PlanningRegister.ie
Planning report · Westmeath County Council · 500 m around the house · the last 12 months · 20 Oct 2026, 21:08

Killucan ED, The Municipal District of Mullingar — Kinnegad, County Westmeath, Leinster, Éire / Ireland

53.51172, -7.14491

Homes here mostly date from the 2000s. 2 planning files on this house, the latest from 2023.

See on the mapWatch this area

Not held yet for Westmeath County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 2 planning files on this house, the latest from 2023.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Rathwire LowerBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2023: 2330 · extension, approved2023: 2328 · extension, withdrawn or invalid2018: 2 files on Rathwire Lower2019: 2 files on Rathwire Lower2020: 1 file on Rathwire Lower2024: 2 files on Rathwire Lower2025: 1 file on Rathwire Lower8 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    2330 · extension · approved 2023 · started, no sign-off needed
    approvedstartedsigned off?
  2. 2023
    2328 · extension · withdrawn
    approved?started?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Established Residential: Support high quality residential consolidation and sustainable intensification at appropriate locations in a manner that does not impact negatively on the amenities or character of an area.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

wcc cdp 2021 2027 killucan rathwire · 3 May 2021 – 2 May 2027

Protected building2 within 100 m on the council's record (not republished); on the council's record (not republished)
Heritage inventory3 within 100 m Killucan Presbyterian Church; The Manse
Monument zone3 within 100 m Cross - Wayside cross, Rathwire Lower; Cross - Wayside cross (present location), Rathwire Lower

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings18house; public house
Monuments15R165407; R165420
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 10 on the draft 2027 map; 10 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 82% approved, and 1 in 2 are asked for more information.

New house in a garden or site17 decided · more info asked 59%
82% · council 82%
Approved nearbyWestmeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 17 nearby, 1,362 council-wide

Figure 3

Rathwire Lower, file by file since 2018

1 of 1 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

8 planning files on Rathwire Lower since 2018, by kind and decision.201820192020202120222023202420252026Extensions, atticsNo number · 2024 · other extension · approved · 2460410Porches, roofs, otherNo number · 2018 · other work · approved · 186337No number · 2018 · other work · approved · 186394No number · 2019 · other work · approved · 196149No number · 2019 · other work · approved · 196261No number · 2020 · other work · approved · 206340No number · 2025 · other work · approved · 2560212New house in a side gardenNo number · 2024 · new house · approved · 2460146
ApprovedRefusedWithdrawn or invalid

8 files with "Rathwire Lower" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2018–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 51 days. 1 in 2 is asked for more information, which adds about 122 days.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 2): 175 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 48–54 (n=9)51 daysIf more info asked (1 in 2)With further information: median 175 days (n=8)175 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off60% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated17 decided home extensions, 5 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Killucan ED, The Municipal District of Mullingar — Kinnegad, County Westmeath, Leinster, Éire / Ireland with 11 numbered planning items
    ⌖ the houseWindow closingEmpty land zoned for homesApprovedNo decision yet
    1. 1Smith's Apartments (rear), Killucan 2560546Approved with conditions · 310 m
    2. 20.6 ha zoned for homesEmpty land zoned for homes · 263 m
    3. 31.4 ha zoned for homesEmpty land zoned for homes · 277 m
    4. 43.0 ha zoned for homesEmpty land zoned for homes · 290 m
    5. 50.3 ha zoned for homesEmpty land zoned for homes · 310 m
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 338 m
    7. 70.5 ha zoned for homesEmpty land zoned for homes · 398 m
    8. 8Killucan Market House, Rathwire Upper 2660316Approved with conditions · 199 m
    9. 9Rathwire Upper, Killucan 2560577Approved with conditions · 355 m
    10. 10Rathwire Lower, Killucan 2660082No decision yet · 436 m
    11. 1119 Ivy Court, Killucan 2660201Approved with conditions · 487 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 18 permissions since 2016, 6 show a start notice and 2 have a completion certificate.

    21 applications lodged within 500 m. Council: 18 approved, 3 refused. After appeals: 18 approved. Of those: 2 signed off, 2 built with the owner's opt-out, 2 started, 7 with no start notice found, 5 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT18: lodged → approved3: lodged → refused18: approved → approved3: refused → refused7: approved → no start notice found2: approved → built, owner opted out2: approved → started, not signed off2: approved → signed off5: approved → ran out21 lodged21 lodged18 approved18 approved3 refused3 refused18 approved18 approved3 refused3 refused7 no start notice found7 no start notice found2 built, owner opted out2 built, owner opted out2 started, not signed off2 started, not signed off2 signed off2 signed off5 ran out5 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured21 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 6 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-06 2560546: CONDITIONAL — to renovate existing derelict house and a commercial premises on site to habitable accommodation. Building 01: Locatedtoday25 Oct30 Oct4 Nov9 Nov14 Nov19 Nov2560546: CONDITIONAL — to renovate existing derelict house and a commercial premises on site to habitable accommodation. Building 01: Located · 310 m away · 2026-11-06
    Time to appeal ends
    • Time to appeal ends 6 Nov 202617 days left
      12560546 · CONDITIONAL — to renovate existing derelict house and a commercial premises on site to habitable accommodation.…
      €220 to An Coimisiún Pleanála (€110 observer) · 310 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 7 within 500 m

    Empty land zoned for homes 7

    • 20.6 ha zoned for homes · no homes built on it yet · 263 m
    • 31.4 ha zoned for homes · no homes built on it yet · 277 m
    • 43.0 ha zoned for homes · no homes built on it yet · 290 m
    • 50.3 ha zoned for homes · no homes built on it yet · 310 m
    • 60.2 ha zoned for homes · no homes built on it yet · 338 m
    • 70.5 ha zoned for homes · no homes built on it yet · 398 m
    • 0.3 ha zoned for homes · no homes built on it yet · 412 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 7

    Applications within 500 m, by year

    Between 1 and 4 a year; busiest 2020. 86% of decisions were approvals.

    2017: 1, 2018: 1, 2019: 2, 2020: 4, 2021: 4, 2022: 2, 2023: 1, 2024: 1, 2025: 3, 2026: 205102017: 1 approved1’17*2018: 1 approved1’182019: 2 approved2’192020: 3 approved2020: 1 refused4’202021: 4 approved4’212022: 2 refused2’222023: 1 approved1’232024: 1 approved1’242025: 3 approved3’252026: 2 approved2’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 6 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Building work nearby 1 in the last 12 months
    1 not signed off
    • cloghan road, Killucan, Westmeath · 25 Sept 2026 · 1 homes · start notice not signed off · 21/236 · 384 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 20 Oct 2026, 01:45
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Killucan Care Ltd · Crèche23 Feb 2026 · report · Tusla Early Years Inspectorateapprox. 860 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area About as busy as most of Westmeath County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here1
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    66% owner-occupied (council 68%).

    Homes built before 1971
    20% · council 26%
    Homes built since 2001
    66% · council 34%
    Owner-occupied
    66% · council 68%
    Rented
    21% · council 26%
    Children under 15
    17% · council 21%
    Aged 65 and over
    19% · council 15%
    Households with 2+ cars
    53% · council 44%
    Work mainly from home
    10% · council 9%
    This small area (358 people)Westmeath

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 237065004

    Bus
    192 m
    Killucan · 115C, 190 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    629 m
    Columba College, 278 pupils
    Schools, stops and the council

    Schools

    • Columba College · postprimary · 278 pupils · 629 m

    Stops 2

    • Killucan · 115C, 190 · 1/hour at peak · 192 m
    • Killucan · 115C, 190 · 0/hour at peak · 276 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Columba College · 629 m-6.4% pupils (278) · 16 classrooms 2025, no decision yet
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 20 Oct 2026, 02:32
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Council consultation portalsPublic20 Oct 2026, 01:41open
    Council meetings (ModernGov)Public20 Oct 2026, 02:32open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Extension (2330) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Rathwire Lower
    Electoral division
    Killucan
    Electoral area
    Kinnegad
    Council
    Westmeath County Council
    Everything we found, as a list 8 lines
    • 2 applications on this site; latest 2330, approved 2023, started, no sign-off needed.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 7 sites nearby could change: 7 empty zoned plots.
    • Killucan (bus 115C, 190) 192 m away: 13 a day, fewer than one an hour at morning peak.
    • Here (2022 census): 66% owner-occupied (council 68%); 8% of homes empty (council 9%); most built 2001–2010; 63% drive to work (council 63%); population up 12% since 2016.
    • The council decides in a median 59 days (about 8 weeks); 43% are asked for more information.
    • Homes started within 1 km: 1 in the last year, 24 three years before.
    • 6 applications nearby in the last 12 months.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.020 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public20 Oct 2026
    www2.courts.ie—© the publisher20 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public20 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.020 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence20 Oct 2026
    services7.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 20 Oct 2026, 21:08 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.