R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (6.82 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
The proposed development will consist of: the construction of a new electrical substation and switchroom building, and all associated site works to the rear of the site. The building layout will comprise of four compartments: an ESB feeder A sub-station, switch room A, remote switch control room and switch room B.
WEB2814/26received 23 Jul 2026decided 23 Jul 2026364 m away
The proposed development will consist of: the construction of a new electrical substation and switchroom building, and all associated site works to the rear of the site. The building layout will comprise of four compartments: an ESB feeder A sub-station, switch room A, remote switch control room and switch room B.
A high level single storey extension to north, east and west elevations of existing logistical distribution & storage building (previous planning application WEB2638/24), internal alterations, amendments to external elevations including 3No new level docking bays, relocation of fire exit and all associated site and ground works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Oscar Traynor Coaching & Development Centre CLG wish to apply for planning permission for re-location of existing modular spectator stand from current location at Dalymount Park, Phibsborough, Dublin 7, to new location adjacent to existing all-weather 11-a-side football pitch at the Oscar Traynor Coaching & Development Centre, Oscar Traynor Road, Dublin 17, D17 AP86, along with all associated landscaping and site works.
WEB2182/26received 15 May 2026decided 18 May 2026460 m away
Changing the main roof from a hipped roof to a gable-ended roof, with a new end gable wall and extended ridge and a new dormer rooflight along the rear of the new roof and a new velux rooflight on the front pitch of the roof, all to an existing two storey semi-detached dwelling.
WEB1450/26received 27 Feb 2026decided 21 Apr 2026127 m away
The development will consist of the amending the existing roof to a gable roof with gable window at attic level and the construction of one dormer window in the main roof to the rear.
WEB1259/26received 9 Feb 2026decided 31 Mar 202660 m away
PROTECTED STRUCTURE: Noteside Limited seeks permission for a residential development, on a site located within the Larch Hill estate, Coolock, Dublin 17. The application site is bounded to the north by “The Crescent” and to the south by “The View”, and contains a Protected Structure i.e., Larch Hill House (RPS Ref. No. 2042). The proposed development consists of the demolition of an existing dwelling located to the north of the Protected Structure (c.93sq.m) and the construction of 39 no. dwellings. The proposed dwellings are accommodated in 2 no. new buildings as follows: (a) a 4 storey apartment building to the rear/north of Larch Hill House, comprised of 18 no. 1 bed apartments & 12 no. 2 bed apartments, and (b) a 1-3 storey duplex building to the west of Larch Hill House, accommodating 9 no. dwellings, comprised of 6 no. 1 bed apartments at ground floor level & 3 no. 3 bed duplex units at first & second floor level. The proposed development also includes a single storey bin & bike store / services building located to the east of Larch Hill House. Access to the proposed development will be from Coolock Lane (the R104) via the Larch Hill estate and the existing vehicular entrance to Larch Hill House. The proposed development includes external repair works to Larch Hill House, including replacing non-original windows, stripping & re-slating of roof, reflaunching chimneys, repair & replacement of rainwater goods, removal of non-original existing front entrance porch, reinstate fanlight & timberwork to door set & doorcase, repointing of granite steps, removal of existing boundary treatment to the front (south) of the property & replacement with new boundary treatment.
The proposed development also includes surface car parking, bin & bicycle storage, public & communal open spaces, hard & soft landscaping, boundary treatments, public lighting, and all associated site development works etc., on an overall site area of c.0.65 hectares. Private open space is provided in the form of terraces at the ground floor level and balconies/terraces at the upper floor levels.
A Natura Impact Statement (NIS) has been prepared with respect to proposed development and accompanies the planning application.
WEB5466/25received 22 Oct 2025decided 9 Feb 202639 units250 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 20 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Dublin City Council — Dublin city and suburbs
5.99 hafolio DN67911F126 m awayas of 1 Apr 2023
The Industrial Development Authority — Dublin city and suburbs
5.02 hafolio DN8198F184 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
3.62 hafolio DN93578F211 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.98 hafolio DN54499F223 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.2 hafolio DN192281F253 m awayas of 1 Apr 2023
The Industrial Development Authority — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 22:53 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.