PlanningRegister.ie
Planning report · Westmeath County Council · 500 m around the house · the last 12 months · 30 Oct 2026, 07:42

Athlone East Urban ED, The Municipal District of Athlone — Moate, County Westmeath, Leinster, Éire / Ireland

53.41511, -7.93086

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (94%).

See on the mapWatch this area

Not held yet for Westmeath County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 7 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Athlone (295 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 80% approved, and 1 in 2 are asked for more information.

New house in a garden or site5 decided · more info asked 60%
80% · council 79%
Approved nearbyWestmeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 5 nearby, 822 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 54 days. 1 in 4 is asked for more information, which adds about 75 days. Building starts about 7 months after permission.

    Comments open: 5 weeks · €20; Council decision: 54 days; If more info asked (1 in 4): 129 days; Appeal window: 4 weeks; Building starts: 210 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 50–55 (n=25)54 daysIf more info asked (1 in 4)With further information: median 129 days (n=9)129 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 210 days after permission (n=11)210 days after permissionSigned off55% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated34 decided home extensions, 11 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    0 of 1 appealed refusals became permissions. 1 of 1 appealed approvals were reversed.

    Refusals appealed1 decided
    0 became permissions
    Approvals appealed1 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Figure 5

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 6

      Applications within 500 m, by year

      Between 1 and 1 a year; busiest 2023. 100% of decisions were approvals.

      2022: 2, 2023: 1, 2024: 105102022: 2 approved2’22*2023: 1 approved1’232024: 1 approved1’24
      ApprovedRefusedWithdrawn or invalidUndecided

      2022 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 0 in the last 12 months

      See every application on the map

        How we work this out
        Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
        Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 30 Oct 2026, 05:03
        SourceLicenceFetchedLink
        National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
        An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
        Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
        0
        Named places nearby: estate, schemes, crèches, schools

        Named places estate, developments, inspections

        Crèches and schools inspected

        NameLatest inspectionDistance
        Little Acorns Montessori · Crèche29 Apr 2026 · report · Tusla Early Years Inspectorate985 m
        How we work this out
        Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
        Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
        SourceLicenceFetchedLink
        Department of Education school listCC BY 4.027 Oct 2026, 23:04open
        Tusla early years registerPublic register28 Oct 2026, 23:19open
        How busy is this area Busier than most of Westmeath County Council.
        Homes approved
        Here10
        Council middle0
        Homes started
        Here23
        Council middle2
        How we work this out
        Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
        Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
        SourceLicenceFetchedLink
        An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
        Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
        National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
        Question 5

        What's the area like?

        Figure 7

        This street block against the council

        39% owner-occupied (council 68%).

        Homes built before 1971
        27% · council 26%
        Homes built since 2001
        27% · council 34%
        Owner-occupied
        39% · council 68%
        Rented
        61% · council 26%
        Children under 15
        14% · council 21%
        Aged 65 and over
        14% · council 15%
        Households with 2+ cars
        18% · council 44%
        Work mainly from home
        14% · council 9%
        This small area (118 people)Westmeath

        MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 237003019

        Bus
        646 m
        MacDiarmada Road · A1, A2
        Nearest school
        974 m
        S N Phoil Naofa, 125 pupils
        Schools, stops and the council

        Schools

        • S N Phoil Naofa · primary · 125 pupils · 974 m

        Stops 8

        • MacDiarmada Road · A1, A2 · 4/hour at peak · 646 m
        • MacDiarmada Road · A1, A2 · 4/hour at peak · 662 m
        • Golden Island · 815, 819, 850, A1, A2, ATH1 · 7/hour at peak · 700 m
        • Golden Island · 190, 815, 819, 850, A1, A2 · 5/hour at peak · 701 m
        • Castlemaine St · ATH1 · 2/hour at peak · 722 m

        Schools growing or shrinking planning in 3 years · pupils last year

        • S N Phoil Naofa · 974 m-3.1% pupils (125)
        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 30 Oct 2026, 05:03
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
        Department of Education school listCC BY 4.027 Oct 2026, 23:04open
        National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
        Council consultation portalsPublic30 Oct 2026, 01:04open
        Council meetings (ModernGov)Public30 Oct 2026, 02:17open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Golden Island (Kilmaine)
        Electoral division
        Athlone East Urban
        Electoral area
        Athlone
        Council
        Westmeath County Council
        Everything we found, as a list 6 lines
        • Not protected; no vacant land tax.
        • Nothing nearby looks set to change.
        • No morning-peak service within 500 m; nearest is MacDiarmada Road, 646 m away (4 an hour).
        • Here (2022 census): 61% rent (council 26%); 19% of homes empty (council 9%); most built 1991–2000; 48% drive to work (council 63%); population up 10% since 2016.
        • Around here the council decides in a median 54 days (about 8 weeks); 1 in 5 is asked for more information.
        • 23 homes started within 1 km in 3 years (council middle 2).
        What the terms mean 3 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 25
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.030 Oct 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public30 Oct 2026
        www2.courts.ie—© the publisher29 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
        data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public30 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.030 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence30 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Oct 2026
        gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
        tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 30 Oct 2026, 07:42 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.