Planning report · Dublin City Council · 1000 m around the house · the last 12 months · 14 Oct 2026, 10:44

Clonshaugh Business & Technology Park, Dublin, Santry

53.40407, -6.22947

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (94%). 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
C2.1
Zoning · Economic development and employment
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z6 - DEV PLAN 2022-2028

DCC_DP_OWN · — – —

ZoningC2.1 · Economic development and employment
What it says

Z6: Employment/Enterprise: To provide for the creation and protection of enterprise and facilitate opportunities for employment creation.

Zoned for employment uses. Housing is not the intended use here.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningC2.1 · Economic development and employment
What it says

Z6: Employment/Enterprise: To provide for the creation and protection of enterprise and facilitate opportunities for employment creation.

Zoned for employment uses. Housing is not the intended use here.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Amazon Data Services Ireland Limited (56 m); licence P0532 (61 m); Forest Laboratories Ireland Limited (93 m)

Vacant land taxNo not on the map
Flood riskNearby OPW map area within 1.0 km · floodinfo.ie
Within 1.0 kmCountFor example
Licensed industrial sites7Global Switch Property (Dublin) Limited; Modus Media International Dublin
Natural heritage areas1Santry Demesne
Heritage inventory buildings3Woodlands House; post box
Radon grid squares1
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: zoning, constraints.epa_licence, constraints.radon, epa_leap, rzlt, constraints, constraints.flood_cfram, constraints.nha, constraints.niah · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
constraints.epa_licenceCC-BY-4.027 Sept 2026, 19:36open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
epa_leapCC-BY-4.012 Oct 2026, 23:31open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.flood_cframCC-BY-NC-ND-4.0 · not redistributable — shown as a flag only11 Sept 2026, 19:11open
constraints.nhaCC-BY-4.027 Sept 2026, 19:27open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 14 Oct 2026, 00:33
SourceLicenceFetchedLink
bcmsCC-BY-4.014 Oct 2026, 00:33open
npadCC-BY-4.014 Oct 2026, 02:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 82–100% by type. A new house in a garden is harder: 35% approved, and 1 in 6 is asked for more information.

Single-storey rear24 decided · more info asked 21%
100% · council 97%
Two-storey rear13 decided · more info asked 15%
85% · council 96%
Attic or dormer71 decided · more info asked 8%
96% · council 96%
First-floor11 decided · more info asked 9%
82% · council 93%
Garage conversion11 decided · more info asked 27%
100% · council 99%
New house in a garden or site17 decided · more info asked 18%
35% · council 72%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 147 nearby, 7,242 council-wide

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 no decision or withdrawn
KindAppliedApprovedRefused
Other10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 14 Oct 2026, 02:03
    SourceLicenceFetchedLink
    npadCC-BY-4.014 Oct 2026, 02:03open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    npadCC-BY-4.014 Oct 2026, 02:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 49 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 121 days; Appeal window: 4 weeks; If appealed: +127 days; Building starts: 130 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=163)55 daysIf more info asked (1 in 6)With further information: median 121 days (n=28)121 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 127 days (n=40, all appeals within 1.5 km)+127 daysBuilding startsStart notice: median 130 days after permission (n=62)130 days after permissionSigned off445 days after the start, for the few who file. 34% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated196 decided home extensions, 62 start notices, 40 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    5 of 21 appealed refusals became permissions. 2 of 20 appealed approvals were reversed.

    Refusals appealed21 decided
    5 became permissions
    Approvals appealed20 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 9 in the last 12 months
    • 323995 Granted with conditions · Block BZ08, Oscar Traynor Road Residential Development, Oscar Traynor… · 745 m report
    • 323986 Granted with conditions · Oscar Traynor Residential Development, Oscar Traynor Road, Dublin 17 · 745 m report
    • 324121 Granted with conditions · Block BZ03, Oscar Traynor Road Residential Development, Oscar Traynor… · 745 m report
    • 323984 Granted with conditions · Oscar Traynor Road Residential Development, Oscar Traynor Road,… · 745 m report
    • 323989 Granted with conditions · Oscar Traynor Road Residential Development, Oscar Traynor Road,… · 745 m report
    • 323994 Granted with conditions · Block BZ10, Oscar Traynor Road Residential Development, Oscar Traynor… · 745 m report
    • 323998 Granted with conditions · Oscar Traynor Road Residential Development, Oscar Traynor Road,… · 745 m report
    • 324120 Granted with conditions · Oscar Traynor Road Residential Development, Oscar Traynor Road,… · 745 m report
    • 500928 Open · Larch Hill Estate, Coolock, Dublin 17 · 515 m
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved14 Oct 2026, 01:31open
    npadCC-BY-4.014 Oct 2026, 02:03open
    Question 4

    What's changing around you?

    Street map around Clonshaugh Business & Technology Park, Dublin, Santry with 15 numbered planning items
    ⌖ the houseOpen for commentsEmpty land zoned for homesNo decision yetApprovedRefused
    1. 153, Kilmore Drive WEB3429/26No decision yet · 282 m
    2. 298 Santry Close, Santry F26A/0849ENo decision yet · 906 m
    3. 32.6 ha zoned for homesEmpty land zoned for homes · 797 m
    4. 4Unit No AF8, Clonshaugh Business & Technology Park WEB2489/26No decision yet · 165 m
    5. 5Unit 39, Boeing Road F26A/0397EApproved · 193 m
    6. 6Vodafone Critical Data Centre, Clonshaugh Industrial Estate WEB2832/26No decision yet · 270 m
    7. 75, Woodlawn Court WEB1450/26Approved · 342 m
    8. 8Unit 27, Airways Industrial Estate F26A/0100EApproved · 370 m
    9. 9No. 2 Turnapin Grove, Turnapin Little F26A/0064EApproved · 381 m
    10. 1012 Woodlawn Rise, Dublin 17 WEB1259/26Approved · 413 m
    11. 1135 Turnapin Cottages, Cloghran F26A/0599ERefused · 429 m
    12. 1229 Turnapin Cottages, Turnapin Little F26A/0551EApproved · 498 m
    13. 1319, Woodlawn Close WEB2433/26No decision yet · 513 m
    14. 14Larch Hill Estate, Coolock WEB5466/25Approved · 515 m
    15. 1522 Turnapin Cottages, Cloghran F25A/1202EApproved · 588 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 54 permissions since 2016, 20 show a start notice and 7 have a completion certificate.

    74 applications lodged within 500 m. Council: 54 approved, 5 refused. After appeals: 54 approved. Of those: 7 signed off, 2 built with the owner's opt-out, 11 started, 34 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT54: lodged → approved5: lodged → refused10: lodged → withdrawn or invalid5: lodged → undecided54: approved → approved5: refused → refused10: withdrawn or invalid → withdrawn5: undecided → undecided34: approved → no start notice found2: approved → built, owner opted out11: approved → started, not signed off7: approved → signed off74 lodged74 lodged54 approved54 approved5 refused5 refused10 withdrawn or invalid10 withdrawn or invalid5 undecided5 undecided54 approved54 approved5 refused5 refused10 withdrawn10 withdrawn5 undecided5 undecided34 no start notice found34 no start notice found2 built, owner opted out2 built, owner opted out11 started, not signed off11 started, not signed off7 signed off7 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured74 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    10 deadlines within 1.0 km; the first closes 19 Oct 2026.

    10 deadlines in the next 30 days: 2026-10-19 ACP 323984: Allow appeal delete conditions; 2026-10-19 ACP 324120: Allow appeal delete conditions; 2026-10-19 ACP 323989: Allow appeal amend conditions; 2026-10-19 ACP 323998: Allow appeal delete conditions; 2026-10-19 ACP 323986: Allow appeal delete conditions; 2026-10-19 ACP 323994: Allow appeal delete conditions; 2026-10-19 ACP 324121: Allow appeal delete conditions; 2026-10-19 ACP 323995: Allow appeal delete conditions; 2026-10-22 F26A/0849E: application received — The development will consist of the demolition of the existing shed to the side of the house, the construction of a prop; 2026-11-06 WEB3429/26: application received — The development will consist of: First-floor extension to front and side over existing garage conversion, totalling apprtoday19 Oct24 Oct29 Oct3 Nov8 Nov13 NovACP 323984: Allow appeal delete conditions · 745 m away · 2026-10-19ACP 324120: Allow appeal delete conditions · 745 m away · 2026-10-19ACP 323989: Allow appeal amend conditions · 745 m away · 2026-10-19ACP 323998: Allow appeal delete conditions · 745 m away · 2026-10-19ACP 323986: Allow appeal delete conditions · 745 m away · 2026-10-19ACP 323994: Allow appeal delete conditions · 745 m away · 2026-10-19ACP 324121: Allow appeal delete conditions · 745 m away · 2026-10-19ACP 323995: Allow appeal delete conditions · 745 m away · 2026-10-19F26A/0849E: application received — The development will consist of the demolition of the existing shed to the side of the house, the construction of a prop · 906 m away · 2026-10-22WEB3429/26: application received — The development will consist of: First-floor extension to front and side over existing garage conversion, totalling appr · 282 m away · 2026-11-06
    Comments closeHigh Court window ends
    • Time to ask the High Court for a review ends 19 Oct 20265 days left
      Allow appeal delete conditions
      745 m away
    • Time to ask the High Court for a review ends 19 Oct 20265 days left
      Allow appeal delete conditions
      745 m away
    • Time to ask the High Court for a review ends 19 Oct 20265 days left
      Allow appeal amend conditions
      745 m away
    • Time to ask the High Court for a review ends 19 Oct 20265 days left
      Allow appeal delete conditions
      745 m away
    • Time to ask the High Court for a review ends 19 Oct 20265 days left
      Allow appeal delete conditions
      745 m away
    • Time to ask the High Court for a review ends 19 Oct 20265 days left
      Allow appeal delete conditions
      745 m away
    • Time to ask the High Court for a review ends 19 Oct 20265 days left
      Allow appeal delete conditions
      745 m away
    • Time to ask the High Court for a review ends 19 Oct 20265 days left
      Allow appeal delete conditions
      745 m away
    • Comments close 22 Oct 20268 days left
      2F26A/0849E · application received — The development will consist of the demolition of the existing shed to the side of the house,…
      €20 to the council · 906 m away
    • Comments close 6 Nov 202623 days left
      1WEB3429/26 · application received — The development will consist of: First-floor extension to front and side over existing garage…
      €20 to the council · 282 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 1 within 1.0 km

    Empty land zoned for homes 1

    • 32.6 ha zoned for homes · no homes built on it yet · 797 m
    Sources: acp, bcms, derelict, moderngov, npad, rzlt · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    derelictCC-BY-4.012 Oct 2026, 23:08open
    moderngovpublic14 Oct 2026, 01:30open
    npadCC-BY-4.014 Oct 2026, 02:03open
    rzltCC-BY-4.012 Oct 2026, 00:14open
    Figure 7

    Applications within 500 m, by year

    Between 3 and 12 a year; busiest 2024. 92% of decisions were approvals.

    2017: 4, 2018: 3, 2019: 8, 2020: 6, 2021: 9, 2022: 6, 2023: 4, 2024: 12, 2025: 10, 2026: 12051015202017: 3 approved2017: 1 refused4’17*2018: 2 approved2018: 1 refused3’182019: 7 approved2019: 1 refused8’192020: 5 approved2020: 1 undecided6’202021: 8 approved2021: 1 undecided9’212022: 3 approved2022: 3 withdrawn or invalid6’222023: 4 approved4’232024: 11 approved2024: 1 refused12’242025: 5 approved2025: 5 withdrawn or invalid10’252026: 6 approved2026: 1 refused2026: 2 withdrawn or invalid2026: 3 undecided12’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 1.0 km 36 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 14 Oct 2026, 02:03
    SourceLicenceFetchedLink
    npadCC-BY-4.014 Oct 2026, 02:03open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    Building work nearby 11 in the last 12 months
    1 signed off as finished5 not signed off5 no sign-off needed
    • Elder Avenue, Oscar Traynor Woods, Dublin 17 · 25 Sept 2026 · 7-day notice not signed off · LRD6019-22-S3 · 956 m
    • M1 Cherrywood, Dublin · 14 Aug 2026 · 55 homes · start notice not signed off · DZ24A/1024/WEB · 290 m
    • M1, Dublin · 5 Aug 2026 · 185 homes · 7-day notice not signed off · DZ24A/1024/WEB · 290 m
    • 13 Woodlawn View, Dublin 17, D17 HH90 · 14 Jul 2026 · short notice no sign-off needed · 3325/24 · 546 m
    • 38 Oak Green, Dublin 9, Dublin, D09 A7P9 · 26 Jun 2026 · start notice, opted out no sign-off needed · F26A/0083 · 640 m
    • 5 Woodlawn Court, Dublin 17, D17 PW97 · 23 Jun 2026 · start notice, opted out no sign-off needed · WEB1450/26 · 356 m
    • 63 Oak Rise, Dublin 9, Dublin, D09 R2Y9 · 18 Jun 2026 · 1 homes · short notice no sign-off needed · 610 m
    • Santry, Dublin 17, Dublin, D17 N603 · 10 Jun 2026 · short notice no sign-off needed · 663 m
    • Block 1 Northwood Avenue, Dublin, Fingal, D09 V2F7 · 22 Jan 2026 · start notice not signed off · F25A/0055E · 772 m
    • BOEING ROAD, Dublin 17, Dublin, D17 W599 · 9 Jan 2026 · start notice not signed off · F25A/0234E · 255 m
    • Constellation Road, Dublin, Fingal, D17 YN12 · 14 Oct 2025 · 7-day notice signed off · F25A/0606E · 514 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 14 Oct 2026, 00:33
    SourceLicenceFetchedLink
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    Homes coming 0 not started
    • Birch Wood, Northwood, Santry, Dublin 9 (Phase 1)* · Completed · 20 homes · 532 m
    • Blackwood Square, Northwood Avenue, Santry Dublin 9 (Phase 1)* · Completed · 33 homes · 532 m
    • Niven Oaks, Northwood Road, Santry, Dublin 9 (Phase 1)* · On site · 132 homes · 532 m
    • Niven Oaks, Northwood Road, Santry, Dublin 9 (Phase 2)* · On site · 38 homes · 532 m
    • Whitehaven, Northwood Avenue, Santry, Dublin 9 (Phase 1) · Completed · 47 homes · 532 m
    • Whitehaven, Northwood Avenue, Santry, Dublin 9 (Phase 2) · Completed · 47 homes · 532 m
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    npadCC-BY-4.014 Oct 2026, 02:03open
    social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Larch Hill Estate39no activity on site reported (2026-Q2)515 m
    Oscar Traynor Road Site853132 built · 721 being built (2026-Q2)745 m
    Lilmar Industrial Estate2929 not started (2026-Q2)811 m
    Clonshaugh House4040 built (2025-Q2)831 m
    Woodhurst55no activity on site reported (2025-Q4)922 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Naíonra Montessori · Crèche8 Oct 2024 · report · Tusla Early Years Inspectorate900 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: dublin_pipeline, npad, schools, tusla_ey · fetched 12 Oct 2026, 23:02
    SourceLicenceFetchedLink
    dublin_pipelineCC-BY-4.012 Oct 2026, 23:02open
    npadCC-BY-4.014 Oct 2026, 02:03open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here79
    Council middle64
    Homes started
    Here1,350
    Council middle105
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    npadCC-BY-4.014 Oct 2026, 02:03open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    3% of homes built before 1971 (council 52%). 31% owner-occupied (council 47%).

    Homes built before 1971
    3% · council 52%
    Homes built since 2001
    72% · council 19%
    Owner-occupied
    31% · council 47%
    Rented
    56% · council 45%
    Children under 15
    24% · council 15%
    Aged 65 and over
    6% · council 13%
    Households with 2+ cars
    14% · council 19%
    Work mainly from home
    4% · council 12%
    This small area (215 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268121002

    Road noise
    60–64 dB
    day–night average (EPA 2022) · airport noise zone C
    Bus
    451 m
    Clonshaugh West · 27B · busiest stop within 500 m: 0 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 1.0 km
    OPW flood map area, not beside the house
    Nearest school
    900 m
    Gaelscoil Cholmcille, 209 pupils
    Homes sold nearby
    59
    in 3 years, 7 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Gaelscoil Cholmcille · primary · 209 pupils · 900 m

    Stops 21

    • Clonshaugh West · 27B · 0/hour at peak · 451 m
    • Larch Hill · 27B, N6 · 9/hour at peak · 709 m
    • Clonshaugh North · 27B · 0/hour at peak · 710 m
    • Furry Park · 16, 16D, 27B, 33, 41, 41B · 18/hour at peak · 713 m
    • Turnapin Lane · 16, 16D, 27B, 33, 41, 41B · 18/hour at peak · 714 m
    • Furry Park · 16, 27B, 33, 33E, 33n, 41 · 14/hour at peak · 723 m
    • Larch Hill · 27B, N6 · 9/hour at peak · 726 m
    • Turnapin Lane · 16, 27B, 33, 33E, 33n, 41 · 14/hour at peak · 728 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Gaelscoil Cholmcille · 900 m-5.4% pupils (209)

    Open consultations

    Council meetings 30 items

    Public land

    • The Industrial Development Authority · 2.77 ha · 0 m
    • The Industrial Development Authority · 5.02 ha · 63 m
    • Dublin City Council · 1.05 ha · 120 m
    • The Industrial Development Authority · 21.83 ha · 132 m
    • The Industrial Development Authority · 12.26 ha · 134 m
    • Electricity Supply Board · 0.29 ha · 136 m
    Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
    SourceLicenceFetchedLink
    gtfsCC-BY-4.011 Oct 2026, 23:43open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.014 Oct 2026, 02:03open
    consultpublic14 Oct 2026, 01:30open
    moderngovpublic14 Oct 2026, 01:30open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Zoned C2.1 (economic development and employment), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    2. Application 282 m away open for comments until 6 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Priorswood A
    Electoral area
    Artane-Whitehall
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned C2.1 (economic development and employment); not protected; no vacant land tax.
    • 1 site nearby could change: 1 empty zoned plot.
    • 2 applications open for comments nearby; nearest closes 6 Nov 2026.
    • Clonshaugh West (bus 27B) 451 m away: 2 a day, fewer than one an hour at morning peak.
    • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022); inside Dublin Airport Noise Zone C.
    • Here (2022 census): 56% rent (council 45%); 10% of homes empty (council 8%); most built 2001–2010; 51% drive to work (council 28%); population down 3% since 2016.
    • 1 home extension within 250 m since 2026.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.013 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC-BY-NC-ND-4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public14 Oct 2026
    www2.courts.ie—all-rights-reserved14 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.012 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC-BY-4.012 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.012 Oct 2026
    esbnetworks.ie—all-rights-reserved (esbnetworks.ie di… · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public14 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.014 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…14 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 14 Oct 2026, 10:44 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.