R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (1.57 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
Development will consist of a proposed new ground floor only porch to the front of the existing house. Changing the existing garage door with a new bay window and converting garage to habitable space. A new first floor extension to the side of the existing house extending pass the rear existing house line. A new dutch hip gable roof over new first floor extension to side. A proposed new ground floor only extension to the rear of the existing house. 1No. new flat roof dormer to the rear of the existing house roof. 2No. new velux windows to the front of the existing house roof and all ancillary works.
The development will consist of:
a) The construction of a single-storey extension to the side of the existing dwelling;
b) The construction of a first-floor extension to the rear of the dwelling, above the existing ground-floor extension;
c) The installation of 2 no. rooflights to the rear pitch of the main roof and 1 no. rooflight to the flat roof of the proposed side extension;
d) All associated site, drainage, and landscaping works.
WEB2881/26received 29 Jul 2026decided 30 Jul 2026757 m away
The development will consist of
(a) The construction of a single storey ESB substation, adjoined electrical switch room and associated site works
(b) Fenced bin storage area
The development will consist of (a) The construction of a single storey ESB substation, adjoined electrical switch room and associated site works (b)Fenced bin storage area.
WEB2800/26received 21 Jul 2026decided 23 Jul 2026502 m away
Conversion of attic to form new room with stairs, build up of gable wall at attic level to form gable end roof with flat roof dormer with 2 no. windows to the rear roof, 1 no. window to side gable wall and all associated site works.
WEB2292/26received 27 May 2026decided 20 Jul 2026541 m away
The development will consist of (a) Second level extension above ground floor garage/kitchen with flat roof, (b) Enhance the exterior insulation; wrapping the house, with a smooth render finish and keeping the brick/stone under the left window (c) Extend the vehicular access to 3.5m (d) Extension to the rear under the 40sqm with internal alterations to ground floor, and all associated site and landscaping works.
WEB2213/26received 19 May 2026decided 9 Jul 2026219 m away
Permission is sought for extension and alteration works including a single storey ground floor extension with entrance canopy; and alterations to provide gated vehicular access off Gracefield Road for the provision of off-street parking; works consisting of
creating an opening in the existing front garden boundary wall, adding 2 no. new pillars and closing the existing pedestrian gate access, including all associated site works, all to the front of 76 Gracefield Road, Artane, Dublin 5, D05 AE62 by Marie Devlin
WEB2125/26received 7 May 2026decided 29 Jun 2026978 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
No publishable utility-capacity record within the radius. 53 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 15 Sept 2026, 06:59 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.