Planning report · Roscommon County Council · 1000 m around the house · the last 12 months · 2 Nov 2026, 18:49

Ballynamona ED, Athlone Municipal District, County Roscommon, Connacht, Éire / Ireland

53.45184, -8.08994

Homes here mostly date from the 2000s. 3 planning files on this house, the latest from 2021. 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Roscommon County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 3 planning files on this house, the latest from 2021.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 3 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BrideswellBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 21507 · signage, approved2021: 21489 · signage, withdrawn or invalid2021: 21437 · signage, withdrawn or invalid2021: 3 files on Brideswell2022: 2 files on Brideswell2023: 4 files on Brideswell2024: 1 file on Brideswell2025: 1 file on Brideswell2026: 1 file on Brideswell12 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    21507 · signage · approved 2021 · started, not signed off
    approvedstartedsigned off
  2. 2021
    21489 · signage · withdrawn
    approved?started?signed off?
  3. 2021
    21437 · signage · withdrawn
    approved?started?signed off?
On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 1.0 km
Within 1.0 kmCountFor example
Monuments20R161437; R161446
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 2 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.02 Nov 2026, 03:19open
National Planning Application DatabaseCC BY 4.02 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

Brideswell, file by file since 2021

3 of 3 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

12 planning files on Brideswell since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · other extension · approved · 21436No number · 2022 · rear · approved · 22464No number · 2023 · other extension · approved · 2360162Porches, roofs, otherNo number · 2021 · other work · approved · 21507No number · 2022 · other work · approved · 22545No number · 2023 · other work · approved · 23180No number · 2023 · other work · approved · 23308No number · 2023 · other work · approved · 2360058No number · 2025 · other work · approved · 2560037No. 1 · 2026 · other work · approved · 2660342New house in a side gardenNo number · 2021 · new house · approved · 21465No number · 2024 · new house · approved · 2460100
ApprovedRefusedWithdrawn or invalid

12 files with "Brideswell" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 2 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.02 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 2 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.02 Nov 2026, 03:19open
    National Planning Application DatabaseCC BY 4.02 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Question 4

    What's changing around you?

    Street map around Ballynamona ED, Athlone Municipal District, County Roscommon, Connacht, Éire / Ireland with 2 numbered planning items
    ⌖ the houseOpen for commentsApproved
    1. 1Brideswell, Athlone 2674No decision yet · 599 m
    2. 2Number 1 Muire na Gael, Brideswell Townland 2660342Approved with conditions · 80 m
    Figure 3

    What happens to applications within 500 m

    Permission isn't building. Of 12 permissions since 2016, 3 show a start notice and 0 have a completion certificate.

    12 applications lodged within 500 m. Council: 12 approved, 0 refused. After appeals: 12 approved. Of those: 0 signed off, 1 built with the owner's opt-out, 2 started, 9 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT12: lodged → approved12: approved → approved9: approved → no start notice found1: approved → built, owner opted out2: approved → started, not signed off12 lodged12 lodged12 approved12 approved12 approved12 approved9 no start notice found9 no start notice found1 built, owner opted out1 built, owner opted out2 started, not signed off2 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured12 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 4

    The next 30 days

    1 deadline within 1.0 km; the first closes 12 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-12 2674: application received — Permission for the construction of two slatted tanks in existing shed structure and construction of a four bay machinerytoday7 Nov12 Nov17 Nov22 Nov27 Nov2 Dec2674: application received — Permission for the construction of two slatted tanks in existing shed structure and construction of a four bay machinery · 599 m away · 2026-11-12
    Comments close
    • Comments close 12 Nov 202610 days left
      12674 · application received — Permission for the construction of two slatted tanks in existing shed structure and construction…
      €20 to the council · 599 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 5

    Applications within 500 m, by year

    Between 1 and 4 a year; busiest 2023. 100% of decisions were approvals.

    2021: 3, 2022: 2, 2023: 4, 2024: 1, 2025: 1, 2026: 105102021: 3 approved3’21*2022: 2 approved2’222023: 4 approved4’232024: 1 approved1’242025: 1 approved1’252026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1Brideswell , Athlone , Co. Roscommon. comments close 12 Nov 2026
      Permission for the construction of two slatted tanks in existing shed structure and construction of a four…
      26749 Oct 2026599 m
    Every application within 1.0 km 3 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 2 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.02 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.02 Nov 2026, 03:19open
    Building work nearby 1 in the last 12 months
    1 no sign-off needed
    • Eskerbane Townland, Brideswell, Eskerbane, Roscommon, N37 KR53 · 30 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · 2560345 · 732 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 2 Nov 2026, 03:19
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.02 Nov 2026, 03:19open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Cam Childcare Ltd · Crèche25 Sept 2025 · report · Tusla Early Years Inspectorateapprox. 71 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area About as busy as most of Roscommon County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here4
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 2 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.02 Nov 2026, 03:19open
    National Planning Application DatabaseCC BY 4.02 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 6

    This street block against the council

    87% owner-occupied (council 74%).

    Homes built before 1971
    24% · council 29%
    Homes built since 2001
    35% · council 37%
    Owner-occupied
    87% · council 74%
    Rented
    10% · council 20%
    Children under 15
    20% · council 20%
    Aged 65 and over
    25% · council 19%
    Households with 2+ cars
    60% · council 47%
    Work mainly from home
    7% · council 9%
    This small area (278 people)Roscommon

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 197018001

    Nearest school
    143 m
    Brideswell NS, 68 pupils
    Schools, stops and the council

    Schools

    • Brideswell NS · primary · 68 pupils · 143 m

    Stops 0

      Schools growing or shrinking planning in 3 years · pupils last year

      • Brideswell NS · 143 m+7.9% pupils (68)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 2 Nov 2026, 05:03
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.02 Nov 2026, 05:03open
      Council consultation portalsPublic2 Nov 2026, 01:11open
      Council meetings (ModernGov)Public2 Nov 2026, 02:27open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Signage (21507) started Mar 2022, never signed off: is it finished?
        Ask for: The completion certificate, or an engineer's opinion of compliance.
        Seller · solicitor
      2. Application 599 m away open for comments until 12 Nov 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Brideswell
      Electoral division
      Ballynamona
      Electoral area
      Athlone
      Council
      Roscommon County Council
      Everything we found, as a list 8 lines
      • 1 job on this site started but never signed off as finished.
      • Not protected; no vacant land tax.
      • Nothing nearby looks set to change.
      • 1 application open for comments nearby; nearest closes 12 Nov 2026.
      • No scheduled public transport within 800 m.
      • Here (2022 census): 87% owner-occupied (council 74%); 15% of homes empty (council 17%); most built 2001–2010; 76% drive to work (council 67%); population up 8% since 2016.
      • The council decides in a median 98 days (about 14 weeks); 57% are asked for more information.
      • 3 applications nearby in the last 12 months.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 25
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.02 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public2 Nov 2026
      www2.courts.ie—© the publisher1 Nov 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public2 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.02 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence2 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 2 Nov 2026, 18:49 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.