Planning report · Meath County Council · 500 m around the house · the last 12 months · 5 Nov 2026, 08:14

Navan Road, Dunboyne, Dunboyne

53.42755, -6.47026

Homes here mostly date from the 1970s. 3 planning files on this house, the latest from 2022. Home extensions nearby almost always get approved (94%). 171 homes approved 343 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 3 planning files on this house, the latest from 2023.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980. 3 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Navan RoadBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2023: 221490 · new house, approved2022: 221452 · new house, withdrawn or invalid2022: 21168 · new house, refused2021: 2 files on Navan Road2022: 3 files on Navan Road2024: 4 files on Navan Road2026: 1 file on Navan Road10 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    221490 · new house · approved 2023 · started, no sign-off needed
    approvedstartedsigned off?
  2. 2022
    221452 · new house · withdrawn
    approved?started?signed off?
  3. 2022
    21168 · new house · refused 2022
    approvedstarted?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

A1 - Existing Residential: Existing Residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

meath county development plan 2021 2027 · 3 Nov 2021 – 2 Nov 2027

ZoningR2 · Existing residential
What it says

A1 - Existing Residential: Existing Residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

meath county development plan 2021 2027 as varied · 3 Nov 2021 – 2 Nov 2027

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Padraig Thornton Waste Disposal Ltd (505 m); licence P1229 (761 m)

Vacant land taxNo not on the map
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Heritage inventory buildings1bridge
Radon grid squares3
Monuments3Pit; R171268
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), OPW flood maps (NIFM), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 82% approved, and 1 in 2 are asked for more information.

Single-storey rear12 decided · more info asked 33%
100% · council 97%
New house in a garden or site11 decided · more info asked 64%
82% · council 75%
Approved nearbyMeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 23 nearby, 2,092 council-wide

Figure 3

Navan Road, file by file since 2021

1 of 1 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 3.

10 planning files on Navan Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2022 · garden room · approved · 221660Porches, roofs, otherNo number · 2021 · other work · approved · 211541No number · 2024 · other work · approved · 2439No number · 2024 · other work · approved · 2460625No number · 2024 · other work · approved · 2460709No number · 2024 · other work · approved · 2460954No number · 2026 · other work · approved · 2660345New house in a side gardenNo number · 2021 · new house · refused · 21168No number · 2022 · new house · approved · 221490No number · 2022 · new house · approved · 22243
ApprovedRefusedWithdrawn or invalid

10 files with "Navan Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 1 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 1 in the last 12 months

  • 2660491 · new house · refused 23 Jun 2026 · 72 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 53 days. 1 in 5 is asked for more information, which adds about 59 days. Building starts about 5 months after permission.

Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 5): 112 days; Appeal window: 4 weeks; Building starts: 150 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 51–54 (n=37)53 daysIf more info asked (1 in 5)With further information: median 112 days (n=10)112 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 150 days after permission (n=20)150 days after permissionSigned off55% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated47 decided home extensions, 20 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 5

What appeals changed

0 of 2 appealed refusals became permissions. 0 of 3 appealed approvals were reversed.

Refusals appealed2 decided
0 became permissions
Approvals appealed3 decided
0 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 2 in the last 12 months
  • 324353 Other · Principally located in Bennetstown (townland) to the west of the R157… · 33 m
  • 324555 Pending · Principally located in Bennetstown (townland) to the south of the M3… · 25 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 4

What's changing around you?

Street map around Navan Road, Dunboyne, Dunboyne with 8 numbered planning items
⌖ the houseOpen for commentsApproved, not startedLarge schemeAppealRefusedBuilding startedNo decision yetApproved
  1. 129 Kilbrena Crescent, Dunboyne 26214No decision yet · 452 m
  2. 2Old Navan Road 2460625Approved, no sign building has started · 343 m
  3. 3Principally located in Bennetstown (townland) to the west of the R157 and North of Kennedy Road and also extending into Pace and Dunboyne (townlands), Dunboyne North 2660001Approved with conditions · 33 m
  4. 4Principally located in Bennetstown (townland) to the south of the M3 Parkway Park and Ride and Rail Station and also extending into Pace & Dunboyne (townlands), Dunboyne North 324555Appeal: no decision yet · 25 m
  5. 5Kennedy Road, Dunboyne 2660491Refused · 72 m
  6. 6Old Navan Road, Dunboyne 24/39Building started · 98 m
  7. 7Old Navan Road, Dunboyne 2660543No decision yet · 17 m
  8. 8Lands at Navan Road, Dunboyne 2660345Approved with conditions · 155 m
Figure 6

What happens to applications within 500 m

Permission isn't building. Of 22 permissions since 2016, 8 show a start notice and 2 have a completion certificate.

26 applications lodged within 500 m. Council: 24 approved, 2 refused. After appeals: 22 approved. Of those: 2 signed off, 2 built with the owner's opt-out, 4 started, 13 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT24: lodged → approved2: lodged → refused22: approved → approved2: refused → refused2 approved by the council, withdrawn or invalid after an appeal13: approved → no start notice found2: approved → built, owner opted out4: approved → started, not signed off2: approved → signed off1: approved → ran out26 lodged26 lodged24 approved24 approved2 refused2 refused22 approved22 approved2 refused2 refused2 withdrawn2 withdrawn13 no start notice found13 no start notice found2 built, owner opted out2 built, owner opted out4 started, not signed off4 started, not signed off2 signed off2 signed off1 ran out1 ran out

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured26 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 7

The next 30 days

2 deadlines within 500 m; the first closes 5 Nov 2026.

2 deadlines in the next 30 days: 2026-11-05 ACP 324353: Contribution Appeal Decided; 2026-11-18 26214: application received — the construction of (1) a single storey extension to the rear of the existing dwelling, (2) a single storey extension totoday10 Nov15 Nov20 Nov25 Nov30 Nov5 DecACP 324353: Contribution Appeal Decided · 33 m away · 2026-11-0526214: application received — the construction of (1) a single storey extension to the rear of the existing dwelling, (2) a single storey extension to · 452 m away · 2026-11-18
Comments closeHigh Court window ends
  • Time to ask the High Court for a review ends 5 Nov 2026closes today
    Contribution Appeal Decided
    33 m away
  • Comments close 18 Nov 202613 days left
    126214 · application received — the construction of (1) a single storey extension to the rear of the existing dwelling, (2) a…
    €20 to the council · 452 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Figure 8

Approved, stalled or planned, not built yet

171 homes 343 m away were approved Mar 2025 with no start notice yet; the permission runs to Mar 2030. DART+ West is planned 198 m away.

Old Navan Road · 171 homes: 171 homes approved Mar 2025, not started; DART+ West, DART+ West:…: railway order granted (July 2024); DART+ West, M3 Parkway: railway order granted (July 2024)20242025202620272028202920302031Old Navan Road · 171 homes343 m · 2460625171 homes approved Mar 2025, not started171 homes approved Mar 2025, not startedDART+ West, DART+ West:…198 m · plannedrailway order granted (July 2024)DART+ West, M3 Parkway848 m · plannedrailway order granted (July 2024)today

Each row is a dated fact from a public register: no score and no forecast.

Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

Sites that could change 1 within 500 m

Approved, not started 1

Not covered here: council land to be sold (Dublin only).

Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Figure 9

Applications within 500 m, by year

Between 3 and 6 a year; busiest 2023. 92% of decisions were approvals.

2021: 4, 2022: 5, 2023: 6, 2024: 6, 2025: 3, 2026: 205102021: 3 approved2021: 1 refused4’21*2022: 5 approved5’222023: 6 approved6’232024: 6 approved6’242025: 3 approved3’252026: 1 approved2026: 1 refused2’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Open for comments €20 to comment

Every application within 500 m 9 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
Building work nearby 1 in the last 12 months
1 not signed off
  • 6Old Navan Road, Dunboyne, Meath · 1 Jul 2026 · 8 homes · start notice not signed off · 24/39 · 98 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
Homes coming 171 not started
How we work this out
Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Crèches and schools inspected

NameLatest inspectionDistance
Kidology Childcare · Crèche14 Oct 2025 · report · Tusla Early Years Inspectorate385 m
The ABC Club · Crèche19 Sept 2024 · report · Tusla Early Years Inspectorate482 m
Small Steps · Crèche31 Jan 2025 · report · Tusla Early Years Inspectorate759 m
Little Scholars Creche · Crèche17 Nov 2025 · report · Tusla Early Years Inspectorate855 m
Little Scholars Creche · Crèche22 Oct 2024 · report · Tusla Early Years Inspectorate855 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Department of Education school list, Tusla early years register · fetched 4 Nov 2026, 23:36
SourceLicenceFetchedLink
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
Tusla early years registerPublic register4 Nov 2026, 23:36open
How busy is this area Busier than most of Meath County Council.
Homes approved
Here2,026
Council middle0
Homes started
Here1,397
Council middle2
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 5

What's the area like?

Figure 10

This street block against the council

43% of homes built before 1971 (council 18%). 92% owner-occupied (council 75%).

Homes built before 1971
43% · council 18%
Homes built since 2001
21% · council 45%
Owner-occupied
92% · council 75%
Rented
3% · council 20%
Children under 15
16% · council 23%
Aged 65 and over
20% · council 12%
Households with 2+ cars
71% · council 54%
Work mainly from home
18% · council 11%
This small area (325 people)Meath

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 167029004

Road noise
60–64 dB
day–night average (EPA 2022) · airport noise zone C
Bus
246 m
Dunboyne College of Further Education · DY01, DY02
Planned
198 m
DART+ West, DART+ West: Clonsilla - M3 Parkway
Radon
1 in 10
homes here likely high (EPA). Test it
Flood
Yes
OPW flood map area within 100 m
Nearest school
884 m
Dunboyne Junior NS, 397 pupils
Schools, stops and the council

Schools

  • Dunboyne Junior NS · primary · 397 pupils · 884 m
  • Dunboyne Senior NS · primary · 470 pupils · 969 m

Stops 6

  • Dunboyne College of Further Education · DY01, DY02 · 246 m
  • Bracetown · 109, 109B · 2/hour at peak · 695 m
  • Bracetown · 109, 109B · 3/hour at peak · 716 m

Schools growing or shrinking planning in 3 years · pupils last year

  • Dunboyne Junior NS · 884 m-5.3% pupils (397)
  • Dunboyne Senior NS · 969 m+3.8% pupils (470)
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Council consultation portalsPublic5 Nov 2026, 01:15open
Council meetings (ModernGov)Public5 Nov 2026, 02:33open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. New house (221490) built without official sign-off: built properly?
    Ask for: An engineer's opinion of compliance.
    Seller · solicitor
  2. New house (21168) refused 2022: built anyway?
    Ask for: The seller's answer and your surveyor's check.
    Seller · solicitor
  3. Flood risk area within 100 m: can you insure it?
    Ask for: A flood-cover quote before sale agreed.
    Insurer
  4. High radon area (1 in 10 homes): has it been tested?
    Ask for: Radon test results.
    Seller
  5. Application 452 m away open for comments until 18 Nov 2026: comment?
    Ask for: The plans on the council's website (€20 to comment).
    Council
  6. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Townland
Dunboyne
Electoral division
Dunboyne
Electoral area
Ratoath
Council
Meath County Council
Everything we found, as a list 8 lines
  • 3 applications on this site; latest 221490, approved 2023, started, no sign-off needed.
  • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m; high radon area.
  • 1 site nearby could change: 1 approved scheme.
  • 1 application open for comments nearby; nearest closes 18 Nov 2026.
  • 1 application refused within 100 m since 2025; latest a new house (2026).
  • 171 homes approved nearby, not started; largest 171 at Old Navan Road.
  • No morning-peak service within 500 m; nearest is Bracetown, 695 m away (2 an hour). Planned: DART+ West 198 m away, railway order granted (July 2024).
  • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022); inside Dublin Airport Noise Zone C.
What the terms mean 7 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 31
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
www2.courts.ie—© the publisher4 Nov 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
esbnetworks.ie—© the publisher · flag only11 Sept 2026
transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
gov.ieDepartment of EducationCC BY 4.027 Oct 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 5 Nov 2026, 08:14 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.