Planning report · Meath County Council · 500 m around the house · the last 12 months · 15 Oct 2026, 23:26

L6220

53.42477, -6.57787

Homes here mostly date from the 1970s. 1 planning file on this house, the latest from 2022.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 1 planning file on this house, the latest from 2023.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of KilcloonBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2023: 22664 · extension, approved2017: 1 file on Kilcloon2018: 2 files on Kilcloon2019: 3 files on Kilcloon2020: 3 files on Kilcloon2021: 9 files on Kilcloon2022: 4 files on Kilcloon2023: 5 files on Kilcloon2024: 3 files on Kilcloon2025: 3 files on Kilcloon2026: 3 files on Kilcloon36 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    22664 · extension · approved 2023 · not started, runs out 2028
    approvedstartedsigned off
  • 13 Sept 2023 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares1
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 15 Oct 2026, 02:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.015 Oct 2026, 00:44open
National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 93% approved, and 1 in 2 is asked for more information.

New house in a garden or site41 decided · more info asked 41%
93% · council 78%
Approved nearbyMeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 41 nearby, 2,960 council-wide

Figure 3

Kilcloon, file by file since 2017

13 of 13 decided extensions on the road were approved. New houses in side gardens or on sites: 15 of 17.

36 planning files on Kilcloon since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2019 · single-storey rear · approved · RA190949No number · 2019 · porch / front · approved · RA191420No number · 2019 · other extension · approved · RA191716No number · 2020 · other extension · approved · RA200264No number · 2020 · garage conversion · approved · RA201349No number · 2021 · two-storey rear · approved · 211736No number · 2021 · other extension · approved · 212184No number · 2021 · single-storey rear · approved · 212273No number · 2022 · single-storey side · approved · 22664No number · 2023 · two-storey rear · approved · 2318No number · 2023 · rear · approved · 2360469No. 5 · 2023 · single-storey rear · approved · 23998No number · 2025 · attic conversion / dormer · approved · 2561102Porches, roofs, otherNo number · 2017 · other work · approved · RA170248No number · 2018 · other work · approved · RA180104No number · 2018 · other work · approved · RA181488No number · 2022 · other work · refused · 22834No number · 2024 · other work · approved · 2460827No number · 2026 · other work · refused · 2660669New house in a side gardenNo number · 2020 · new house · approved · RA201825No number · 2021 · new house · approved · 211020No number · 2021 · new house · approved · 211021No number · 2021 · new house · approved · 211560No number · 2021 · new house · approved · 212253No number · 2021 · new house · approved · 21471No number · 2021 · new house · approved · 21905No number · 2022 · new house · approved · 22126No number · 2022 · new house · approved · 221298No number · 2023 · new house · approved · 23371No number · 2023 · new house · approved · 2360014No number · 2024 · new house · approved · 2460201No number · 2024 · new house · refused · 2460626No number · 2025 · new house · approved · 2560172No number · 2025 · new house · approved · 2560503No number · 2026 · new house · approved · 2660342No number · 2026 · new house · refused · 2660388
ApprovedRefusedWithdrawn or invalid

36 files with "Kilcloon" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 15 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 15 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.015 Oct 2026, 00:44open
    National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 3 is asked for more information, which adds about 114 days.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 3): 175 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–62 (n=16)52 daysIf more info asked (1 in 3)With further information: median 175 days (n=8)175 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off60% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated24 decided home extensions, 5 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 1 appealed approvals were reversed.

    Approvals appealed1 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around L6220 with 5 numbered planning items
    ⌖ the houseBuilding startedApprovedNo decision yetRefused
    1. 1Baile Na Fheir, Harristown 25/60503Building started · 150 m
    2. 2SITE C KILCLOON COMMUNITY SITES, BALLYNARE CROSS 2660342Approved with conditions · 113 m
    3. 3Harristown, Kilcloon 26120No decision yet · 193 m
    4. 4Harristown, Kilcloon 2660388Refused · 261 m
    5. 5Harristown, Kilcloon 2660081No decision yet · 410 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 27 permissions since 2016, 15 show a start notice and 6 have a completion certificate.

    30 applications lodged within 500 m. Council: 27 approved, 3 refused. After appeals: 27 approved. Of those: 6 signed off, 1 built with the owner's opt-out, 8 started, 10 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT27: lodged → approved3: lodged → refused27: approved → approved3: refused → refused10: approved → no start notice found1: approved → built, owner opted out8: approved → started, not signed off6: approved → signed off2: approved → ran out30 lodged30 lodged27 approved27 approved3 refused3 refused27 approved27 approved3 refused3 refused10 no start notice found10 no start notice found1 built, owner opted out1 built, owner opted out8 started, not signed off8 started, not signed off6 signed off6 signed off2 ran out2 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured30 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Applications within 500 m, by year

      Between 1 and 8 a year; busiest 2021. 90% of decisions were approvals.

      2017: 1, 2018: 2, 2019: 2, 2020: 1, 2021: 8, 2022: 4, 2023: 5, 2024: 2, 2025: 3, 2026: 205102017: 1 approved1’17*2018: 2 approved2’182019: 2 approved2’192020: 1 approved1’202021: 8 approved8’212022: 3 approved2022: 1 refused4’222023: 5 approved5’232024: 1 approved2024: 1 refused2’242025: 3 approved3’252026: 1 approved2026: 1 refused2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 7 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 15 Oct 2026, 02:04
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.015 Oct 2026, 00:44open
      Building work nearby 3 in the last 12 months
      3 not signed off
      • 1Baile Na Fheir, Harristown, Meath · 31 Aug 2026 · 1 homes · start notice not signed off · 25/60503 · 150 m
      • Ballynare Cross, Harristown, Kilcloon, Meath · 23 Mar 2026 · start notice not signed off · RA190810 · 195 m
      • Site L, Kilcloon Community Sites, Ballynare Cross, Harristown,, Kilcloon, Meath · 3 Dec 2025 · 1 homes · start notice not signed off · 2560172 · 240 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 15 Oct 2026, 00:44
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.015 Oct 2026, 00:44open
      0
      Named places nearby: estate, schemes, crèches, schools
      How busy is this area About as busy as most of Meath County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here10
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 15 Oct 2026, 02:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.015 Oct 2026, 00:44open
      National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      92% owner-occupied (council 75%).

      Homes built before 1971
      18% · council 18%
      Homes built since 2001
      25% · council 45%
      Owner-occupied
      92% · council 75%
      Rented
      3% · council 20%
      Children under 15
      24% · council 23%
      Aged 65 and over
      24% · council 12%
      Households with 2+ cars
      73% · council 54%
      Work mainly from home
      17% · council 11%
      This small area (182 people)Meath

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 167024002/02

      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      216 m
      Scoil Oilibheir Naofa, 225 pupils
      Homes sold nearby
      1
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Scoil Oilibheir Naofa · primary · 225 pupils · 216 m

      Stops 0

        Schools growing or shrinking planning in 3 years · pupils last year

        • Scoil Oilibheir Naofa · 216 m-1.7% pupils (225)
        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 15 Oct 2026, 02:04
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
        Department of Education school listCC BY 4.027 Sept 2026, 23:32open
        National Planning Application DatabaseCC BY 4.015 Oct 2026, 02:04open
        Council consultation portalsPublic15 Oct 2026, 01:32open
        Council meetings (ModernGov)Public15 Oct 2026, 01:32open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Extension (22664) approved 2023, not started: still planned?
          Ask for: The grant, and whether it stays with the house.
          Seller · solicitor
        2. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Brownstown
        Electoral division
        Culmullin
        Electoral area
        Ratoath
        Council
        Meath County Council
        Everything we found, as a list 8 lines
        • 1 application on this site; latest 22664, approved 2023, not started, runs out 2028.
        • Not protected; no vacant land tax.
        • Nothing nearby looks set to change.
        • No scheduled public transport within 800 m.
        • Inside Dublin Airport Noise Zone D.
        • Here (2022 census): 92% owner-occupied (council 75%); 11% of homes empty (council 6%); most built 1971–1980; 58% drive to work (council 64%); population up 12% since 2016.
        • The council decides in a median 55 days (about 8 weeks); 38% are asked for more information.
        • 7 applications nearby in the last 12 months.
        What the terms mean 5 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 24
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.09 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.014 Oct 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public15 Oct 2026
        www2.courts.ie—© the publisher15 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public15 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.015 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence15 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Sept 2026
        gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 15 Oct 2026, 23:26 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.