Planning report · Fingal County Council · 500 m around the house · the last 12 months · 28 Oct 2026, 17:01

Island View, Malahide

53.44879, -6.14062

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (92%). A building site 168 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Island ViewBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2022: 1 file on Island View2023: 1 file on Island View2024: 3 files on Island View5 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Malahide (970 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Conservation areas1Malahide Historic Core ACA
Natural heritage areas1Malahide Estuary
Heritage inventory buildings2Moldowney House; Hicks Tower
Radon grid squares3
Protected buildings2Hicks Tower; Muldowney House
EU nature sites1Malahide Estuary SAC
Monuments2Martello tower; R183052
EU bird sites1Malahide Estuary SPA
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, OPW flood maps (CFRAM), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Records of Protected Structures, Special Areas of Conservation (NPWS), Sites and Monuments Record, Special Protection Areas (NPWS) · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Special Areas of Conservation (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Special Protection Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 73–94% by type. A new house in a garden is harder: 58% approved, and 1 in 3 is asked for more information.

Single-storey rear35 decided · more info asked 6%
94% · council 92%
Attic or dormer53 decided · more info asked 8%
91% · council 92%
First-floor11 decided · more info asked 18%
73% · council 86%
New house in a garden or site24 decided · more info asked 29%
58% · council 53%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 123 nearby, 2,310 council-wide

Figure 3

Island View, file by file since 2022

3 of 3 decided extensions on the road were approved.

5 planning files on Island View since 2022, by kind and decision.20222023202420252026Extensions, atticsNo. 1 · 2022 · other extension · approved · F22A/0634No. 54 · 2024 · attic conversion / dormer · withdrawn or invalid · F24A/0698No. 54 · 2024 · attic conversion / dormer · approved · F24A/0908ENo. 28 · 2024 · attic conversion / dormer · approved · F24A/1093EPorches, roofs, otherNo. 1 · 2023 · other work · approved · F23A/0310New house in a side garden
ApprovedRefusedWithdrawn or invalid

5 files with "Island View" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

1 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Porch21—

On Island View: 4 extensions in 10 years; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 50 days. 1 in 9 is asked for more information, which adds about 83 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 9): 160 days; Appeal window: 4 weeks; If appealed: +131 days; Building starts: 107 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 46–54 (n=162)50 daysIf more info asked (1 in 9)With further information: median 160 days (n=9)160 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 131 days (n=36, all appeals within 1.5 km)+131 daysBuilding startsStart notice: median 107 days after permission (n=81)107 days after permissionSigned off44% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated182 decided home extensions, 82 start notices, 36 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    8 of 13 appealed refusals became permissions. 0 of 26 appealed approvals were reversed.

    Refusals appealed13 decided
    8 became permissions
    Approvals appealed26 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Island View, Malahide with 10 numbered planning items
    ⌖ the houseBuilding site that stoppedBuilding startedNo decision yetApproved
    1. 1Coast Road, Malahide F22A/0644Building site that stopped · 168 m
    2. 228 Island View, Malahide F24A/1093EBuilding started · 65 m
    3. 3Lismoyle, Coast Road F26A/0697ENo decision yet · 142 m
    4. 4156 Seapark, Malahide F26A/0222EApproved · 241 m
    5. 5220 Seapark, Malahide F26A/0201EApproved · 277 m
    6. 693 Biscayne, Malahide F26A/0109EApproved · 388 m
    7. 75 Marley, Grove Road F26A/0310EApproved · 389 m
    8. 8The Grand Hotel, Grove Road F26A/0611EApproved · 404 m
    9. 9Hazelwood, Grove Road F26A/0036EApproved with conditions · 487 m
    10. 10No 17 The View, Robswall F25A/1130Approved · 495 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 57 permissions since 2016, 26 show a start notice and 1 has a completion certificate.

    71 applications lodged within 500 m. Council: 57 approved, 4 refused. After appeals: 57 approved. Of those: 1 signed off, 11 built with the owner's opt-out, 14 started, 31 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT57: lodged → approved4: lodged → refused9: lodged → withdrawn or invalid1: lodged → undecided57: approved → approved4: refused → refused9: withdrawn or invalid → withdrawn1: undecided → undecided31: approved → no start notice found11: approved → built, owner opted out14: approved → started, not signed off1: approved → signed off71 lodged71 lodged57 approved57 approved4 refused4 refused9 withdrawn or invalid9 withdrawn or invalid1 undecided1 undecided57 approved57 approved4 refused4 refused9 withdrawn9 withdrawn1 undecided1 undecided31 no start notice found31 no start notice found11 built, owner opted out11 built, owner opted out14 started, not signed off14 started, not signed off1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured71 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      1 building site nearby stopped before sign-off.

      Coast Road, Malahide · 10 homes: 10 homes, started Feb 2023, never signed off202320242025202620272028Coast Road, Malahide · 10 homes168 m · F22A/064410 homes, started Feb 2023, never signed off10 homes, started Feb 2023, never signed offtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 1 within 500 m

      Building site that stopped 1

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 28 Oct 2026, 04:50
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public28 Oct 2026, 02:10open
      National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 9

      Applications within 500 m, by year

      Between 9 and 16 a year; busiest 2024. 93% of decisions were approvals.

      2021: 12, 2022: 9, 2023: 11, 2024: 16, 2025: 13, 2026: 10051015202021: 11 approved2021: 1 refused12’21*2022: 6 approved2022: 2 refused2022: 1 withdrawn or invalid9’222023: 10 approved2023: 1 withdrawn or invalid11’232024: 12 approved2024: 1 refused2024: 3 withdrawn or invalid16’242025: 12 approved2025: 1 withdrawn or invalid13’252026: 6 approved2026: 3 withdrawn or invalid2026: 1 undecided10’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 13 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 28 Oct 2026, 04:50
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
      Building work nearby 8 in the last 12 months
      1 not signed off7 no sign-off needed
      • 28 Abbotts Hill, Malahide, Dublin, K36 AP97 · 3 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · F25A/0900E · 455 m
      • 228 Island View, Malahide, Dublin, K36 AX20 · 13 Jul 2026 · short notice no sign-off needed · F24A/1093E · 65 m
      • 93 Biscayne, Malahide, Dublin, K36 TX89 · 6 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · F26A/0109E · 400 m
      • 35 The Walk, Malahide, Dublin, K36 T862 · 4 Jun 2026 · start notice, opted out no sign-off needed · F25A/0158E · 476 m
      • 61 Coast Road, Malahide, Fingal, K36RH63 · 29 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · F25A0624E · 214 m
      • 41 Seapark, Malahide, Fingal, K36 X778 · 23 Apr 2026 · short notice no sign-off needed · F25A/0441E · 210 m
      • 155 Biscayne, Malahide, Fingal · 16 Apr 2026 · 1 homes · start notice not signed off · F25A/0554E · 402 m
      • 52 The Moorings, Malahide, Fingal, K36 XD62 · 25 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · F25A/0265E · 128 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 28 Oct 2026, 02:21
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
      Homes coming 0 not started
      • Fingerpost, Malahide, Co. Dubl;in · Stage 4 tender approval · 4 homes · 472 m
      • St. Benedicts, Estuary Road, Malahide, Co. Dublin · Stage 1 capital appraisal · 8 homes · 472 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 28 Oct 2026, 04:50
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
      National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Island View · 5 applications in 10 years · most common: attic conversion / dormer

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Seamount Road and Seamount Abbey——592 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Absolute Angels · Crèche9 May 2025 · report · Tusla Early Years Inspectorate606 m
      The Village Montessori · Crèche18 Jun 2025 · report · Tusla Early Years Inspectorate735 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 04:50
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
      National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register21 Oct 2026, 23:37open
      How busy is this area Busier than most of Fingal County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here43
      Council middle3
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
      National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      97% owner-occupied (council 67%).

      Homes built before 1971
      8% · council 11%
      Homes built since 2001
      0% · council 43%
      Owner-occupied
      97% · council 67%
      Rented
      3% · council 28%
      Children under 15
      19% · council 22%
      Aged 65 and over
      37% · council 11%
      Households with 2+ cars
      50% · council 42%
      Work mainly from home
      26% · council 12%
      This small area (238 people)Fingal

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267105006

      Bus
      89 m
      Seapark · 102, 102A, 102C · busiest stop within 500 m: 6 an hour at peak
      Radon
      1 in 10
      homes here likely high (EPA). Test it
      Flood
      Within 500 m
      OPW flood map area, not beside the house
      Nearest school
      712 m
      St Oliver Plunkett, 838 pupils
      Homes sold nearby
      24
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • St Oliver Plunkett · primary · 838 pupils · 712 m
      • St Andrews NS · primary · 207 pupils · 820 m

      Stops 19

      • Seapark · 102, 102A, 102C, 102P, 102T, 32X · 4/hour at peak · 89 m
      • Seapark · 102, 102C, 102P, 102T, 32X, 42n · 6/hour at peak · 125 m
      • Malahide Beach · 102, 102C, 102P, 102T, 42n, H2 · 6/hour at peak · 217 m
      • Malahide Beach · 102, 32X, H2 · 4/hour at peak · 290 m
      • The Old Golf Lnks · 102, 102A, 102C, 102P, 102T, 32X · 4/hour at peak · 294 m
      • The Old Golf Lnks · 102, 102C, 102P, 102T, 32X, 42n · 6/hour at peak · 396 m
      • Biscayne Estate · 102, 102A, 102C, 102P, 102T, 32X · 4/hour at peak · 498 m
      • Biscayne Estate · 102, 102C, 102P, 102T, 32X, 42n · 6/hour at peak · 627 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Oliver Plunkett · 712 m-3.6% pupils (838)
      • St Andrews NS · 820 m0% pupils (207)

      Open consultations

      Council meetings 30 items

      Public land

      • Dublin City Council · 0.38 ha · 148 m
      • Fingal County Council · 3.18 ha · 256 m
      • Dublin City Council · 0.75 ha · 384 m
      • Fingal County Council · 0.15 ha · 444 m
      • Fingal County Council · 0.15 ha · 465 m
      • Fingal County Council · 2.94 ha · 469 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 28 Oct 2026, 04:50
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
      Council consultation portalsPublic28 Oct 2026, 00:59open
      Council meetings (ModernGov)Public28 Oct 2026, 02:10open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. High radon area (1 in 10 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      2. Stalled build 168 m away (Coast Road, Malahide): what happens next?
        Ask for: The planning file for F22A/0644.
        Council
      3. Building work started 64 m away: for how long?
        Ask for: The planning conditions for F24A/1093E.
        Agent · council
      4. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Malahide
      Electoral division
      Malahide East
      Electoral area
      Howth-Malahide
      Council
      Fingal County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
      • 1 site nearby could change: 1 stalled build.
      • Seapark (bus 102, 102C) 125 m away: 6 an hour at morning peak; 32 from all stops within 500 m.
      • Inside Dublin Airport Noise Zone C.
      • Here (2022 census): 97% owner-occupied (council 67%); 3% of homes empty (council 5%); most built 1971–1980; 51% drive to work (council 52%); population up 13% since 2016.
      • 2 home extensions within 250 m since 2026. Most were porches.
      • Around here the council decides in a median 55 days (about 8 weeks); 1 in 5 is asked for more information.
      • Homes started within 1 km: 10 in the last year, 22 three years before.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
      Sources and licences 37
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.028 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public28 Oct 2026
      www2.courts.ie—© the publisher27 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public28 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.028 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence28 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 28 Oct 2026, 17:01 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.