PlanningRegister.ie
Planning report · Meath County Council · 500 m around the house · the last 12 months · 15 Oct 2026, 00:15

Dunshaughlin

53.50768, -6.52844

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (95%). A building site 452 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 2 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R1
Zoning · New residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR1 · New residential
What it says

A2 - New Residential: New Residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

meath county development plan 2021 2027 · 3 Nov 2021 – 2 Nov 2027

ZoningR1 · New residential
What it says

A2 - New Residential: New Residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

meath county development plan 2021 2027 as varied · 3 Nov 2021 – 2 Nov 2027

Monument zone3 within 100 m Ring-ditch, Dunshaughlin; Kiln, Dunshaughlin
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares2
Monuments8Burnt mound; Kiln
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: zoning, constraints.radon, constraints.smr, rzlt, constraints · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 14 Oct 2026, 00:33
SourceLicenceFetchedLink
bcmsCC-BY-4.014 Oct 2026, 00:33open
npadCC-BY-4.014 Oct 2026, 02:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 90–100% by type. A new house in a garden is harder: 75% approved, and 1 in 2 is asked for more information.

Single-storey rear17 decided · more info asked 6%
100% · council 98%
Attic or dormer20 decided · more info asked 25%
90% · council 92%
New house in a garden or site24 decided · more info asked 42%
75% · council 78%
Approved nearbyMeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 61 nearby, 4,423 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 14 Oct 2026, 02:03
    SourceLicenceFetchedLink
    npadCC-BY-4.014 Oct 2026, 02:03open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    npadCC-BY-4.014 Oct 2026, 02:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 53 days. 1 in 7 is asked for more information, which adds about 97 days. Building starts about 2 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 7): 151 days; Appeal window: 4 weeks; Building starts: 59 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 51–55 (n=70)53 daysIf more info asked (1 in 7)With further information: median 151 days (n=11)151 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 59 days after permission (n=13)59 days after permissionSigned off268 days after the start, for the few who file. 47% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated81 decided home extensions, 15 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    1 of 3 appealed refusals became permissions. 1 of 4 appealed approvals were reversed.

    Refusals appealed3 decided
    1 became permissions
    Approvals appealed4 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501788 Invalid · Lands at Lagore Road , Dunshaughlin , Co Meath · 149 m
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved14 Oct 2026, 01:31open
    npadCC-BY-4.014 Oct 2026, 02:03open
    Question 4

    What's changing around you?

    Street map around Dunshaughlin with 9 numbered planning items
    ⌖ the houseBuilding site that stoppedRefusedBuilding startedEmpty land zoned for homesApprovedNo decision yet
    1. 1Maelduin, Dunshaughlin RA/171256Building site that stopped · 452 m
    2. 2Lands at Lagore Road, Dunshaughlin 2660551Refused · 149 m
    3. 3Birch Manor, Dunshaughlin 25/61019Building started · 137 m
    4. 42.2 ha zoned for homesEmpty land zoned for homes · 149 m
    5. 50.5 ha zoned for homesEmpty land zoned for homes · 316 m
    6. 619.6 ha zoned for homesEmpty land zoned for homes · 0 m
    7. 7Unit 13A Dunshaughlin Business Park, Dunshaughlin 2660862Approved with conditions · 318 m
    8. 8Dunshaughlin, Co. Meath 2660279No decision yet · 406 m
    9. 9Unit 10 Section 1 Dunshaughlin Business Park, Dunshaughlin 2660269Approved with conditions · 496 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 16 permissions since 2016, 3 show a start notice and 1 has a completion certificate.

    18 applications lodged within 500 m. Council: 16 approved, 2 refused. After appeals: 16 approved. Of those: 1 signed off, 0 built with the owner's opt-out, 2 started, 10 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT16: lodged → approved2: lodged → refused16: approved → approved2: refused → refused10: approved → no start notice found2: approved → started, not signed off1: approved → signed off3: approved → ran out18 lodged18 lodged16 approved16 approved2 refused2 refused16 approved16 approved2 refused2 refused10 no start notice found10 no start notice found2 started, not signed off2 started, not signed off1 signed off1 signed off3 ran out3 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured18 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Approved, stalled or planned, not built yet

      1 building site nearby stopped before sign-off.

      Maelduin, Dunshaughlin · 24 homes: 24 homes, started Aug 2018, never signed off20182019202020212022202320242025202620272028Maelduin, Dunshaughlin · 24 homes452 m · RA/17125624 homes, started Aug 2018, never signed off24 homes, started Aug 2018, never signed offtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 4 within 500 m

      Building site that stopped 1

      • 1Maelduin, Dunshaughlin · 24 homes, started Aug 2018, never signed off · 452 m

      Empty land zoned for homes 3

      • 42.2 ha zoned for homes · no homes built on it yet · 149 m
      • 50.5 ha zoned for homes · no homes built on it yet · 316 m
      • 619.6 ha zoned for homes · no homes built on it yet · 0 m

      Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

      Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.014 Oct 2026, 00:33open
      derelictCC-BY-4.012 Oct 2026, 23:08open
      npadCC-BY-4.014 Oct 2026, 02:03open
      Figure 8

      Applications within 500 m, by year

      Between 1 and 4 a year; busiest 2024. 89% of decisions were approvals.

      2017: 1, 2019: 2, 2021: 3, 2022: 1, 2023: 3, 2024: 4, 2025: 1, 2026: 305102017: 1 approved1’17*2019: 2 approved2’192021: 3 approved3’212022: 1 approved1’222023: 3 approved3’232024: 3 approved2024: 1 refused4’242025: 1 approved1’252026: 2 approved2026: 1 refused3’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 7 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: npad, acp, bcms · fetched 14 Oct 2026, 02:03
      SourceLicenceFetchedLink
      npadCC-BY-4.014 Oct 2026, 02:03open
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.014 Oct 2026, 00:33open
      Building work nearby 6 in the last 12 months
      5 not signed off1 no sign-off needed
      • 3Birch Manor, Dunshaughlin, Meath · 23 Sept 2026 · start notice not signed off · 25/61019 · 137 m
      • Oak Court, Dunshaughlin, Meath · 5 Aug 2026 · 839 homes · start notice not signed off · 25/61019 · 490 m
      • 13 Oak Drive, Dunshaughlin, Meath · 30 Jul 2026 · 839 homes · start notice not signed off · 25/61019 · 354 m
      • 13 Oak Drive, Dunshaughlin, Meath · 22 Jul 2026 · 839 homes · start notice not signed off · 25/61019 · 412 m
      • Lagore Road, Dunshaughlin, Meath · 10 Jul 2026 · 94 homes · start notice not signed off · ABP-322670-25 · 351 m
      • 18 Coldrick's Pass, Dunshaughlin, Meath, A85 VE43 · 8 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 21/707 · 321 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: bcms · fetched 14 Oct 2026, 00:33
      SourceLicenceFetchedLink
      bcmsCC-BY-4.014 Oct 2026, 00:33open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.014 Oct 2026, 00:33open
      npadCC-BY-4.014 Oct 2026, 02:03open
      social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: The Willows · 25 applications in 10 years · 100% approved · most common: attic conversion / dormer

      Crèches and schools inspected

      NameLatest inspectionDistance
      Cookies Early Learning Centre Ltd · Crèche29 Sept 2025 · report · Tusla Early Years Inspectorate727 m
      Reach for the Stars · Crèche23 Oct 2024 · report · Tusla Early Years Inspectorate860 m
      Here We Grow Preschool · Crèche7 Apr 2025 · report · Tusla Early Years Inspectorate963 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: estates, schools, tusla_ey · fetched 27 Sept 2026, 20:18
      SourceLicenceFetchedLink
      estatesODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) + CC-BY-4.0 (Kildare)27 Sept 2026, 20:18open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)14 Oct 2026, 23:20open
      How busy is this area Busier than most of Meath County Council.
      Homes approved
      Here51
      Council middle0
      Homes started
      Here5,446
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.014 Oct 2026, 00:33open
      npadCC-BY-4.014 Oct 2026, 02:03open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      30% of homes built before 1971 (council 18%). 87% owner-occupied (council 75%).

      Homes built before 1971
      30% · council 18%
      Homes built since 2001
      27% · council 45%
      Owner-occupied
      87% · council 75%
      Rented
      4% · council 20%
      Children under 15
      17% · council 23%
      Aged 65 and over
      26% · council 12%
      Households with 2+ cars
      69% · council 54%
      Work mainly from home
      16% · council 11%
      This small area (239 people)Meath

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 167030016/02

      Bus
      746 m
      The Willows · 109, 109B
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      628 m
      Coláiste Rioga, 267 pupils
      Homes sold nearby
      256
      in 3 years, 31 new (Property Price Register)
      Schools, stops and the council

      Schools

      • Coláiste Rioga · postprimary · 267 pupils · 628 m
      • S N Seachnaill Naofa · primary · 622 pupils · 810 m

      Stops 7

      • The Willows · 109, 109B · 3/hour at peak · 746 m
      • The Willows · 109, 109B · 2/hour at peak · 764 m
      • Dunshaughlin · 179 · 775 m
      • Seachnall Aby · 109, 109B · 3/hour at peak · 780 m
      • Seachnall Aby · 109, 109B · 2/hour at peak · 789 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Coláiste Rioga · 628 m+38.3% pupils (267)
      • S N Seachnaill Naofa · 810 m-0.2% pupils (622)
      Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
      SourceLicenceFetchedLink
      gtfsCC-BY-4.011 Oct 2026, 23:43open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      npadCC-BY-4.014 Oct 2026, 02:03open
      consultpublic14 Oct 2026, 01:30open
      moderngovpublic14 Oct 2026, 01:30open
      lda_landsCC-BY-4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Dunshaughlin
      Electoral division
      Dunshaughlin
      Electoral area
      Ratoath
      Council
      Meath County Council
      Everything we found, as a list 8 lines
      • Zoned R1 (new residential); not protected; on the vacant land tax map.
      • 4 sites nearby could change: 1 stalled build, 3 empty zoned plots.
      • No morning-peak service within 500 m; nearest is The Willows, 746 m away (3 an hour).
      • Here (2022 census): 87% owner-occupied (council 75%); 2% of homes empty (council 6%); most built 1971–1980; 58% drive to work (council 64%); population up 46% since 2016.
      • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
      • Homes started within 1 km: 1,129 in the last year, 926 three years before.
      • 7 applications nearby in the last 12 months.
      • 1 building job started within 250 m in the last six months.
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.013 Oct 2026
      data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
      dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public14 Oct 2026
      www2.courts.ie—all-rights-reserved14 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.012 Oct 2026
      esbnetworks.ie—all-rights-reserved (esbnetworks.ie di… · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) +…27 Sept 2026
      transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
      lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)public14 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.014 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…14 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
      gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
      gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 15 Oct 2026, 00:15 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.