Planning report · Fingal County Council · 500 m around the house · the last 12 months · 24 Oct 2026, 11:26

Bramblefield Crescent

53.40548, -6.41373

Homes here mostly date from the 1990s. 1 planning file on this house, the latest from 2023. Home extensions nearby almost always get approved (92%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations. 1 planning file on this house, the latest from 2023.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2023: FW23B/0015 · attic or dormer, approved

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    FW23B/0015 · attic or dormer · approved 2023 · not started, runs out 2028
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Rottapharm Limited (515 m); Barclay Chemicals Manufacturing Limited (592 m); Astellas Ireland Company Limited (633 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Radon grid squares2
Monuments3Enclosure; R149737
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (NIFM), Sites and Monuments Record · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 94–96% by type. A new house in a garden is harder: 50% approved, and 1 in 3 is asked for more information.

Single-storey rear28 decided · more info asked 11%
96% · council 92%
Attic or dormer107 decided · more info asked 6%
94% · council 92%
New house in a garden or site12 decided · more info asked 33%
50% · council 53%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 147 nearby, 2,164 council-wide

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

2 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic32—

On Bramblefield: 10 extensions in 10 years, 88% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 24 Oct 2026, 02:29
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 49 days. 1 in 10 is asked for more information, which adds about 52 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 49 days; Appeal window: 4 weeks; If appealed: +193 days; Building starts: 112 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 45–52 (n=171)49 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 193 days (n=17, all appeals within 1.5 km)+193 daysBuilding startsStart notice: median 112 days after permission (n=67)112 days after permissionSigned off351 days after the start, for the few who file. 34% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated189 decided home extensions, 67 start notices, 17 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    4 of 10 appealed refusals became permissions. 1 of 9 appealed approvals were reversed.

    Refusals appealed10 decided
    4 became permissions
    Approvals appealed9 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Bramblefield Crescent with 8 numbered planning items
    ⌖ the houseOpen for commentsNo decision yetApproved
    1. 119 Deerhaven Park, Huntstown FW26A/0362ENo decision yet · 334 m
    2. 2A 0.579 Ha. site at Partlickstown, Navan Road FW25A/0553ENo decision yet · 136 m
    3. 329 Swallow Brook View, Clonee FW26A/0257EApproved · 148 m
    4. 420 The Drive Pheasant Run, Clonee FW26A/0256EApproved · 241 m
    5. 520 Deerhaven Avenue, Huntstown FW26A/0138EApproved · 300 m
    6. 640 Deerhaven Avenue, Dublin 15 FW26A/0226EApproved · 377 m
    7. 737 The Drive, Hunters Run FW26A/0250EApproved · 424 m
    8. 8203 Huntstown Wood, Mulhuddart FW26A/0143EApproved · 457 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 44 permissions since 2016, 12 show a start notice and 1 has a completion certificate.

    61 applications lodged within 500 m. Council: 44 approved, 5 refused. After appeals: 44 approved. Of those: 1 signed off, 6 built with the owner's opt-out, 5 started, 31 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT44: lodged → approved5: lodged → refused10: lodged → withdrawn or invalid2: lodged → undecided44: approved → approved5: refused → refused10: withdrawn or invalid → withdrawn2: undecided → undecided31: approved → no start notice found6: approved → built, owner opted out5: approved → started, not signed off1: approved → signed off1: approved → ran out61 lodged61 lodged44 approved44 approved5 refused5 refused10 withdrawn or invalid10 withdrawn or invalid2 undecided2 undecided44 approved44 approved5 refused5 refused10 withdrawn10 withdrawn2 undecided2 undecided31 no start notice found31 no start notice found6 built, owner opted out6 built, owner opted out5 started, not signed off5 started, not signed off1 signed off1 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured61 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 28 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-28 FW26A/0362E: application received — Planning Permission is sought for a modification to granted planning permission Reg. Ref. FW26A/0210E - Change of pitchetoday29 Oct3 Nov8 Nov13 Nov18 Nov23 NovFW26A/0362E: application received — Planning Permission is sought for a modification to granted planning permission Reg. Ref. FW26A/0210E - Change of pitche · 334 m away · 2026-10-28
    Comments close
    • Comments close 28 Oct 20264 days left
      1FW26A/0362E · application received — Planning Permission is sought for a modification to granted planning permission Reg. Ref.…
      €20 to the council · 334 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Applications within 500 m, by year

    Between 4 and 13 a year; busiest 2024. 90% of decisions were approvals.

    2021: 13, 2022: 8, 2023: 10, 2024: 13, 2025: 4, 2026: 13051015202021: 12 approved2021: 1 refused13’21*2022: 5 approved2022: 2 refused2022: 1 withdrawn or invalid8’222023: 10 approved10’232024: 8 approved2024: 2 refused2024: 3 withdrawn or invalid13’242025: 2 approved2025: 1 withdrawn or invalid2025: 1 undecided4’252026: 7 approved2026: 5 withdrawn or invalid2026: 1 undecided13’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 14 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Building work nearby 2 in the last 12 months
    1 not signed off1 no sign-off needed
    • 19 Deerhaven Park, Dublin 15, Dublin, D15 WPV4 · 26 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · FW26A/0210E · 351 m
    • 16 The Park, Clonee, Dublin · 12 Oct 2026 · 1 homes · start notice not signed off · FS5W/037/26 · 357 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Bramblefield · 12 applications in 10 years · 88% approved · most common: attic conversion / dormer

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Canterbury Gate——284 m
    Blakestown Road and Huntstown Way3030 not started (2026-Q2)997 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Schoolers · Crèche22 May 2024 · report · Tusla Early Years Inspectorate184 m
    Juniors Playschool and Montessori · Crèche15 Aug 2024 · report · Tusla Early Years Inspectorate250 m
    Little Jack's Corner · Crèche23 Sept 2025 · report · Tusla Early Years Inspectorate542 m
    Children's Kingdom · Crèche1 May 2024 · report · Tusla Early Years Inspectorate557 m
    Phoenix Childcare · Crèche9 Dec 2024 · report · Tusla Early Years Inspectorate634 m
    Avenir School of Montessori Education · Crèche17 Jun 2026 · report · Tusla Early Years Inspectorate756 m
    Missus Tatty's Nursery Ltd · Crèche26 Feb 2024 · report · Tusla Early Years Inspectorate856 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 24 Oct 2026, 02:29
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Fingal County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here23
    Council middle3
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    1% of homes built before 1971 (council 11%). 77% owner-occupied (council 67%).

    Homes built before 1971
    1% · council 11%
    Homes built since 2001
    14% · council 43%
    Owner-occupied
    77% · council 67%
    Rented
    18% · council 28%
    Children under 15
    28% · council 22%
    Aged 65 and over
    2% · council 11%
    Households with 2+ cars
    52% · council 42%
    Work mainly from home
    7% · council 12%
    This small area (318 people)Fingal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267028033

    Road noise
    65–69 dB
    day–night average (EPA 2022) · airport noise zone D
    Bus
    221 m
    Huntstown Wood · 270, 270T, 70 · busiest stop within 500 m: 12 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    407 m
    Sacred Heart NS, 632 pupils
    Homes sold nearby
    46
    in 3 years, 2 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Sacred Heart NS · primary · 632 pupils · 407 m
    • Mary Mother of Hope Junior National School · primary · 349 pupils · 680 m
    • Mary Mother of Hope Senior NS · primary · 429 pupils · 741 m

    Stops 25

    • Huntstown Wood · 270, 270T, 70, 70n · 7/hour at peak · 221 m
    • Deerhaven · 270, 270T, 70, 70n · 7/hour at peak · 342 m
    • Deerhaven · 270, 270T, 70, 70n · 7/hour at peak · 358 m
    • Sacred Heart Church · 220, 220A, 39, 39A, BI01 · 12/hour at peak · 465 m
    • Sacred Heart Church · 220, 220A, 39, 39A, BI01 · 6/hour at peak · 480 m
    • Damastown Close · 38, 38A, 38B · 5/hour at peak · 498 m
    • Damastown Close · 38, 38A, 38B, 70n · 5/hour at peak · 525 m
    • Huntstown Green · 220, 220A, 39, 39A · 12/hour at peak · 542 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Sacred Heart NS · 407 m-4.4% pupils (632)
    • Mary Mother of Hope Junior National School · 680 m-7.7% pupils (349)
    • Mary Mother of Hope Senior NS · 741 m0% pupils (429)

    Open consultations

    Council meetings 30 items

    Public land

    • Fingal County Council · 2.91 ha · 40 m
    • Fingal County Council · 24.33 ha · 137 m
    • Fingal County Council · 1.02 ha · 150 m
    • Fingal County Council · 0.35 ha · 158 m
    • Fingal County Council · 0.01 ha · 387 m
    • Fingal County Council · 0.34 ha · 403 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 24 Oct 2026, 02:46
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Council consultation portalsPublic24 Oct 2026, 01:49open
    Council meetings (ModernGov)Public24 Oct 2026, 02:46open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Attic or dormer (FW23B/0015) approved 2023, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. Application 334 m away open for comments until 28 Oct 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Mapped at 65–69 dB from road traffic: will you hear it inside?
      Ask for: A visit at rush hour (and at night), and the windows' glazing specification.
      Visit at rush hour
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Huntstown
    Electoral division
    Blanchardstown-Blakestown
    Electoral area
    Ongar
    Council
    Fingal County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest FW23B/0015, approved 2023, not started, runs out 2028.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 1 application open for comments nearby; nearest closes 28 Oct 2026.
    • Sacred Heart Church (bus 220, 220A) 465 m away: 12 an hour at morning peak; 44 from all stops within 500 m.
    • Noise from road traffic mapped at 65–69 dB (day-evening-night average, EPA 2022); inside Dublin Airport Noise Zone D.
    • Here (2022 census): 77% owner-occupied (council 67%); 2% of homes empty (council 5%); most built 1991–2000; 57% drive to work (council 52%); population up 13% since 2016.
    • 3 home extensions within 250 m since 2026. Most were dormers or attic conversions. On Bramblefield: 10 in 10 years, 88% approved.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.024 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public24 Oct 2026
    www2.courts.ie—© the publisher23 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public24 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.024 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence24 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 24 Oct 2026, 11:26 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.