RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.
R2 — Existing residentialthe fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029
RS - Residential: Provide for residential development and protect and improve residential amenity
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (0.72 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
The development will consist of the conversion of existing attic space within the existing dwelling for storage and study space, including the installation of 1 no. rooflight to the front roof slope, 5 no. rooflights to the rear roof slope, and the relocation of existing solar panels on the rear roof slope.
WEB1605/26received 15 Mar 2026decided 7 May 2026467 m away
Planning permission for retention of modifications to development permitted under planning reference ABP-310077-21 and amended under planning reference ABP-312264-21 and LRD6011/22-S3; and planning permission for development. The retention of minor modifications includes: (i) alterations to the permitted ESB substation doors at ground floor level on the northern and southern elevations; (ii) 2 no. roof maintenance access doors at second floor level; and (iii) changes to the landscaping treatment on the northern elevation between Buildings 4 & 5. Planning permission is sought for (i) the provision of an ‘Out of Home’ parcel delivery/return area for residents at ground floor level on the northern elevation in replacement of a permitted ESB Sub-station; and (ii) provision of Resident Services low level signage on the western elevation.
WEB2250/24received 4 Oct 2024decided 27 Nov 2024499 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 19 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Dublin City Council — Dublin city and suburbs
0.38 hafolio DN2705N81 m awayas of 1 Jul 2023
Dublin City Council — Dublin city and suburbs
0.22 hafolio DN8570N220 m awayas of 1 Apr 2023
Fingal County Council — Dublin city and suburbs
0.01 hafolio DN204267F411 m awayas of 1 Jul 2023
The Minister for Education and Skills — Dublin city and suburbs
0.44 hafolio DN195625F439 m awayas of 1 Apr 2023
The Minister for Education and Skills — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 23:41 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.