The Drive, Hunter's Run

53.40251, -6.42120

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (93%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of The DriveBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2021: 2 files on The Drive2022: 1 file on The Drive2023: 1 file on The Drive2024: 1 file on The Drive2026: 3 files on The Drive8 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Clarochem Ireland Limited (880 m); Astellas Ireland Company Limited (944 m); Rottapharm Limited (944 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares3
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 96–97% by type. A new house in a garden is harder: 64% approved, and 1 in 3 is asked for more information.

Single-storey rear30 decided · more info asked 10%
97% · council 92%
Attic or dormer135 decided · more info asked 5%
96% · council 92%
New house in a garden or site11 decided · more info asked 36%
64% · council 53%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 176 nearby, 2,164 council-wide

Figure 3

The Drive, file by file since 2021

4 of 4 decided extensions on the road were approved.

8 planning files on The Drive since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 29 · 2021 · two-storey side · approved · FW21B/0015No. 17 · 2024 · attic conversion / dormer · approved · FW24A/0228No. 20 · 2026 · attic conversion / dormer · withdrawn or invalid · FW26A/0071ENo. 37 · 2026 · attic conversion / dormer · approved · FW26A/0250ENo. 20 · 2026 · attic conversion / dormer · approved · FW26A/0256EPorches, roofs, otherNo. 11 · 2021 · other work · approved · FW21B/0029No. 1 · 2022 · other work · approved · FW21A/0164No. 55 · 2023 · other work · approved · FW23A/0130New house in a side garden
ApprovedRefusedWithdrawn or invalid

8 files with "The Drive" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

3 approved
KindAppliedApprovedRefused
Dormer or attic22—
Single-storey rear11—

On Hunter's Run: 14 extensions in 10 years, 89% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 49 days. 1 in 13 is asked for more information, which adds about 58 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 49 days; Appeal window: 4 weeks; If appealed: +112 days; Building starts: 112 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 45–52 (n=209)49 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 112 days (n=22, all appeals within 1.5 km)+112 daysBuilding startsStart notice: median 112 days after permission (n=81)112 days after permissionSigned off351 days after the start, for the few who file. 35% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated227 decided home extensions, 81 start notices, 22 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    5 of 14 appealed refusals became permissions. 1 of 10 appealed approvals were reversed.

    Refusals appealed14 decided
    5 became permissions
    Approvals appealed10 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months

    None of 2 changed the council's decision

    • 501128 Granted · 32 Rusheeney Way, Rusheeney Village, Dublin 15, D15 T6X8 · 323 m report
    • 500515 Granted with conditions · 61 Carne Court, Huntstown, D15 YXW1 · 397 m report
    • 323881 Pending · Littlepace Shopping Centre, Clonee, Co. Dublin · 429 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around The Drive, Hunter's Run with 12 numbered planning items
    ⌖ the houseApprovedNo decision yet
    1. 137 The Drive, Hunters Run FW26A/0250EApproved · 157 m
    2. 230 The Grove, Hunter's Run FW26A/0236EApproved · 162 m
    3. 316 The Park, Hunters Run Clonee FW26A/0245EApproved · 219 m
    4. 419 Deerhaven Park, Huntstown FW26A/0362ENo decision yet · 246 m
    5. 585 The Grove, Hunter's Run FW26A/0206EApproved · 259 m
    6. 640 Deerhaven Avenue, Dublin 15 FW26A/0226EApproved · 267 m
    7. 732 Rusheeney Way, Rusheeney Village FW26A/0018EApproved · 323 m
    8. 820 Deerhaven Avenue, Huntstown FW26A/0138EApproved · 332 m
    9. 920 The Drive Pheasant Run, Clonee FW26A/0256EApproved · 339 m
    10. 1029 Rusheeny Way, Clonsilla FW26A/0029EApproved · 350 m
    11. 11203 Huntstown Wood, Mulhuddart FW26A/0143EApproved · 460 m
    12. 1229 Swallow Brook View, Clonee FW26A/0257EApproved · 487 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 74 permissions since 2016, 25 show a start notice and 0 have a completion certificate.

    92 applications lodged within 500 m. Council: 75 approved, 5 refused. After appeals: 74 approved. Of those: 0 signed off, 9 built with the owner's opt-out, 16 started, 49 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT75: lodged → approved5: lodged → refused11: lodged → withdrawn or invalid1: lodged → undecided74: approved → approved5: refused → refused11: withdrawn or invalid → withdrawn1: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal49: approved → no start notice found9: approved → built, owner opted out16: approved → started, not signed off92 lodged92 lodged75 approved75 approved5 refused5 refused11 withdrawn or invalid11 withdrawn or invalid1 undecided1 undecided74 approved74 approved5 refused5 refused12 withdrawn12 withdrawn1 undecided1 undecided49 no start notice found49 no start notice found9 built, owner opted out9 built, owner opted out16 started, not signed off16 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured92 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Applications within 500 m, by year

      Between 9 and 19 a year; busiest 2024. 94% of decisions were approvals.

      2021: 11, 2022: 17, 2023: 18, 2024: 19, 2025: 9, 2026: 18051015202021: 10 approved2021: 1 refused11’21*2022: 16 approved2022: 1 withdrawn or invalid17’222023: 16 approved2023: 1 refused2023: 1 withdrawn or invalid18’232024: 15 approved2024: 1 refused2024: 3 withdrawn or invalid19’242025: 6 approved2025: 2 refused2025: 1 withdrawn or invalid9’252026: 12 approved2026: 5 withdrawn or invalid2026: 1 undecided18’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 18 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 4 in the last 12 months
      2 not signed off2 no sign-off needed
      • 19 Deerhaven Park, Dublin 15, Dublin, D15 WPV4 · 26 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · FW26A/0210E · 261 m
      • 16 The Park, Clonee, Dublin · 12 Oct 2026 · 1 homes · start notice not signed off · FS5W/037/26 · 417 m
      • 61 Carne Court, Dublin, D15 YXW1 · 20 Jul 2026 · start notice, opted out no sign-off needed · FW24A/0303E · 411 m
      • Liitlepace Rd, Dublin, Fingal, D15 TA49 · 2 Apr 2026 · start notice not signed off · FW23A/0309 · 318 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Hunter's Run · 22 applications in 10 years · 89% approved · most common: attic conversion / dormer

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Canterbury Gate——876 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Children's Kingdom · Crèche1 May 2024 · report · Tusla Early Years Inspectorate134 m
      Little Jack's Corner · Crèche23 Sept 2025 · report · Tusla Early Years Inspectorate384 m
      Missus Tatty's Nursery Ltd · Crèche26 Feb 2024 · report · Tusla Early Years Inspectorate425 m
      Little Schoolers · Crèche22 May 2024 · report · Tusla Early Years Inspectorate609 m
      Small World Pre School · Crèche25 May 2026 · report · Tusla Early Years Inspectorate731 m
      Juniors Playschool and Montessori · Crèche15 Aug 2024 · report · Tusla Early Years Inspectorate795 m
      Phoenix Childcare · Crèche9 Dec 2024 · report · Tusla Early Years Inspectorate812 m
      Links Childcare · Crèche9 Oct 2025 · report · Tusla Early Years Inspectorate843 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Fingal County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here31
      Council middle3
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      60% owner-occupied (council 67%).

      Homes built before 1971
      2% · council 11%
      Homes built since 2001
      7% · council 43%
      Owner-occupied
      60% · council 67%
      Rented
      32% · council 28%
      Children under 15
      24% · council 22%
      Aged 65 and over
      2% · council 11%
      Households with 2+ cars
      58% · council 42%
      Work mainly from home
      8% · council 12%
      This small area (336 people)Fingal

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267028049

      Aircraft noise
      45–49 dB
      day–night average (EPA 2022) · airport noise zone D
      Bus
      187 m
      The Grove · 270, 270T, 70 · busiest stop within 500 m: 7 an hour at peak
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      308 m
      Mary Mother of Hope Junior National School, 349 pupils
      Homes sold nearby
      54
      in 3 years, 2 new (Property Price Register)
      Schools, stops and the council

      Schools

      • Mary Mother of Hope Junior National School · primary · 349 pupils · 308 m
      • Mary Mother of Hope Senior NS · primary · 429 pupils · 321 m
      • Sacred Heart NS · primary · 632 pupils · 742 m
      • Hartstown Community School · postprimary · 1120 pupils · 787 m
      • St Ciarans NS · primary · 530 pupils · 973 m

      Stops 29

      • The Grove · 270, 270T, 70, 70n · 6/hour at peak · 187 m
      • The Grove · 270, 270T, 70, 70n · 7/hour at peak · 191 m
      • Deerhaven · 270, 270T, 70, 70n · 7/hour at peak · 240 m
      • Deerhaven · 270, 270T, 70, 70n · 7/hour at peak · 257 m
      • Littlepace Park · 270, 270T, 70, 70n · 6/hour at peak · 365 m
      • Littlepace Gallops · 270, 270T, 70, 70n · 7/hour at peak · 399 m
      • Huntstown Wood · 270, 270T, 70, 70n · 7/hour at peak · 468 m
      • Huntstown Green · 220, 220A, 39, 39A · 12/hour at peak · 563 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Mary Mother of Hope Junior National School · 308 m-7.7% pupils (349)
      • Mary Mother of Hope Senior NS · 321 m0% pupils (429)
      • Sacred Heart NS · 741 m-4.4% pupils (632)
      • Hartstown Community School · 787 m-0.4% pupils (1,120)
      • St Ciarans NS · 973 m-4.3% pupils (530)

      Council meetings 30 items

      Public land

      • Fingal County Council · 0.39 ha · 184 m
      • Fingal County Council · 0.1 ha · 228 m
      • Fingal County Council · 0.31 ha · 234 m
      • The Minister for Education and Skills · 1.26 ha · 237 m
      • Fingal County Council · 0.34 ha · 276 m
      • The Minister for Education and Skills · 0.52 ha · 311 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Huntstown
      Electoral division
      Blanchardstown-Blakestown
      Electoral area
      Ongar
      Council
      Fingal County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • Nothing nearby looks set to change.
      • The Grove (bus 270, 270T) 191 m away: 7 an hour at morning peak; 47 from all stops within 500 m.
      • Noise from aircraft mapped at 45–49 dB (day-evening-night average, EPA 2022); inside Dublin Airport Noise Zone D.
      • Here (2022 census): 60% owner-occupied (council 67%); 1% of homes empty (council 5%); most built 1991–2000; 54% drive to work (council 52%); population up 13% since 2016.
      • 3 home extensions within 250 m since 2026. Most were dormers or attic conversions. On Hunter's Run: 14 in 10 years, 89% approved.
      • Around here the council decides in a median 52 days (about 7 weeks); 1 in 7 is asked for more information.
      • 2 appeals nearby decided in the last 12 months; none changed the council's decision.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 30
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 05:27 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.