Homes here mostly date from the 2010s. 2 planning files on this house, the latest from 2011. Most home extensions nearby get approved (89%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2011–15, around when building records went online (2014). 2 planning files on this house, the latest from 2012.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2011–2015. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2011–2015 (census estimate)most built2012: F11B/0213 · extension, approved2011: F11B/0206 · extension, withdrawn or invalid

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2012
    F11B/0213 · extension · approved 2012 · built? unknown
    approvedstarted?signed off?
  2. 2011
    F11B/0206 · extension · withdrawn
    approved?started?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

FINGAL_DP_OWN · — – —

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Protected building1 within 100 m Milestone
Heritage inventory1 within 100 m milestone/milepost
Monument zone1 within 100 m Burial ground, Burrow (Coolock By., Howth Ed)
Conservation area1 within 100 m Sutton - Sutton Cross and Environs ACA
Radon1 in 20 homes have high radon (EPA)

Not on this site: EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Conservation areas1Sutton - Sutton Cross and Environs ACA
Natural heritage areas2Baldoyle Bay; North Dublin Bay
Heritage inventory buildings14house; Ashford House
Radon grid squares3
Protected buildings5Sutton Railway Station; Station Master's House
EU nature sites2Baldoyle Bay SAC; North Dublin Bay SAC
Monuments4Burial ground; Burial mound
EU bird sites2North Bull Island SPA; Baldoyle Bay SPA
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: zoning, constraints.aca, constraints.niah, constraints.radon, constraints.smr, rps.fingal, rzlt, constraints, constraints.flood_cfram, constraints.nha, constraints.rps, constraints.sac, constraints.spa · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
constraints.acaCC-BY-4.0 (Fingal); public/attribution, unconfirmed (DLR)27 Sept 2026, 19:36open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
rps.fingalCC-BY-4.0—open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.flood_cframCC-BY-NC-ND-4.0 · not redistributable — shown as a flag only11 Sept 2026, 19:11open
constraints.nhaCC-BY-4.027 Sept 2026, 19:27open
constraints.rpsCC-BY-4.0 (Fingal); public/attribution, unconfirmed (DLR)27 Sept 2026, 19:36open
constraints.sacCC-BY-4.027 Sept 2026, 19:27open
constraints.spaCC-BY-4.027 Sept 2026, 19:27open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 12 Oct 2026, 00:09
SourceLicenceFetchedLink
bcmsCC-BY-4.012 Oct 2026, 00:09open
npadCC-BY-4.012 Oct 2026, 01:44open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 81–100% by type. A new house in a garden is harder: 55% approved, and 1 in 2 are asked for more information.

Single-storey rear50 decided · more info asked 14%
94% · council 94%
Two-storey rear12 decided · more info asked 50%
100% · council 86%
Single-storey side12 decided · more info asked 42%
100% · council 95%
Attic or dormer74 decided · more info asked 18%
82% · council 90%
First-floor19 decided · more info asked 16%
84% · council 86%
Garage conversion12 decided · more info asked 8%
100% · council 91%
Porch or front16 decided · more info asked 12%
81% · council 94%
New house in a garden or site29 decided · more info asked 52%
55% · council 60%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 224 nearby, 4,964 council-wide

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 no decision or withdrawn
KindAppliedApprovedRefused
Porch20—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 12 Oct 2026, 01:44
    SourceLicenceFetchedLink
    npadCC-BY-4.012 Oct 2026, 01:44open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 51 days. 1 in 5 is asked for more information, which adds about 67 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 5): 93 days; Appeal window: 4 weeks; If appealed: +124 days; Building starts: 142 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 47–55 (n=211)51 daysIf more info asked (1 in 5)With further information: median 93 days (n=27)93 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 124 days (n=78, all appeals within 1.5 km)+124 daysBuilding startsStart notice: median 142 days after permission (n=138)142 days after permissionSigned off386 days after the start, for the few who file. 47% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated262 decided home extensions, 138 start notices, 78 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    17 of 33 appealed refusals became permissions. 3 of 45 appealed approvals were reversed.

    Refusals appealed33 decided
    17 became permissions
    Approvals appealed45 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501606 Pending · 1 Station Road Cottages, Sutton, Dublin 13, Co. Dublin, D13XP44 · 373 m
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved12 Oct 2026, 01:27open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Question 4

    What's changing around you?

    Street map around Burrow Heath, Sutton Cross with 11 numbered planning items
    ⌖ the houseOpen for commentsNo decision yetApprovedRefused
    1. 11a Burrow Road, Sutton F26A/0907ENo decision yet · 273 m
    2. 2Camross, 134 Dublin Rd. F26A/0804ENo decision yet · 66 m
    3. 3St. Fintan's High School, Dublin Road F25A/1091EApproved · 173 m
    4. 4The Marine Hotel, 13 Sutton Cross F25A/0884ENo decision yet · 261 m
    5. 5Waters Edge, No. 19 Greenfield Rd F26A/0425EApproved · 373 m
    6. 61 Station Road Cottages, Sutton F26A/0279ERefused · 373 m
    7. 71 Station Road Cottages, Sutton F25A/1093ERefused · 373 m
    8. 820 Binn Eadair View, Sutton F26A/0746ENo decision yet · 447 m
    9. 911 Station Road Cottages, Sutton F26A/0630EApproved · 475 m
    10. 1024 James McCormack Gardens, Sutton F26A/0156EApproved · 477 m
    11. 11176 Howth Road, Sutton F26A/0033ENo decision yet · 479 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 92 permissions since 2016, 46 show a start notice and 10 have a completion certificate.

    128 applications lodged within 500 m. Council: 91 approved, 13 refused. After appeals: 92 approved. Of those: 10 signed off, 16 built with the owner's opt-out, 20 started, 46 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT91: lodged → approved13: lodged → refused20: lodged → withdrawn or invalid4: lodged → undecided89: approved → approved9: refused → refused20: withdrawn or invalid → withdrawn4: undecided → undecided1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal3 refused by the council, approved after an appeal1 refused by the council, undecided after an appeal46: approved → no start notice found16: approved → built, owner opted out20: approved → started, not signed off10: approved → signed off128 lodged128 lodged91 approved91 approved13 refused13 refused20 withdrawn or invalid20 withdrawn or invalid4 undecided4 undecided92 approved92 approved10 refused10 refused21 withdrawn21 withdrawn5 undecided5 undecided46 no start notice found46 no start notice found16 built, owner opted out16 built, owner opted out20 started, not signed off20 started, not signed off10 signed off10 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured128 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 11 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-11 F26A/0907E: application received — Planning Permission for a) construction of a ground-floor extension to the side/rear of the existing dwelling, b) constrtoday17 Oct22 Oct27 Oct1 Nov6 Nov11 NovF26A/0907E: application received — Planning Permission for a) construction of a ground-floor extension to the side/rear of the existing dwelling, b) constr · 273 m away · 2026-11-11
    Comments close
    • Comments close 11 Nov 202630 days left
      1F26A/0907E · application received — Planning Permission for a) construction of a ground-floor extension to the side/rear of the…
      €20 to the council · 273 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Applications within 500 m, by year

    Between 8 and 20 a year; busiest 2019. 88% of decisions were approvals.

    2016: 4, 2017: 15, 2018: 12, 2019: 20, 2020: 8, 2021: 11, 2022: 8, 2023: 10, 2024: 10, 2025: 18, 2026: 12051015202016: 4 approved4’16*2017: 12 approved2017: 3 refused15’172018: 8 approved2018: 4 withdrawn or invalid12’182019: 17 approved2019: 3 withdrawn or invalid20’192020: 6 approved2020: 2 withdrawn or invalid8’202021: 8 approved2021: 3 refused11’212022: 8 approved8’222023: 8 approved2023: 2 refused10’232024: 6 approved2024: 2 refused2024: 2 withdrawn or invalid10’242025: 10 approved2025: 2 refused2025: 6 withdrawn or invalid18’252026: 4 approved2026: 1 refused2026: 3 withdrawn or invalid2026: 4 undecided12’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 14 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 12 Oct 2026, 01:44
    SourceLicenceFetchedLink
    npadCC-BY-4.012 Oct 2026, 01:44open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    Building work nearby 6 in the last 12 months
    2 signed off as finished2 not signed off2 no sign-off needed
    • 23 James McCormack Gardens, Dublin 13, Dublin, D13 X9K0 · 6 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · F26A/0156E · 489 m
    • 177 Howth Road, Dublin 13, Dublin, D13 T8P7 · 9 Jun 2026 · 1 homes · start notice not signed off · F25A/0532E · 471 m
    • Howth Road,, Sutton, Dublin 13, Fingal · 3 Apr 2026 · 4 homes · start notice not signed off · F23A/0205 & ABP-317579-23 · 410 m
    • Dublin Road, Dublin, Fingal · 6 Mar 2026 · 7-day notice signed off · 239 m
    • Dublin Road, Sutton, Dublin 13, Fingal · 15 Dec 2025 · 7-day notice signed off · 238 m
    • 18 James McCormack Gardens, Burrow, Fingal, D13 R2V4 · 13 Nov 2025 · start notice, opted out no sign-off needed · F24A/0353E · 461 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 12 Oct 2026, 00:09
    SourceLicenceFetchedLink
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    npadCC-BY-4.012 Oct 2026, 01:44open
    social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Santa Sabina——807 m

    Who applies most nearby

    • Foxtrot Haus Ltd. — 2 applications, latest 3 Sept 2026

    Crèches and schools inspected

    NameLatest inspectionDistance
    Rainbow Montessori Sutton · Crèche30 Jan 2026 · report · Tusla Early Years Inspectorate137 m
    Sutton Little People · Crèche6 Jan 2026 · report · Tusla Early Years Inspectorate607 m
    Isabella's Childcare · Crèche26 Nov 2025 · report · Tusla Early Years Inspectorate791 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: dublin_pipeline, npad, organisations, schools, tusla_ey · fetched 5 Oct 2026, 23:01
    SourceLicenceFetchedLink
    dublin_pipelineCC-BY-4.05 Oct 2026, 23:01open
    npadCC-BY-4.012 Oct 2026, 01:44open
    organisationsn/a — derived; organisations only; DLR-sourced links withheld11 Oct 2026, 23:05—
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area Busier than most of Fingal County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here28
    Council middle3
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    35% of homes built before 1971 (council 11%). 78% owner-occupied (council 67%).

    Homes built before 1971
    35% · council 11%
    Homes built since 2001
    38% · council 43%
    Owner-occupied
    78% · council 67%
    Rented
    18% · council 28%
    Children under 15
    23% · council 22%
    Aged 65 and over
    17% · council 11%
    Households with 2+ cars
    50% · council 42%
    Work mainly from home
    18% · council 12%
    This small area (427 people)Fingal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267130019

    Bus
    95 m
    Sutton · 31n, 6, H3 · busiest stop within 500 m: 7 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    239 m
    St. Fintan's High School, 714 pupils
    Homes sold nearby
    40
    in 3 years, 7 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St. Fintan's High School · postprimary · 714 pupils · 239 m
    • Burrow NS · primary · 195 pupils · 963 m
    • Santa Sabina Dominican College · postprimary · 754 pupils · 984 m

    Stops 29

    • Sutton · 31n, 6, H3 · 3/hour at peak · 95 m
    • St Fintans High Sch · 6, H3 · 3/hour at peak · 197 m
    • Sutton · DART · 7/hour at peak · 237 m
    • Sutton Stn · 102, 102A, 102C, 102T · 3/hour at peak · 245 m
    • St Fintans High Sch · 31n, 6, H3 · 3/hour at peak · 247 m
    • Sutton Cross · 6, H3 · 3/hour at peak · 257 m
    • Sutton Cross · 31n, 6 · 1/hour at peak · 359 m
    • Sutton Cross · H3 · 2/hour at peak · 425 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St. Fintan's High School · 239 m-0.3% pupils (714) · temporary classrooms 2025, approved · temporary classrooms 2025, approved
    • Burrow NS · 963 m-4.4% pupils (195)
    • Santa Sabina Dominican College · 984 m+0.7% pupils (754)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.21 ha · 96 m
    • Dublin City Council · 0.58 ha · 261 m
    • Electricity Supply Board · 0.11 ha · 313 m
    • Fingal County Council · 0.18 ha · 316 m
    • Fingal County Council · 0.39 ha · 486 m
    Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
    SourceLicenceFetchedLink
    gtfsCC-BY-4.011 Oct 2026, 23:43open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.012 Oct 2026, 01:44open
    consultpublic12 Oct 2026, 01:26open
    moderngovpublic12 Oct 2026, 01:27open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Extension (F11B/0213) approved 2012: built as approved?
      Ask for: The grant and an opinion of compliance.
      Seller · solicitor
    2. Application 273 m away open for comments until 11 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Burrow
    Electoral division
    Sutton
    Electoral area
    Howth-Malahide
    Council
    Fingal County Council
    Everything we found, as a list 8 lines
    • 2 applications on this site; latest F11B/0213, approved 2012, built? unknown.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 1 application open for comments nearby; nearest closes 11 Nov 2026.
    • Sutton (train DART) 237 m away: 7 an hour at morning peak; 26 from all stops within 500 m.
    • Inside Dublin Airport Noise Zone D.
    • Here (2022 census): 78% owner-occupied (council 67%); 7% of homes empty (council 5%); most built 2011–2015; 42% drive to work (council 52%); population up 2% since 2016.
    • 2 home extensions within 250 m since 2026. Most were porches.
    What the terms mean 10 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Conservation area (Architectural Conservation Area (ACA)): A street or area whose character is protected.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 37
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.011 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC-BY-4.0 (Fingal); public/attribution…27 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC-BY-NC-ND-4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC-BY-4.0 (Fingal); public/attribution…27 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public12 Oct 2026
    www2.courts.ie—all-rights-reserved12 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC-BY-4.05 Oct 2026
    esbnetworks.ie—all-rights-reserved (esbnetworks.ie di… · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public12 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.012 Oct 2026
    organisationsPlanning Register (derived from applications and the CRO register)n/a — derived; organisations only; DLR…11 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…12 Oct 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC-BY-4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 12 Oct 2026, 03:13 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.