PlanningRegister.ie
Planning report · Fingal County Council · 500 m around the house · the last 12 months · 18 Oct 2026, 20:06

Beverton Meadows

53.48994, -6.15890

Homes here mostly date from the 2000s. 1 planning file on this house, the latest from 2014. Home extensions nearby almost always get approved (97%). A building site 386 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 1 planning file on this house, the latest from 2014.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Beverton MeadowsBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2014: F14B/0126 · attic or dormer, approved2014: 1 file on Beverton Meadows2015: 1 file on Beverton Meadows2016: 1 file on Beverton Meadows2017: 1 file on Beverton Meadows2019: 2 files on Beverton Meadows2022: 1 file on Beverton Meadows7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2014
    F14B/0126 · attic or dormer · approved 2014 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas1Donabate - Newbridge House Demesne & The Square ACA
Heritage inventory buildings1Saint Jude's or The Old Vicarage
Radon grid squares1
Protected buildings2Vernacular House; The Old Vicarage
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 16 on the draft 2027 map; 15 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, National Inventory of Architectural Heritage, Records of Protected Structures · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 95–100% by type. A new house in a garden is harder: 77% approved, and 1 in 3 is asked for more information.

Single-storey rear21 decided · more info asked 10%
100% · council 94%
Attic or dormer65 decided · more info asked 12%
95% · council 90%
New house in a garden or site13 decided · more info asked 38%
77% · council 60%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 99 nearby, 3,662 council-wide

Figure 3

Beverton Meadows, file by file since 2014

6 of 6 decided extensions on the road were approved.

7 planning files on Beverton Meadows since 2014, by kind and decision.2014201520162017201820192020202120222023202420252026Extensions, atticsNo. 9 · 2014 · attic conversion / dormer · approved · F14B/0126No. 17 · 2015 · attic conversion / dormer · approved · F15B/0079No. 16 · 2016 · attic conversion / dormer · approved · F16A/0394No. 16 · 2017 · attic conversion / dormer · approved · F17A/0717No. 33 · 2019 · attic conversion / dormer · withdrawn or invalid · F19B/0197No. 33 · 2019 · attic conversion / dormer · approved · F19B/0201No. 15 · 2022 · attic conversion / dormer · approved · F22B/0081Porches, roofs, otherNew house in a side garden
ApprovedRefusedWithdrawn or invalid

7 files with "Beverton Meadows" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2014–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 8 is asked for more information, which adds about 47 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 8): 84 days; Appeal window: 4 weeks; If appealed: +140 days; Building starts: 119 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–55 (n=104)53 daysIf more info asked (1 in 8)With further information: median 84 days (n=8)84 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 140 days (n=32, all appeals within 1.5 km)+140 daysBuilding startsStart notice: median 119 days after permission (n=52)119 days after permissionSigned off333 days after the start, for the few who file. 25% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated119 decided home extensions, 52 start notices, 32 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    6 of 13 appealed refusals became permissions. 1 of 21 appealed approvals were reversed.

    Refusals appealed13 decided
    6 became permissions
    Approvals appealed21 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Beverton Meadows with 9 numbered planning items
    ⌖ the houseBuilding startedEmpty land zoned for homesApprovedNo decision yet
    1. 111 Beverton Drive, Donabate F25A/0146EBuilding started · 87 m
    2. 20.2 ha zoned for homesEmpty land zoned for homes · 115 m
    3. 30.2 ha zoned for homesEmpty land zoned for homes · 121 m
    4. 40.3 ha zoned for homesEmpty land zoned for homes · 123 m
    5. 50.3 ha zoned for homesEmpty land zoned for homes · 156 m
    6. 60.7 ha zoned for homesEmpty land zoned for homes · 166 m
    7. 70.4 ha zoned for homesEmpty land zoned for homes · 175 m
    8. 833 Beverton Drive, Donabate F26A/0598EApproved · 206 m
    9. 9Tesco Distrabution Centre, Lanistown F26A/0577No decision yet · 254 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 62 permissions since 2016, 25 show a start notice and 7 have a completion certificate.

    79 applications lodged within 500 m. Council: 63 approved, 8 refused. After appeals: 62 approved. Of those: 7 signed off, 6 built with the owner's opt-out, 12 started, 36 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT63: lodged → approved8: lodged → refused7: lodged → withdrawn or invalid1: lodged → undecided61: approved → approved7: refused → refused7: withdrawn or invalid → withdrawn1: undecided → undecided2 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal36: approved → no start notice found6: approved → built, owner opted out12: approved → started, not signed off7: approved → signed off1: approved → ran out79 lodged79 lodged63 approved63 approved8 refused8 refused7 withdrawn or invalid7 withdrawn or invalid1 undecided1 undecided62 approved62 approved7 refused7 refused9 withdrawn9 withdrawn1 undecided1 undecided36 no start notice found36 no start notice found6 built, owner opted out6 built, owner opted out12 started, not signed off12 started, not signed off7 signed off7 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured79 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      1 building site nearby stopped before sign-off. DART+ Coastal North is planned 533 m away.

      Beresford, Donabate · 288 homes: 288 homes, started Jun 2022, never signed off; DART+ Coastal North, DART+…: railway order approved (An Coimisiún Pleanála; applied July 2024); DART+ Coastal North, Donabate: railway order approved (An Coimisiún Pleanála; applied July 2024)2022202320242025202620272028Beresford, Donabate · 288 homes386 m · F16A/0535288 homes, started Jun 2022, never signed off288 homes, started Jun 2022, never signed offDART+ Coastal North, DART+…533 m · plannedrailway order approved (An Coimisiún Pleanála; applied July 2024)DART+ Coastal North, Donabate704 m · plannedrailway order approved (An Coimisiún Pleanála; applied July 2024)today

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 11 within 500 m

      Building site that stopped 1

      Empty land zoned for homes 10

      • 20.2 ha zoned for homes · no homes built on it yet · 115 m
      • 30.2 ha zoned for homes · no homes built on it yet · 121 m
      • 40.3 ha zoned for homes · no homes built on it yet · 123 m
      • 50.3 ha zoned for homes · no homes built on it yet · 156 m
      • 60.7 ha zoned for homes · no homes built on it yet · 166 m
      • 70.4 ha zoned for homes · no homes built on it yet · 175 m
      • 0.5 ha zoned for homes · no homes built on it yet · 182 m
      • 0.1 ha zoned for homes · no homes built on it yet · 206 m
      • 1.1 ha zoned for homes · no homes built on it yet · 212 m
      • 6.7 ha zoned for homes · no homes built on it yet · 222 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 18 Oct 2026, 02:18
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
      Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
      Council meetings (ModernGov)Public18 Oct 2026, 02:18open
      National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
      Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
      Figure 9

      Applications within 500 m, by year

      Between 2 and 15 a year; busiest 2024. 89% of decisions were approvals.

      2016: 1, 2017: 9, 2018: 6, 2019: 14, 2020: 6, 2021: 9, 2022: 8, 2023: 2, 2024: 15, 2025: 7, 2026: 2051015202016: 1 approved1’16*2017: 8 approved2017: 1 refused9’172018: 3 approved2018: 2 refused2018: 1 withdrawn or invalid6’182019: 9 approved2019: 3 refused2019: 2 withdrawn or invalid14’192020: 6 approved6’202021: 8 approved2021: 1 refused9’212022: 7 approved2022: 1 withdrawn or invalid8’222023: 2 approved2’232024: 12 approved2024: 3 withdrawn or invalid15’242025: 6 approved2025: 1 refused7’252026: 1 approved2026: 1 undecided2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 2 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 18 Oct 2026, 02:06
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
      Building work nearby 2 in the last 12 months
      2 no sign-off needed
      • 111 Beverton Drive, Donabate, Dublin, K36 RK29 · 17 Jun 2026 · 1 homes · short notice no sign-off needed · F25A/0146E · 87 m
      • 35 Beverton Way, Donabate, Fingal, K36 AR20 · 16 Apr 2026 · 1 homes · short notice no sign-off needed · F25A/0694E · 455 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 18 Oct 2026, 01:21
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
      Homes coming 0 not started
      • Beresford · 16 homes · building started · 294 m
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 18 Oct 2026, 02:06
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
      National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
      Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Beverton · 51 applications in 10 years · 96% approved · most common: attic conversion / dormer

      Developments within 1.0 km

      SchemeHomesProgressDistance
      existing——439 m
      ‘The Gallery’——442 m
      Lands South of Main Street, Donabate55—713 m
      Corballis East——713 m
      Main Street——716 m
      Hearse Road——783 m
      Lands at Hearse Road263256 built · 7 not started (2026-Q2)845 m
      The Paddocks West28no activity on site reported (2025-Q4)931 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Roots and Wings Kindergarten & Afterschool · Crèche23 Sept 2024 · report · Tusla Early Years Inspectorate204 m
      Isabella's Childcare Beresford 1 · Crèche30 Apr 2024 · report · Tusla Early Years Inspectorate223 m
      Isabella’s Childcare Beresford 2 · Crèche2 Jun 2026 · report · Tusla Early Years Inspectorate389 m
      Daisybelle T/A Treehouse Childcare · Crèche26 Aug 2025 · report · Tusla Early Years Inspectorate649 m
      Best Bee Kids-Unit 2 · Crèche9 May 2025 · report · Tusla Early Years Inspectorate763 m
      Sophia Nurturing Centre Donabate · Crèche10 Jul 2024 · report · Tusla Early Years Inspectorate773 m
      Linda's Creche & Montessori School · Crèche16 Sept 2024 · report · Tusla Early Years Inspectorate803 m
      Best Bee Kids-Unit 1 · Crèche26 Nov 2025 · report · Tusla Early Years Inspectorate832 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 18 Oct 2026, 02:06
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.012 Oct 2026, 23:02open
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
      National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register14 Oct 2026, 23:20open
      How busy is this area Busier than most of Fingal County Council.
      Homes approved
      Here22
      Council middle0
      Homes started
      Here804
      Council middle3
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
      National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      0% of homes built before 1971 (council 11%). 92% owner-occupied (council 67%).

      Homes built before 1971
      0% · council 11%
      Homes built since 2001
      100% · council 43%
      Owner-occupied
      92% · council 67%
      Rented
      5% · council 28%
      Children under 15
      35% · council 22%
      Aged 65 and over
      1% · council 11%
      Households with 2+ cars
      52% · council 42%
      Work mainly from home
      21% · council 12%
      This small area (201 people)Fingal

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267065021/01

      Bus
      398 m
      Turvey Avenue · 33T · busiest stop within 500 m: 0 an hour at peak
      Planned
      533 m
      DART+ Coastal North, DART+ Coastal North: Malahide - Drogheda (MacBride)
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      849 m
      Gaelscoil na Mara, 123 pupils
      Homes sold nearby
      45
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Gaelscoil na Mara · primary · 123 pupils · 849 m
      • Donabate/Portrane Educate Together NS · primary · 414 pupils · 898 m
      • Donabate Community College · postprimary · 799 pupils · 974 m

      Stops 10

      • Turvey Avenue · 33T · 0/hour at peak · 398 m
      • Turvey Avenue · 33E, 33T · 0/hour at peak · 431 m
      • Donabate · Dublin - Drogheda/Dundalk, Dublin - Europort · 5/hour at peak · 704 m
      • Donabate Station · 33D, 33E, 33n · 0/hour at peak · 721 m
      • Donabate Station · 33D, 33E · 1/hour at peak · 729 m
      • Donabate · 33B, 33D, 33E, 33T, 33n · 3/hour at peak · 758 m
      • Main Street · 33B, 33D, 33E, 33T, 33n · 3/hour at peak · 793 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Gaelscoil na Mara · 849 m+17.1% pupils (123) · 4 classrooms 2025, approved
      • Donabate/Portrane Educate Together NS · 898 m-1.2% pupils (414)
      • Donabate Community College · 974 m-1.7% pupils (799)

      Open consultations

      Council meetings 30 items

      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 18 Oct 2026, 02:18
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
      Council consultation portalsPublic18 Oct 2026, 01:37open
      Council meetings (ModernGov)Public18 Oct 2026, 02:18open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Attic or dormer (F14B/0126) built without official sign-off: built properly?
        Ask for: An engineer's opinion of compliance.
        Seller · solicitor
      2. Planning here goes back to 2012: is the house built as approved?
        Ask for: The original planning grant and an opinion of compliance.
        Solicitor
      3. Building work started 87 m away: for how long?
        Ask for: The planning conditions for F25A/0146E.
        Agent · council
      4. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Beaverstown
      Electoral division
      Donabate
      Electoral area
      Rush-Lusk
      Council
      Fingal County Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest F14B/0126, approved 2014, started, no sign-off needed.
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 11 sites nearby could change: 1 stalled build, 10 empty zoned plots.
      • Turvey Avenue (bus 33T) 398 m away: 1 a day, fewer than one an hour at morning peak. Planned: DART+ Coastal North 533 m away, railway order approved (An Coimisiún Pleanála; applied July 2024).
      • Here (2022 census): 92% owner-occupied (council 67%); 0% of homes empty (council 5%); most built 2001–2010; 52% drive to work (council 52%); population up 25% since 2016.
      • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
      • Homes started within 1 km: 21 in the last year, 96 three years before.
      • 2 applications nearby in the last 12 months.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
      Sources and licences 31
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.018 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public18 Oct 2026
      www2.courts.ie—© the publisher18 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.012 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public18 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.018 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence18 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 18 Oct 2026, 20:06 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.