice not signed off · 409 m
      • 8 Mount Symon Park, Fingal, D15 X2W8 · 10 Feb 2026 · short notice no sign-off needed · FW25A/0288E · 369 m
      • 10 Porter's Gate Grove, Clonsilla, Fingal, D15 HPA4 · 20 Jan 2026 · 1 homes · short notice no sign-off needed · FW25A/0371 · 300 m
      • 8 Porter's Gate Grove, Clonsilla, Fingal, D15 A0XW · 10 Nov 2025 · 1 homes · short notice no sign-off needed · FW24A/0357 · 311 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Homes coming 56 not started
      • Clonsilla Grove Apartments, Clonsilla Road, Clonsilla, Dublin 15 (Phase 1) · Completed · 12 homes · 342 m
      • St Joseph’s, Clonsilla, Dublin 15 (Phase 1)* · Stage 4 tender approval · 46 homes · 342 m
      • St Joseph’s, Clonsilla, Dublin 15 (Phase 2)* · Stage 4 tender approval · 44 homes · 342 m
      • St Joseph’s, Clonsilla, Dublin 15 (Phase 3) · Stage 4 tender approval · 23 homes · 342 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Zone 6 Hansfield SDZ376376 not started (2026-Q2)201 m
      Lands South of Allendale House5656 not started (2026-Q2)234 m
      Clonsilla Road10236 built · 66 being built (2026-Q2)380 m
      Clonsilla Development174174 not started (2026-Q2)383 m
      The Lodge, Clonsilla Road5959 being built (2026-Q2)467 m
      Zone 7 'Railway'616491 built · 125 not started (2026-Q2)586 m
      Being part of Zone 1 'Main Street North' of the Hansfield SD2828 built (2025-Q4)761 m
      Zone 7 "Railway"7979 not started (2026-Q2)824 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Sticky Fingers · Crèche11 Nov 2025 · report · Tusla Early Years Inspectorate154 m
      Treehouse Childcare · Crèche9 Jul 2025 · report · Tusla Early Years Inspectorate493 m
      Hartstown Montessori School · Crèche1 Sept 2025 · report · Tusla Early Years Inspectorate778 m
      Tir na Nog Hartstown · Crèche4 Sept 2025 · report · Tusla Early Years Inspectorate811 m
      Lollipops Centre Limited · Crèche10 May 2024 · report · Tusla Early Years Inspectorate874 m
      Busy Buzzing Bees Childcare Ltd. · Crèche25 Jun 2024 · report · Tusla Early Years Inspectorate943 m
      Once Upon a Time · Crèche9 Dec 2025 · report · Tusla Early Years Inspectorate948 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Fingal County Council.
      Homes approved
      Here115
      Council middle0
      Homes started
      Here732
      Council middle3
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      1% of homes built before 1971 (council 11%). 68% owner-occupied (council 67%).

      Homes built before 1971
      1% · council 11%
      Homes built since 2001
      41% · council 43%
      Owner-occupied
      68% · council 67%
      Rented
      26% · council 28%
      Children under 15
      20% · council 22%
      Aged 65 and over
      4% · council 11%
      Households with 2+ cars
      42% · council 42%
      Work mainly from home
      12% · council 12%
      This small area (257 people)Fingal

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267028095

      Aircraft noise
      45–49 dB
      day–night average (EPA 2022) · airport noise zone D
      Bus
      132 m
      St Joseph's Centre · 39 · busiest stop within 500 m: 9 an hour at peak
      Planned
      394 m
      DART+ West, DART+ West: Clonsilla - M3 Parkway
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      810 m
      St Ciarans NS, 530 pupils
      Homes sold nearby
      65
      in 3 years, 19 new (Property Price Register)
      Schools, stops and the council

      Schools

      • St Ciarans NS · primary · 530 pupils · 810 m

      Stops 30

      • St Joseph's Centre · 39 · 2/hour at peak · 132 m
      • St Joseph's Centre · 39 · 4/hour at peak · 139 m
      • Allendale Square · 39 · 2/hour at peak · 300 m
      • Allendale Square · 39 · 4/hour at peak · 305 m
      • Stonebridge Road · 139, 39A, 39X · 4/hour at peak · 391 m
      • Stonebridge Road · 139, 39A, 39X · 9/hour at peak · 416 m
      • Allendale Close · 139, 39A, 39X · 4/hour at peak · 426 m
      • Allendale Close · 139, 39A, 39X · 9/hour at peak · 428 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Ciarans NS · 810 m-4.3% pupils (530)

      Council meetings 30 items

      Public land

      • Fingal County Council · 3.1 ha · 52 m
      • Fingal County Council · 1.34 ha · 239 m
      • Fingal County Council · 0.51 ha · 339 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
      Council consultation portalsPublic31 Oct 2026, 01:06open
      Council meetings (ModernGov)Public31 Oct 2026, 02:21open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Building work started 60 m away: for how long?
        Ask for: The planning conditions for FW23B/0036.
        Agent · council
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Clonsilla
      Electoral division
      Blanchardstown-Blakestown
      Electoral area
      Ongar
      Council
      Fingal County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
      • 56 homes approved nearby, not started; largest 56 at Lands South of Allendale House.
      • Stonebridge Road (bus 139, 39A) 416 m away: 9 an hour at morning peak; 43 from all stops within 500 m. Planned: DART+ West 394 m away, railway order granted (July 2024).
      • Noise from aircraft mapped at 45–49 dB (day-evening-night average, EPA 2022); inside Dublin Airport Noise Zone D.
      • Here (2022 census): 68% owner-occupied (council 67%); 4% of homes empty (council 5%); most built 1991–2000; 49% drive to work (council 52%); population up 13% since 2016.
      • 4 home extensions within 250 m since 2026. Most were dormers or attic conversions.
      • Around here the council decides in a median 52 days (about 7 weeks); 1 in 7 is asked for more information.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 31
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 31 Oct 2026, 23:52 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.