M1 — Metro / rail economic corridordevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z10: Inner Suburban and inner City Sustainable Mixed-Uses: To consolidate and facilitate the development of inner city and inner suburban sites for mixed-uses.
What that means: A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.
The development will consist of
(a) The construction of a single storey ESB substation, adjoined electrical switch room and associated site works
(b) Fenced bin storage area
The development will consist of (a) The construction of a single storey ESB substation, adjoined electrical switch room and associated site works (b)Fenced bin storage area.
WEB2800/26received 21 Jul 2026decided 23 Jul 20260 m away
The development will consist of (a) Second level extension above ground floor garage/kitchen with flat roof, (b) Enhance the exterior insulation; wrapping the house, with a smooth render finish and keeping the brick/stone under the left window (c) Extend the vehicular access to 3.5m (d) Extension to the rear under the 40sqm with internal alterations to ground floor, and all associated site and landscaping works.
WEB2213/26received 19 May 2026decided 9 Jul 2026458 m away
Demolition of existing rear ground floor flat roofed kitchen extension. Construction of a single-storey, rear, ground-floor, extension, and front porch to dwelling . at 20, Newtown Cottages, Malahide Road, Dublin 17 (D17 PY27).
WEB1690/26received 25 Mar 2026decided 19 May 2026303 m away
RETENTION : The development seeking retention permission consists of the provision of storage containers and attendant facilities including parking, a vehicular entrance and a railing along the side (northwest) and front (southwest) boundaries.
WEB1327/26received 16 Feb 2026decided 8 Apr 2026457 m away
Demolition of existing rear ground floor flat roofed kitchen extension. Construction of a single-storey side and rear ground floor extension to dwelling.
WEB6083/25received 22 Dec 2025decided 24 Feb 2026313 m away
The development will consist of the partial removal of the side front garden wall and creating 3m vehicular access to the site in order to facilitate safe and efficient off street parking.
WEB5522/25received 28 Oct 2025decided 17 Dec 2025455 m away
The development will consist of the partial removal of the front wall and moving the pillar by 0.450m to widen the vehicular access to the site in order to facilitate safe and efficient off street parking for patients and staff at the dental practice.
WEB5500/25received 24 Oct 2025decided 28 Oct 2025455 m away
Planning Permission for development at this site, 63 St Brendan's Avenue. Artane, Dublin 5 - DO5N2T7. The development will consist of the construction of a single storey full width ground floor extension to the front of the existing dwelling house - comprising an enlarged living room, an extended hallway and a toilet area.
3130/25received 1 Apr 2025decided 19 May 2025478 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
No publishable utility-capacity record within the radius. 21 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 14 Sept 2026, 18:07 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.