Planning report · Fingal County Council · 500 m around the house · the last 12 months · 23 Oct 2026, 16:08

Bayside Boulevard North

53.38994, -6.14283

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (95%). 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Bayside Boulevard NorthBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2022: 3 files on Bayside Boulevard North2026: 1 file on Bayside Boulevard North4 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: I. B. C. Limited (528 m); Newport Synthesis Ltd. (836 m); Reheis Inc (850 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1post box
Radon grid squares1
Monuments3Enclosure; R149690
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 90–100% by type. A new house in a garden is harder: 55% approved, and 1 in 3 is asked for more information.

Single-storey rear58 decided · more info asked 7%
100% · council 94%
Two-storey rear10 decided · more info asked 20%
90% · council 86%
Single-storey side13 decided · more info asked 0%
92% · council 95%
Attic or dormer83 decided · more info asked 10%
92% · council 90%
First-floor19 decided · more info asked 11%
95% · council 86%
Garage conversion13 decided · more info asked 8%
92% · council 91%
Porch or front17 decided · more info asked 12%
100% · council 94%
New house in a garden or site20 decided · more info asked 35%
55% · council 60%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 233 nearby, 4,954 council-wide

Figure 3

Bayside Boulevard North, file by file since 2022

3 of 3 decided extensions on the road were approved.

4 planning files on Bayside Boulevard North since 2022, by kind and decision.20222023202420252026Extensions, atticsNo. 98 · 2022 · rear · approved · F22A/0691No. 18 · 2022 · first-floor · approved · F22B/0022No. 86 · 2022 · single-storey rear · approved · F22B/0216No. 113 · 2026 · two-storey side · undecided · F26A/0593EPorches, roofs, otherNew house in a side garden
ApprovedRefusedWithdrawn or invalid

4 files with "Bayside Boulevard North" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

2 approved3 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic31—
Two-storey side21—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 9 is asked for more information, which adds about 56 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 9): 103 days; Appeal window: 4 weeks; If appealed: +146 days; Building starts: 148 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 48–55 (n=227)53 daysIf more info asked (1 in 9)With further information: median 103 days (n=20)103 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 146 days (n=46, all appeals within 1.5 km)+146 daysBuilding startsStart notice: median 148 days after permission (n=108)148 days after permissionSigned off193 days after the start, for the few who file. 46% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated254 decided home extensions, 110 start notices, 46 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    12 of 23 appealed refusals became permissions. 0 of 24 appealed approvals were reversed.

    Refusals appealed23 decided
    12 became permissions
    Approvals appealed24 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months

    None of 1 changed the council's decision

    • 500413 Granted · Unit 133 Grange Drive, Baldoyle Industrial Estate, Baldoyle, Dublin 13 · 474 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher22 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 4

    What's changing around you?

    Street map around Bayside Boulevard North with 15 numbered planning items
    ⌖ the houseOpen for commentsNo decision yetApprovedRefused
    1. 1300 Sutton Park, Sutton F26A/0868ENo decision yet · 474 m
    2. 24 Rosbeg Court, Sutton F26A/0897ENo decision yet · 479 m
    3. 3113 Bayside Boulevard North, Sutton F26A/0593ENo decision yet · 73 m
    4. 464 Verbena Avenue, Sutton F26A/0731ENo decision yet · 194 m
    5. 529 Verbena Avenue, Sutton F26A/0515EApproved · 208 m
    6. 6900 Sarto Lawn, Bayside F25A/1001EApproved · 211 m
    7. 7Scoil Náisiúnta Muire agus Iósef, Sóisear (Bayside Junior School) F25A/1195EApproved · 254 m
    8. 823 Bayside Park, Sutton F26A/0438ERefused · 274 m
    9. 92 Seacliff Road, Dublin 13 F26A/0300EApproved · 293 m
    10. 1015 Bayside Square West, Sutton F26A/0689ENo decision yet · 303 m
    11. 1115 Roncalli Road, Bayside F26A/0139EApproved · 376 m
    12. 121 Roncalli Road, Dublin 13 F26A/0237Approved · 385 m
    13. 1320 Verbena Lawn, Bayside F26A/0424EApproved · 387 m
    14. 143 Sarto Road, Sutton F26A/0322EApproved · 388 m
    15. 1524 Kilbarrack Road, Raheny F26A/0784ENo decision yet · 439 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 97 permissions since 2016, 42 show a start notice and 2 have a completion certificate.

    133 applications lodged within 500 m. Council: 95 approved, 12 refused. After appeals: 97 approved. Of those: 2 signed off, 21 built with the owner's opt-out, 19 started, 55 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT95: lodged → approved12: lodged → refused16: lodged → withdrawn or invalid10: lodged → undecided95: approved → approved10: refused → refused16: withdrawn or invalid → withdrawn10: undecided → undecided2 refused by the council, approved after an appeal55: approved → no start notice found21: approved → built, owner opted out19: approved → started, not signed off2: approved → signed off133 lodged133 lodged95 approved95 approved12 refused12 refused16 withdrawn or invalid16 withdrawn or invalid10 undecided10 undecided97 approved97 approved10 refused10 refused16 withdrawn16 withdrawn10 undecided10 undecided55 no start notice found55 no start notice found21 built, owner opted out21 built, owner opted out19 started, not signed off19 started, not signed off2 signed off2 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured133 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 28 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-28 F26A/0868E: application received — Retention Permission for the widening of the site boundary entrance (existing vehicular entrance) along with associated ; 2026-11-09 F26A/0897E: application received — The development consist of the demolition of an existing rear conservatory and the construction of a two-storey extensiotoday28 Oct2 Nov7 Nov12 Nov17 Nov22 NovF26A/0868E: application received — Retention Permission for the widening of the site boundary entrance (existing vehicular entrance) along with associated · 474 m away · 2026-10-28F26A/0897E: application received — The development consist of the demolition of an existing rear conservatory and the construction of a two-storey extensio · 479 m away · 2026-11-09
    Comments close
    • Comments close 28 Oct 20265 days left
      1F26A/0868E · application received — Retention Permission for the widening of the site boundary entrance (existing vehicular…
      €20 to the council · 474 m away
    • Comments close 9 Nov 202617 days left
      2F26A/0897E · application received — The development consist of the demolition of an existing rear conservatory and the construction…
      €20 to the council · 479 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 20 and 28 a year; busiest 2022. 89% of decisions were approvals.

    2021: 18, 2022: 28, 2023: 21, 2024: 20, 2025: 26, 2026: 2001020302021: 18 approved18’21*2022: 19 approved2022: 7 refused2022: 1 withdrawn or invalid2022: 1 undecided28’222023: 19 approved2023: 2 withdrawn or invalid21’232024: 17 approved2024: 1 refused2024: 2 withdrawn or invalid20’242025: 15 approved2025: 3 refused2025: 8 withdrawn or invalid26’252026: 7 approved2026: 1 refused2026: 3 withdrawn or invalid2026: 9 undecided20’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 25 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    Building work nearby 7 in the last 12 months
    7 no sign-off needed
    • 2 Seacliff Road, Dublin 13, Dublin, D13 AX09 · 31 Aug 2026 · short notice no sign-off needed · F26A/0300E · 315 m
    • 1 Roncalli Road, Dublin, D13 TF60 · 4 Aug 2026 · start notice, opted out no sign-off needed · F26A/0237 · 401 m
    • 15 Roncalli Road, Dublin, D13 KP84 · 15 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · PF/1069/26 · 389 m
    • 900 Sarto Lawn, Dublin, Fingal, D13 W3Y1 · 28 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · F25A/1001E · 221 m
    • 13 Bayside Square West, Dublin, Fingal, D13 YK50 · 2 Jan 2026 · short notice no sign-off needed · F25A/0850E · 298 m
    • 47 Bayside Walk, SUTTON, Fingal, D13 X389 · 27 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · F25A/0562 · 215 m
    • 14 Verbena Lawn, Sutton, Fingal, D13 N671 · 23 Oct 2025 · short notice no sign-off needed · F25A/0415 · 329 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 23 Oct 2026, 02:22
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Island View Court20— (2026-Q2)563 m
    796-798 Howth Road3030 not started (2026-Q2)645 m
    794-798 Howth Road58—645 m
    Grange Road——904 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Naíonra Cois Bá · Crèche18 Nov 2024 · report · Tusla Early Years Inspectorate164 m
    Charlies Childcare LTD · Crèche25 May 2026 · report · Tusla Early Years Inspectorate218 m
    Jolly Junior's Montessori & After School Club · Crèche8 Sept 2025 · report · Tusla Early Years Inspectorate442 m
    Anchor Childcare Centre CLG · Crèche5 Mar 2026 · report · Tusla Early Years Inspectorate819 m
    Merryvale Montessori and Afterschool · Crèche20 May 2025 · report · Tusla Early Years Inspectorate837 m
    Kilbarrack Foxfield Preschool · Crèche9 Sept 2024 · report · Tusla Early Years Inspectorate837 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Fingal County Council.
    Homes approved
    Here50
    Council middle0
    Homes started
    Here30
    Council middle3
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    38% of homes built before 1971 (council 11%). 63% owner-occupied (council 67%).

    Homes built before 1971
    38% · council 11%
    Homes built since 2001
    1% · council 43%
    Owner-occupied
    63% · council 67%
    Rented
    28% · council 28%
    Children under 15
    20% · council 22%
    Aged 65 and over
    19% · council 11%
    Households with 2+ cars
    24% · council 42%
    Work mainly from home
    14% · council 12%
    This small area (185 people)Fingal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267130009

    Train
    419 m
    Bayside · DART · busiest stop within 500 m: 7 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    289 m
    S N Muire Agus Iosef, 396 pupils
    Homes sold nearby
    40
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • S N Muire Agus Iosef · primary · 396 pupils · 289 m
    • Mhuire Iosef Junior · primary · 302 pupils · 313 m
    • Pobalscoil Neasáin · postprimary · 831 pupils · 812 m
    • North Bay Educate Together NS · primary · 196 pupils · 827 m
    • Gaelscoil Mide · primary · 218 pupils · 833 m
    • St Laurence's National School · primary · 413 pupils · 979 m
    • Scoil Eoin · primary · 143 pupils · 981 m
    • Stapolin Educate Together National School · primary · 340 pupils · 983 m

    Stops 22

    • Bayside · DART · 7/hour at peak · 419 m
    • Bayside Coast · 31n, 32X, 6, H2, H3 · 5/hour at peak · 537 m
    • Kilbarrack Road · 31n, 6, H2, H3 · 5/hour at peak · 544 m
    • Bayside Coast · 32X, 6, H2, H3 · 6/hour at peak · 560 m
    • Naomh Barróg GAA · N6 · 653 m
    • Kilbarrack Road · 6, H2, H3 · 5/hour at peak · 654 m
    • Kilbarrack Cemetery · 6, H2, H3 · 5/hour at peak · 668 m
    • Naomh Barróg GAA · N6 · 5/hour at peak · 670 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N Muire Agus Iosef · 289 m-1.7% pupils (396)
    • Mhuire Iosef Junior · 313 m-10.9% pupils (302)
    • Pobalscoil Neasáin · 812 m+3.2% pupils (831)
    • North Bay Educate Together NS · 827 m-1.5% pupils (196)
    • Gaelscoil Mide · 833 m-1.4% pupils (218)
    • St Laurence's National School · 979 m-2.8% pupils (413)

    Open consultations

    Council meetings 30 items

    Public land

    • Fingal County Council · 0.13 ha · 216 m
    • Dublin City Council · 0.16 ha · 333 m
    • Dublin City Council · 2.13 ha · 359 m
    • Dublin City Council · 0.52 ha · 404 m
    • Fingal County Council · 1.18 ha · 412 m
    • Dublin City Council · 1.76 ha · 412 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 23 Oct 2026, 02:42
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Council consultation portalsPublic23 Oct 2026, 01:47open
    Council meetings (ModernGov)Public23 Oct 2026, 02:42open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 474 m away open for comments until 28 Oct 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Kilbarrack Lower
    Electoral division
    Sutton
    Electoral area
    Howth-Malahide
    Council
    Fingal County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 2 applications open for comments nearby; nearest closes 28 Oct 2026.
    • Bayside (train DART) 419 m away: 7 an hour at morning peak.
    • Inside Dublin Airport Noise Zone D.
    • Here (2022 census): 63% owner-occupied (council 67%); 5% of homes empty (council 5%); most built 1971–1980; 45% drive to work (council 52%); population up 2% since 2016.
    • 5 home extensions within 250 m since 2025. Most were dormers or attic conversions.
    • Around here the council decides in a median 54 days (about 8 weeks); 1 in 8 is asked for more information.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.023 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public23 Oct 2026
    www2.courts.ie—© the publisher22 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public23 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.023 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence23 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 23 Oct 2026, 16:08 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.