Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 09:14

Willow Park Grove

53.39110, -6.26996

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (98%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Willow Park GroveBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2022: 2 files on Willow Park Grove2023: 1 file on Willow Park Grove2025: 3 files on Willow Park Grove2026: 4 files on Willow Park Grove10 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G5
Zoning · Open space and amenity
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z9 - DEV PLAN 2022-2028

ZoningG5 · Open space and amenity
What it says

Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningG5 · Open space and amenity
What it says

Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares1
Monuments3House - 16th/17th century; R149712
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 97–100% by type. A new house in a garden is harder: 62% approved, and 1 in 2 is asked for more information.

Single-storey rear72 decided · more info asked 18%
97% · council 97%
Two-storey rear32 decided · more info asked 19%
97% · council 96%
Two-storey side10 decided · more info asked 20%
100% · council 98%
Attic or dormer158 decided · more info asked 8%
98% · council 96%
First-floor19 decided · more info asked 21%
100% · council 94%
Garage conversion24 decided · more info asked 21%
100% · council 99%
Porch or front12 decided · more info asked 17%
100% · council 97%
New house in a garden or site16 decided · more info asked 44%
62% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 343 nearby, 5,624 council-wide

Figure 3

Willow Park Grove, file by file since 2022

6 of 6 decided extensions on the road were approved.

10 planning files on Willow Park Grove since 2022, by kind and decision.20222023202420252026Extensions, atticsNo. 108 · 2022 · attic conversion / dormer · approved · 3939/22No. 8 · 2023 · attic conversion / dormer · approved · WEB1100/23No. 132 · 2025 · garage conversion · withdrawn or invalid · 3402/25No. 132 · 2025 · garage conversion · approved · 3409/25No. 116 · 2025 · first-floor · approved · WEB2749/25No. 72 · 2026 · garage conversion · withdrawn or invalid · WEB1453/26No. 72 · 2026 · garage conversion · approved · WEB1499/26No. 45 · 2026 · attic conversion / dormer · approved · WEB1960/26No. 78 · 2026 · attic conversion / dormer · undecided · WEB2573/26Porches, roofs, otherNo. 4 · 2022 · attic conversion / dormer · approved · 3702/22New house in a side garden
ApprovedRefusedWithdrawn or invalid

10 files with "Willow Park Grove" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

1 approved4 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey side31—
Dormer or attic20—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 66 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 126 days; Appeal window: 4 weeks; If appealed: +121 days; Building starts: 132 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=314)55 daysIf more info asked (1 in 7)With further information: median 126 days (n=51)126 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 121 days (n=31, all appeals within 1.5 km)+121 daysBuilding startsStart notice: median 132 days after permission (n=178)132 days after permissionSigned off54% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated366 decided home extensions, 179 start notices, 31 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    4 of 10 appealed refusals became permissions. 0 of 22 appealed approvals were reversed.

    Refusals appealed10 decided
    4 became permissions
    Approvals appealed22 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months

    None of 1 changed the council's decision

    • 500862 Granted with conditions · Site rear of 62 and 62A Glasnevin Avenue, Dublin 11 · 86 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Willow Park Grove with 15 numbered planning items
    ⌖ the houseAppealBuilding startedEmpty land zoned for homesApprovedNo decision yet
    1. 1Site rear of 62 and 62A Glasnevin Avenue, Dublin 11 500862Appeal: approved with conditions · 86 m
    2. 22 Willow Park Drive, Dublin 11 WEB1797/26Building started · 72 m
    3. 368 Glasnevin Avenue, Dublin WEB5210/25Building started · 113 m
    4. 463 Glasnevin Avenue, Dublin 11 WEB1501/25Building started · 166 m
    5. 51.4 ha zoned for homesEmpty land zoned for homes · 439 m
    6. 62 Willow Park Drive, Glasnevin WEB1797/26Approved · 56 m
    7. 774 Glasnevin Avenue, Dublin 11 WEB3164/26No decision yet · 181 m
    8. 872 WIllow Park Grove, Glasnevin WEB1499/26Approved · 258 m
    9. 93 Glasnevin Park, Glasnevin 5131/26Approved · 273 m
    10. 1078, Willow Park Grove WEB2573/26No decision yet · 285 m
    11. 11La Paloma, 13 Glasnevin Park WEB1235/26Approved · 294 m
    12. 1245, Willow Park Grove WEB1960/26Approved · 309 m
    13. 1325, Pinewood Drive 5115/26Approved · 310 m
    14. 1444, Clonmel Road WEB3359/26No decision yet · 323 m
    15. 1524, Pinewood Avenue WEB2784/26No decision yet · 369 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 80 permissions since 2016, 41 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    99 applications lodged within 500 m. Council: 80 approved, 3 refused. After appeals: 80 approved. Of those: 0 signed off, 28 built with the owner's opt-out, 13 started, 39 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT80: lodged → approved3: lodged → refused11: lodged → withdrawn or invalid5: lodged → undecided80: approved → approved3: refused → refused11: withdrawn or invalid → withdrawn5: undecided → undecided39: approved → no start notice found28: approved → built, owner opted out13: approved → started, not signed off99 lodged99 lodged80 approved80 approved3 refused3 refused11 withdrawn or invalid11 withdrawn or invalid5 undecided5 undecided80 approved80 approved3 refused3 refused11 withdrawn11 withdrawn5 undecided5 undecided39 no start notice found39 no start notice found28 built, owner opted out28 built, owner opted out13 started, not signed off13 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured99 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      MetroLink is planned 769 m away.

      MetroLink, MetroLink: indicative route (Fingal Development Plan 2023-2029 objective)20242025202620272028MetroLink, MetroLink769 m · plannedindicative route (Fingal Development Plan 2023-2029 objective)today

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 1 within 500 m

      Empty land zoned for homes 1

      • 51.4 ha zoned for homes · no homes built on it yet · 439 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 9

      Applications within 500 m, by year

      Between 13 and 18 a year; busiest 2025. 96% of decisions were approvals.

      2021: 20, 2022: 13, 2023: 15, 2024: 13, 2025: 18, 2026: 20051015202021: 19 approved2021: 1 withdrawn or invalid20’21*2022: 11 approved2022: 1 refused2022: 1 withdrawn or invalid13’222023: 15 approved15’232024: 11 approved2024: 2 refused13’242025: 15 approved2025: 3 withdrawn or invalid18’252026: 9 approved2026: 6 withdrawn or invalid2026: 5 undecided20’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 21 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 15 in the last 12 months
      1 not signed off14 no sign-off needed
      • 20 Glasnevin Park, Dublin 11, D11 Y2H9 · 12 Oct 2026 · short notice no sign-off needed · WEB5193/25 · 280 m
      • 25 Pinewood Drive, Dublin 11, D11 FX39 · 28 Sept 2026 · start notice, opted out no sign-off needed · 5115/26 · 322 m
      • 28 Willow Park Avenue, Dublin 11, D11 CK27 · 14 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · WEB2318/26 · 448 m
      • 22 Willow Park Drive, Dublin 11, D11 N202 · 8 Sept 2026 · start notice, opted out no sign-off needed · WEB1797/26 · 72 m
      • 13 Glasnevin Park, Dublin, Dublin 11, D11 K2N3 · 30 Jun 2026 · short notice no sign-off needed · WEB1235/26 · 306 m
      • 368 Glasnevin Avenue, Dublin, Dublin 11, D11 N60W · 13 May 2026 · short notice no sign-off needed · WEB5210/25 · 113 m
      • 463 Glasnevin Avenue, Dublin 11, D11 H5F3 · 11 May 2026 · start notice, opted out no sign-off needed · WEB1501/25 · 166 m
      • 38 Shanard Avenue, Dublin 9,, Dublin 9, D09 E954 · 4 May 2026 · start notice, opted out no sign-off needed · 3318/25 · 488 m
      • 7 Pinewood Avenue, Glasnevin, Dublin 11, D11 FH98 · 20 Apr 2026 · start notice, opted out no sign-off needed · WEB1588/24 · 469 m
      • Gateway Avenue, Ballymun, Dublin, Dublin 11, D11E306 · 21 Mar 2026 · start notice not signed off · WEB1965/23 · 409 m
      • 56 Glasnevin Avenue, DUBLIN 11, D11 NHY2 · 13 Mar 2026 · start notice, opted out no sign-off needed · WEB1346/25 · 128 m
      • 142 Willow Park Avenue, Glasnevin, Dublin 11, Dublin 11, D11 YE13 · 3 Mar 2026 · start notice, opted out no sign-off needed · WEB1953/25 · 152 m
      • 49 Glasnevin Park, Glasnevin, Dublin 3, D11 X0Y6 · 23 Feb 2026 · short notice no sign-off needed · WEB2535/25 · 451 m
      • 15A Delville Road, Dublin, Dublin 11, D11 XF72 · 5 Feb 2026 · start notice, opted out no sign-off needed · WEB1069/25 · 388 m
      • 66 Glasnevin Avenue, Dublin, Dublin 11, D11 T9K2 · 26 Jan 2026 · start notice, opted out no sign-off needed · 3294/25 · 112 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Sillogue Road and Avenue323323 not started (2026-Q2)158 m
      Sillogue Lands Site 12102102 not started (2026-Q2)416 m
      Shangan Road Development9393 not started (2026-Q2)613 m
      Coultry LRD446446 not started (2026-Q2)759 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Mother of Divine Grace Community Playgroup · Crèche16 Sept 2024 · report · Tusla Early Years Inspectorate180 m
      Our Ladys Nursery Ballymun Ltd · Crèche25 Feb 2026 · report · Tusla Early Years Inspectorate300 m
      Sandra's Playschool · Crèche11 Dec 2024 · report · Tusla Early Years Inspectorate323 m
      Naìonra Scoil an tSeachtar Laoch · Crèche6 Mar 2025 · report · Tusla Early Years Inspectorate406 m
      Pinewood Montessori School · Crèche13 Nov 2025 · report · Tusla Early Years Inspectorate496 m
      Ballygall Community Playgroup · Crèche20 Apr 2026 · report · Tusla Early Years Inspectorate698 m
      Pop Up Pre School · Crèche16 Oct 2025 · report · Tusla Early Years Inspectorate838 m
      Ballymun East Community Centre · Crèche16 Jun 2025 · report · Tusla Early Years Inspectorate882 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Quieter than most of Dublin City Council.
      Homes approved
      Here13
      Council middle62
      Homes started
      Here6
      Council middle132
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      92% of homes built before 1971 (council 52%). 92% owner-occupied (council 47%).

      Homes built before 1971
      92% · council 52%
      Homes built since 2001
      6% · council 19%
      Owner-occupied
      92% · council 47%
      Rented
      7% · council 45%
      Children under 15
      17% · council 15%
      Aged 65 and over
      19% · council 13%
      Households with 2+ cars
      44% · council 19%
      Work mainly from home
      21% · council 12%
      This small area (296 people)Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268019003

      Bus
      144 m
      Willow Park Avenue · 19, 88n, N4 · busiest stop within 500 m: 18 an hour at peak
      Planned
      769 m
      MetroLink, MetroLink
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      254 m
      Bantiarna na mBuanna Boys, 174 pupils
      Homes sold nearby
      42
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Bantiarna na mBuanna Boys · primary · 174 pupils · 254 m
      • Our Lady Of Victories Infant NS · primary · 192 pupils · 329 m
      • Bantiarna na mBuanna Girls · primary · 176 pupils · 348 m
      • Scoil An Tseachtar Laoch · primary · 165 pupils · 385 m
      • Trinity Comprehensive School · postprimary · 564 pupils · 505 m
      • SN an Spioraid Naiomh C · primary · 249 pupils · 511 m
      • Holy Spirit B NS · primary · 229 pupils · 538 m
      • Virgin Mary Girls National School · primary · 160 pupils · 790 m

      Stops 57

      • Willow Park Avenue · 19, 88n, N4 · 7/hour at peak · 144 m
      • Glasnevin Drive · N4 · 5/hour at peak · 166 m
      • Glasnevin Drive · 19 · 3/hour at peak · 291 m
      • Glasnevin Park · 88n, N4 · 5/hour at peak · 291 m
      • Glasnevin Park · N4 · 5/hour at peak · 302 m
      • Glasnevin Avenue · 19, N4 · 7/hour at peak · 350 m
      • Ballymun Library · 19, 220, 220A, 220T, 42D, 88n · 16/hour at peak · 379 m
      • Gateway Avenue · 19, 220, 220A, 220T, 42D, E1 · 16/hour at peak · 409 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Bantiarna na mBuanna Boys · 254 m+2.4% pupils (174)
      • Our Lady Of Victories Infant NS · 329 m-8.6% pupils (192)
      • Bantiarna na mBuanna Girls · 348 m-4.9% pupils (176)
      • Scoil An Tseachtar Laoch · 385 m0% pupils (165) · an extension 2023, approved
      • Trinity Comprehensive School · 505 m-1.7% pupils (564)
      • SN an Spioraid Naiomh C · 510 m-2% pupils (249)

      Open consultations

      Council meetings 30 items

      Public land

      • Dublin City Council · 0.56 ha · 0 m
      • The Minister for Education and Skills · 4.01 ha · 142 m
      • Dublin City Council · 0.53 ha · 244 m
      • Dublin City Council · 0.11 ha · 297 m
      • Dublin City Council · 0.96 ha · 345 m
      • Dublin City Council · 0.13 ha · 391 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Zoned G5 (open space and amenity), not for homes: could you extend?
        Ask for: A solicitor's or planner's view.
        Solicitor · planner
      2. Building work started 72 m away: for how long?
        Ask for: The planning conditions for WEB1797/26.
        Agent · council
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Ballymun E
      Electoral area
      Ballymun-Finglas
      Council
      Dublin City Council
      Everything we found, as a list 8 lines
      • Zoned G5 (open space and amenity); not protected; no vacant land tax.
      • 1 site nearby could change: 1 empty zoned plot.
      • Trinity Comp School (bus 19, 220) 436 m away: 20 an hour at morning peak; 139 from all stops within 500 m. Planned: MetroLink 769 m away, indicative route (Fingal Development Plan 2023-2029 objective).
      • Here (2022 census): 92% owner-occupied (council 47%); 4% of homes empty (council 8%); most built 1946–1960; 53% drive to work (council 28%); population up 7% since 2016.
      • 5 home extensions within 250 m since 2026. Most were single-storey side extensions.
      • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      • 21 applications nearby in the last 12 months; 100% approved (council 90%); 10% for work already built (council 14%).
      • Scoil An Tseachtar Laoch, 385 m away: an extension approved (2023).
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 09:14 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.