PlanningRegister.ie
Planning report · Fingal County Council · 500 m around the house · the last 12 months · 4 Nov 2026, 23:33

The Rise

53.44994, -6.15028

Homes here mostly date from the 1950s. 3 planning files on this house, the latest from 2025. Home extensions nearby almost always get approved (92%). 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed. 3 planning files on this house, the latest from 2025.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960. 3 planning files on this house.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of The RiseBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2025: F25A/0005E · work already done, refused2024: F24A/1144E · work already done, withdrawn or invalid2022: F21A/0687 · demolition, approved2021: 5 files on The Rise2022: 1 file on The Rise2023: 1 file on The Rise2024: 6 files on The Rise2025: 5 files on The Rise2026: 2 files on The Rise20 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    F25A/0005E · work already done · refused 2025
    approvedstartedsigned off?
  2. 2024
    F24A/1144E · work already done · withdrawn
    approved?startedsigned off?
  3. 2022
    F21A/0687 · demolition · approved 2022 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
Yes
Protected or listed · in a conservation area (Malahide - The Rise ACA)
No
Vacant land tax · lived-in homes don't pay it
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Conservation areaOn this site Malahide - The Rise ACA
Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Malahide (351 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Conservation areas3Malahide Castle Demesne ACA; Malahide Historic Core ACA
Natural heritage areas1Malahide Estuary
Heritage inventory buildings27house; Malahide Carnegie Free Library
Radon grid squares3
Protected buildings48Milestone; Former Station Master's House
EU nature sites1Malahide Estuary SAC
Monuments4Ritual site - holy well; Church
EU bird sites1Malahide Estuary SPA
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 2 on the draft 2027 map; 2 on the final 2026 map.
Sources: Development plan zoning (councils), Architectural Conservation Areas, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Records of Protected Structures, Special Areas of Conservation (NPWS), Sites and Monuments Record, Special Protection Areas (NPWS) · fetched 2 Nov 2026, 23:44
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.02 Nov 2026, 23:44open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Special Areas of Conservation (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Special Protection Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 4 Nov 2026, 23:01
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
National Planning Application DatabaseCC BY 4.04 Nov 2026, 23:01open
Question 2

Could you extend?

This site is in a conservation area: changes visible from the street usually need permission.

Figure 2

What happened to applications like yours

Extensions here: 69–100% by type. A new house in a garden is harder: 66% approved, and 1 in 3 is asked for more information.

Single-storey rear41 decided · more info asked 7%
93% · council 92%
Single-storey side11 decided · more info asked 0%
100% · council 93%
Attic or dormer59 decided · more info asked 5%
92% · council 92%
First-floor13 decided · more info asked 15%
69% · council 86%
New house in a garden or site29 decided · more info asked 38%
66% · council 53%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 153 nearby, 2,462 council-wide

Figure 3

The Rise, file by file since 2021

8 of 9 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

20 planning files on The Rise since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 37 · 2021 · side · approved · F21A/0048No. 18 · 2021 · single-storey rear · refused · F21A/0571No. 13 · 2021 · single-storey side · approved · F21A/0577No. 4 · 2021 · single-storey rear · approved · F21A/0687No. 18 · 2022 · two-storey rear · approved · F22A/0245No. 3 · 2024 · first-floor · approved · F24A/0860ENo. 35 · 2024 · other extension · approved · F24A/1013ENo. 35 · 2025 · attic conversion / dormer · approved · F25A/0075ENo. 40 · 2026 · porch / front · approved · F26A/0126EPorches, roofs, otherNo. 13 · 2021 · other work · approved · F20A/0613No. 18 · 2023 · other work · withdrawn or invalid · F23A/0714No. 18 · 2024 · other work · approved · F24A/0963ENo. 4 · 2024 · other work · withdrawn or invalid · F24A/1144ENo. 4 · 2025 · other work · refused · F25A/0005ENo. 40 · 2025 · other work · withdrawn or invalid · F25A/0919ENo. 40 · 2025 · other work · approved · F25A/0960ENo. 3 · 2025 · other work · approved · F25A/0971ENo. 13 · 2026 · single-storey side · approved · F26A/0157ENew house in a side gardenNo. 15 · 2024 · new house · approved · F23A/067915No. 1 · 2024 · new house · approved · F24A/0299
ApprovedRefusedWithdrawn or invalid

20 files with "The Rise" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

2 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Garden room10—
Single-storey rear11—
Single-storey side11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 4 Nov 2026, 23:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 23:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 4 Nov 2026, 23:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 23:01open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 50 days. 1 in 9 is asked for more information, which adds about 80 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 9): 160 days; Appeal window: 4 weeks; If appealed: +131 days; Building starts: 110 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 46–54 (n=184)50 daysIf more info asked (1 in 9)With further information: median 160 days (n=9)160 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 131 days (n=41, all appeals within 1.5 km)+131 daysBuilding startsStart notice: median 110 days after permission (n=96)110 days after permissionSigned off52% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated207 decided home extensions, 97 start notices, 41 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    10 of 17 appealed refusals became permissions. 0 of 28 appealed approvals were reversed.

    Refusals appealed17 decided
    10 became permissions
    Approvals appealed28 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 501728 Withdrawn · 6 Old Street, Malahide, Co. Dublin, K36 H564 · 308 m
    • 324119 Granted with conditions · Unit 7 New Street Mall, Malahide Co Dublin · 300 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 4 Nov 2026, 23:17
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 23:01open
    Question 4

    What's changing around you?

    Street map around The Rise with 15 numbered planning items
    ⌖ the houseOpen for commentsApprovedNo decision yetRefused
    1. 1Malahide Lawn Tennis & Croquet Club, The Square F26A/0925ENo decision yet · 117 m
    2. 219 and 19A Old Street, Malahide F26A/0916ENo decision yet · 385 m
    3. 313 The Rise, Malahide F26A/0157EApproved · 65 m
    4. 4Hazelwood, Grove Road F26A/0036EApproved with conditions · 111 m
    5. 5The Grand Hotel, Grove Road F26A/0611EApproved · 113 m
    6. 6The Chalet, Grove Road F26A/0027ENo decision yet · 167 m
    7. 7Kilronan House, Church Road F26A/0527ENo decision yet · 184 m
    8. 83 Carlisle Terrace, Church Road F26A/0662ENo decision yet · 217 m
    9. 9No. 12 James’ Terrace, Malahide F26A/0435EApproved · 229 m
    10. 101 Townyard Lane, Malahide F26A/0235Refused · 230 m
    11. 11No. 7 Carlisle Terrace, Church Road F26A/0339EApproved · 231 m
    12. 12Ardfert, Church Road F26A/0564EApproved · 244 m
    13. 13Sienna's Restaurant, 9 Marine Court F26A/0212No decision yet · 248 m
    14. 1440 The Rise, Malahide F26A/0126EApproved · 250 m
    15. 1512/13 Townyard Lane, Malahide F26A/0132EApproved with conditions · 257 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 113 permissions since 2016, 46 show a start notice and 5 have a completion certificate.

    172 applications lodged within 500 m. Council: 111 approved, 24 refused. After appeals: 113 approved. Of those: 5 signed off, 20 built with the owner's opt-out, 21 started, 66 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT111: lodged → approved24: lodged → refused27: lodged → withdrawn or invalid10: lodged → undecided108: approved → approved18: refused → refused27: withdrawn or invalid → withdrawn10: undecided → undecided3 approved by the council, withdrawn or invalid after an appeal5 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal66: approved → no start notice found20: approved → built, owner opted out21: approved → started, not signed off5: approved → signed off1: approved → ran out172 lodged172 lodged111 approved111 approved24 refused24 refused27 withdrawn or invalid27 withdrawn or invalid10 undecided10 undecided113 approved113 approved18 refused18 refused31 withdrawn31 withdrawn10 undecided10 undecided66 no start notice found66 no start notice found20 built, owner opted out20 built, owner opted out21 started, not signed off21 started, not signed off5 signed off5 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured172 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 16 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-16 F26A/0916E: application received — The development will consist of a ground floor extension (31m2) to the rear of the property including a new access stair; 2026-11-19 F26A/0925E: application received — Planning Permission for a five year period to park and use a food/coffee truck (internal floor area of c. 6 sqm) to servtoday9 Nov14 Nov19 Nov24 Nov29 Nov4 DecF26A/0916E: application received — The development will consist of a ground floor extension (31m2) to the rear of the property including a new access stair · 385 m away · 2026-11-16F26A/0925E: application received — Planning Permission for a five year period to park and use a food/coffee truck (internal floor area of c. 6 sqm) to serv · 117 m away · 2026-11-19
    Comments close
    • Comments close 16 Nov 202612 days left
      2F26A/0916E · application received — The development will consist of a ground floor extension (31m2) to the rear of the property…
      €20 to the council · 385 m away
    • Comments close 19 Nov 202615 days left
      1F26A/0925E · application received — Planning Permission for a five year period to park and use a food/coffee truck (internal floor…
      €20 to the council · 117 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    DART+ Coastal North is planned 408 m away.

    DART+ Coastal North, Malahide: railway order approved (An Coimisiún Pleanála; applied July 2024); DART+ Coastal North, DART+…: railway order approved (An Coimisiún Pleanála; applied July 2024)20242025202620272028DART+ Coastal North, Malahide408 m · plannedrailway order approved (An Coimisiún Pleanála; applied July 2024)DART+ Coastal North, DART+…430 m · plannedrailway order approved (An Coimisiún Pleanála; applied July 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Figure 9

    Applications within 500 m, by year

    Between 16 and 36 a year; busiest 2025. 82% of decisions were approvals.

    2021: 35, 2022: 16, 2023: 18, 2024: 33, 2025: 36, 2026: 340102030402021: 28 approved2021: 6 refused2021: 1 withdrawn or invalid35’21*2022: 12 approved2022: 1 refused2022: 3 withdrawn or invalid16’222023: 13 approved2023: 2 refused2023: 3 withdrawn or invalid18’232024: 23 approved2024: 4 refused2024: 6 withdrawn or invalid33’242025: 20 approved2025: 8 refused2025: 8 withdrawn or invalid36’252026: 15 approved2026: 3 refused2026: 6 withdrawn or invalid2026: 10 undecided34’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 37 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 4 Nov 2026, 23:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 23:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
    Building work nearby 6 in the last 12 months
    2 not signed off4 no sign-off needed
    • 40 The Rise, Malahide, Dublin, K36 YF85 · 16 Oct 2026 · 1 homes · start notice not signed off · F26A/0126E · 257 m
    • Church Road, Malahide, Dublin, K36 KX70 · 5 Jun 2026 · short notice no sign-off needed · F25A/0636E · 218 m
    • Church Road, Malahide, Dublin, K36 KX70 · 3 Jun 2026 · short notice no sign-off needed · F25A/0636E · 218 m
    • Grove Road, Malahide, Fingal · 30 Apr 2026 · 1 homes · start notice not signed off · F25A/0119E · 70 m
    • 41 Seapark, Malahide, Fingal, K36 X778 · 23 Apr 2026 · short notice no sign-off needed · F25A/0441E · 480 m
    • 3 The Rise, Malahide, Fingal, K36 KW53 · 19 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · F25A/0971E · 67 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 4 Nov 2026, 03:43
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
    Homes coming 0 not started
    • Fingerpost, Malahide, Co. Dubl;in · Stage 4 tender approval · 4 homes · 334 m
    • St. Benedicts, Estuary Road, Malahide, Co. Dublin · Stage 1 capital appraisal · 8 homes · 334 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 4 Nov 2026, 23:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 23:01open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Seamount Road and Seamount Abbey——542 m

    Who applies most nearby

    Crèches and schools inspected

    NameLatest inspectionDistance
    The Village Montessori · Crèche18 Jun 2025 · report · Tusla Early Years Inspectorate193 m
    Absolute Angels · Crèche9 May 2025 · report · Tusla Early Years Inspectorate343 m
    Little Crickets Preschool · Crèche25 Feb 2026 · report · Tusla Early Years Inspectorate731 m
    Malahide Marina Creche & Montessori · Crèche30 Jan 2026 · report · Tusla Early Years Inspectorate747 m
    Beverton PreSchool & Afterschool · Crèche21 Nov 2024 · report · Tusla Early Years Inspectorate921 m
    Purple Turtle Montessori · Crèche24 Jan 2024 · report · Tusla Early Years Inspectorate981 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 4 Nov 2026, 23:01
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.02 Nov 2026, 23:01open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 23:01open
    Applicant organisations (from the CRO)Derived by Planning Register1 Nov 2026, 23:02—
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Fingal County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here72
    Council middle3
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 4 Nov 2026, 23:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.04 Nov 2026, 03:43open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 23:01open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    54% of homes built before 1971 (council 11%). 85% owner-occupied (council 67%).

    Homes built before 1971
    54% · council 11%
    Homes built since 2001
    10% · council 43%
    Owner-occupied
    85% · council 67%
    Rented
    8% · council 28%
    Children under 15
    15% · council 22%
    Aged 65 and over
    31% · council 11%
    Households with 2+ cars
    58% · council 42%
    Work mainly from home
    26% · council 12%
    This small area (303 people)Fingal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267105019

    Bus
    119 m
    Malahide Village · 102, 102C, 102P · busiest stop within 500 m: 7 an hour at peak
    Planned
    408 m
    DART+ Coastal North, Malahide
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    212 m
    St Andrews NS, 207 pupils
    Homes sold nearby
    47
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • St Andrews NS · primary · 207 pupils · 212 m
    • St Oliver Plunkett · primary · 838 pupils · 330 m
    • Sn N Sailbheastar Nfa · primary · 365 pupils · 873 m

    Stops 22

    • Malahide Village · 102, 102C, 102P, 102T, 42n, H2 · 6/hour at peak · 119 m
    • St James's Terrace · H2 · 2/hour at peak · 168 m
    • Malahide Village · 102, 102A, 102C, 102P, 102T, 32X · 2/hour at peak · 184 m
    • St Andrew's Church · 142, 42, 42D · 5/hour at peak · 261 m
    • St Andrew's Church · 142, 42, 42D · 3/hour at peak · 316 m
    • Malahide Stn · 102, 102C, 102P, 102T, 142, 32X · 7/hour at peak · 322 m
    • Malahide Stn · 102, 102A, 102C, 102P, 102T, 142 · 7/hour at peak · 327 m
    • The Old Golf Lnks · 102, 102C, 102P, 102T, 32X, 42n · 6/hour at peak · 368 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Andrews NS · 212 m0% pupils (207)
    • St Oliver Plunkett · 330 m-3.6% pupils (838)
    • Sn N Sailbheastar Nfa · 873 m-2.9% pupils (365)

    Council meetings 30 items

    Public land

    • Fingal County Council · 0.13 ha · 131 m
    • Dublin City Council · 0.11 ha · 317 m
    • Dublin City Council · 0.38 ha · 426 m
    • Fingal County Council · 0.44 ha · 441 m
    • Fingal County Council · 0.33 ha · 494 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Nov 2026, 23:01
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.04 Nov 2026, 23:01open
    Council consultation portalsPublic4 Nov 2026, 01:13open
    Council meetings (ModernGov)Public4 Nov 2026, 02:32open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Keeping work already done was refused (F25A/0005E, 2025): was it removed?
      Ask for: Proof it was removed, or a later grant.
      Seller · solicitor
    2. Demolition (F21A/0687) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    3. In a conservation area: which outside changes need permission?
      Ask for: The council's guidance for the area.
      Council
    4. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    5. Application 117 m away open for comments until 19 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Malahide
    Electoral division
    Malahide East
    Electoral area
    Howth-Malahide
    Council
    Fingal County Council
    Everything we found, as a list 8 lines
    • 3 applications on this site; latest F25A/0005E, refused 2025.
    • Zoned R2 (existing residential); in a conservation area; no vacant land tax; high radon area.
    • Nothing nearby looks set to change.
    • 2 applications open for comments nearby; nearest closes 19 Nov 2026.
    • Malahide (train DART, Dublin - Drogheda/Dundalk) 408 m away: 7 an hour at morning peak; 49 from all stops within 500 m. Planned: DART+ Coastal North Malahide 408 m away, railway order approved (An Coimisiún Pleanála; applied July 2024).
    • Inside Dublin Airport Noise Zone C.
    • Here (2022 census): 85% owner-occupied (council 67%); 10% of homes empty (council 5%); most built 1946–1960; 48% drive to work (council 52%); population up 13% since 2016.
    • 3 home extensions within 250 m since 2026.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Conservation area (Architectural Conservation Area (ACA)): A street or area whose character is protected.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 37
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.04 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public4 Nov 2026
    www2.courts.ie—© the publisher4 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.02 Nov 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.02 Nov 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public4 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.04 Nov 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register1 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence4 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 4 Nov 2026, 23:33 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.