PlanningRegister.ie
Planning report · Galway County Council · 2000 m around the house · the last 12 months · 23 Oct 2026, 14:10

Kilmoylan ED, Tuam Municipal District, County Galway, Connacht, Éire / Ireland

53.41386, -8.85465

Homes here mostly date from the 2000s. 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Galway County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Monuments49Enclosure; Country house
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 94% approved, and 1 in 2 are asked for more information.

New house in a garden or site17 decided · more info asked 65%
94% · council 81%
Approved nearbyGalway overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 17 nearby, 5,278 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 3

    How long, and what if someone objects?

    Question 4

    What's changing around you?

    Street map around Kilmoylan ED, Tuam Municipal District, County Galway, Connacht, Éire / Ireland with 8 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved
    1. 1Bullaun, Corofin 2661639No decision yet · 472 m
    2. 2Ballynacreg south, Corofin 2661276Approved with conditions · 1.5 km
    3. 3Corbally South, Cummer 2660526Approved with conditions · 1.5 km
    4. 4Ballynacreg South, Cummer Tuam 2660972Approved with conditions · 1.0 km
    5. 5Ardskea More, Cummer 2660277Approved with conditions · 1.2 km
    6. 6Ballintober, Cummer 2561617Approved with conditions · 1.4 km
    7. 7Ballynacreg South, Cummer 2561575Approved with conditions · 1.7 km
    8. 8Ballynacreg South, Cummer Tuam 2661301Approved with conditions · 1.7 km
    Figure 3

    The next 30 days

    3 deadlines within 2.0 km; the first closes 23 Oct 2026.

    3 deadlines in the next 30 days: 2026-10-23 2661276: CONDITIONAL — to construct a two storey dwelling and garage. Permission to include new road access, wastewater and percolation system ; 2026-11-02 2660526: CONDITIONAL — for construction of new dwelling along with garage, treatment septic tank system and associated site works. This plannin; 2026-11-05 2661639: application received — sought to construct a dwelling house, domestic garage/fuel store, septic tank, wastewater treatment system and percolatitoday28 Oct2 Nov7 Nov12 Nov17 Nov22 Nov2661276: CONDITIONAL — to construct a two storey dwelling and garage. Permission to include new road access, wastewater and percolation system · 1.5 km away · 2026-10-232660526: CONDITIONAL — for construction of new dwelling along with garage, treatment septic tank system and associated site works. This plannin · 1.5 km away · 2026-11-022661639: application received — sought to construct a dwelling house, domestic garage/fuel store, septic tank, wastewater treatment system and percolati · 472 m away · 2026-11-05
    Comments closeTime to appeal ends
    • Time to appeal ends 23 Oct 2026closes today
      22661276 · CONDITIONAL — to construct a two storey dwelling and garage. Permission to include new road access, wastewater and…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.5 km away
    • Time to appeal ends 2 Nov 202610 days left
      32660526 · CONDITIONAL — for construction of new dwelling along with garage, treatment septic tank system and associated site…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.5 km away
    • Comments close 5 Nov 202613 days left
      12661639 · application received — sought to construct a dwelling house, domestic garage/fuel store, septic tank, wastewater…
      €20 to the council · 472 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Open for comments €20 to comment

    • 1Bullaun , Corofin , Co. Galway comments close 5 Nov 2026
      sought to construct a dwelling house, domestic garage/fuel store, septic tank, wastewater treatment system…
      26616391 Oct 20262 homes472 m
    Every application within 2.0 km 8 in the last 12 months

    See every application on the map

    • 8Ballynacreg South , Cummer Tuam , Co. Galway Approved with conditions
      FOR THE CONSTRUCTION OF A DWELLINGHOUSE, DOMESTIC GARAGE, PROPRIETARY TREATMENT SYSTEM AND PERCOLATION AREA…
      266130115 Sept 20261 homes1.7 km
    • 2Ballynacreg south , Corofin , Galway Approved with conditions
      to construct a two storey dwelling and garage. Permission to include new road access, wastewater and…
      266127625 Sept 20261 homes1.5 km
    • 4Ballynacreg South , Cummer Tuam , Co. Galway Approved with conditions
      for the construction of an extension to existing dwelling house, installation of new waste water treatment…
      266097226 Aug 20261 homes1.0 km
    • 3Corbally South , Cummer , Tuam Approved with conditions
      for construction of new dwelling along with garage, treatment septic tank system and associated site works.…
      26605265 Oct 20261 homes1.5 km
    • 5Ardskea More , Cummer , Tuam Co. Galway Approved with conditions
      for construction of new dwelling along with garage, treatment septic tank system & associated site works
      26602774 Jun 20261 homes1.2 km
    • 6Ballintober , Cummer , Tuam Approved with conditions
      for construction of front porch and conversion of an existing attic space including construction of two…
      256161720 Feb 20261 homes1.4 km
    • 7Ballynacreg South , Cummer , tuam Approved with conditions
      for the construction of a dwelling house, detached garage, treatment plant and percolation area and all…
      256157517 Dec 20251.7 km
    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    Building work nearby 3 in the last 12 months
    3 no sign-off needed
    • Ardskea More, Ellagh, Galway · 26 Aug 2026 · short notice no sign-off needed · 2660277 · 1.2 km
    • Ardskea More, Ellagh, Galway · 19 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2660277 · 1.2 km
    • Ardskea More, Ellagh, Galway · 27 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 2561000 · 1.1 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 23 Oct 2026, 02:22
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    0
    How busy is this area About as busy as most of Galway County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here2
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 5

    What's the area like?

    Figure 4

    This street block against the council

    84% owner-occupied (council 75%).

    Homes built before 1971
    19% · council 23%
    Homes built since 2001
    47% · council 39%
    Owner-occupied
    84% · council 75%
    Rented
    9% · council 18%
    Children under 15
    20% · council 21%
    Aged 65 and over
    18% · council 17%
    Households with 2+ cars
    60% · council 52%
    Work mainly from home
    15% · council 11%
    This small area (351 people)Galway

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 067144003

    Bus
    759 m
    Bullaun · 527
    Schools, stops and the council

    Schools

    None nearby.

      Stops 4

      • Bullaun · 527 · 759 m
      • Bullaun · 527 · 768 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 23 Oct 2026, 02:42
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Council consultation portalsPublic23 Oct 2026, 01:47open
      Council meetings (ModernGov)Public23 Oct 2026, 02:42open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Application 472 m away open for comments until 5 Nov 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Bullaun
      Electoral division
      Kilmoylan
      Electoral area
      Tuam
      Council
      Galway County Council
      Everything we found, as a list 8 lines
      • Not protected; no vacant land tax.
      • Nothing nearby looks set to change.
      • 1 application open for comments nearby; nearest closes 5 Nov 2026.
      • No scheduled public transport within 800 m.
      • Here (2022 census): 84% owner-occupied (council 75%); 13% of homes empty (council 16%); most built 2001–2010; 64% drive to work (council 66%); population up 9% since 2016.
      • The council decides in a median 54 days (about 8 weeks); 1 in 3 is asked for more information.
      • 8 applications nearby in the last 12 months; 100% approved (council 87%).
      • 2 homes started within 1 km in 3 years (council middle 2).
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 24
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.023 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public23 Oct 2026
      www2.courts.ie—© the publisher22 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public23 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.023 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence23 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 23 Oct 2026, 14:10 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.