PlanningRegister.ie
Planning report · Galway County Council · 2000 m around the house · the last 12 months · 24 Oct 2026, 18:57

Weir Road

53.52032, -8.88315

Homes here mostly date from the 1990s. 149 homes approved 1.8 km away haven't started.

See on the mapWatch this area

Not held yet for Galway County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Tuam (532 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings5Prospect House; Saint Mary's Cathedral
Monuments68Ringfort - rath; Bridge
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 104 on the draft 2027 map; 104 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 24 Oct 2026, 02:29
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Question 3

    How long, and what if someone objects?

    Figure 2

    A home extension's journey here

    A decision takes 51 days.

    Comments open: 5 weeks · €20; Council decision: 51 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 48–54 (n=9)51 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off67% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated9 decided home extensions, 3 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Appeals nearby 1 in the last 12 months
    • 501160 Granted · Farrannamartin , Cloontooa Tuam , Tuam Celtic AFC · 1.9 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 24 Oct 2026, 02:29
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher23 Oct 2026, 23:01open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Question 4

    What's changing around you?

    Street map around Weir Road with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingEmpty land zoned for homesApproved
    1. 1Killaloonty, Bealach Na Gaoith 2661633No decision yet · 1.3 km
    2. 2Kilmore, Unit 33-34 N17 Business Park 2661675No decision yet · 1.4 km
    3. 3Kilmore, Tuam 2661698No decision yet · 1.4 km
    4. 4Tuam Townparks (2nd division), 24 Mill Stream Park 2661674No decision yet · 1.6 km
    5. 5Townparks (2nd division), Tuam 2661657No decision yet · 1.9 km
    6. 6Farrannamartin, Tuam Urban 2660906Approved with conditions · 1.6 km
    7. 72.9 ha zoned for homesEmpty land zoned for homes · 512 m
    8. 80.4 ha zoned for homesEmpty land zoned for homes · 565 m
    9. 90.2 ha zoned for homesEmpty land zoned for homes · 654 m
    10. 101.1 ha zoned for homesEmpty land zoned for homes · 704 m
    11. 111.4 ha zoned for homesEmpty land zoned for homes · 789 m
    12. 122.6 ha zoned for homesEmpty land zoned for homes · 792 m
    13. 13Carrowmacowan, Tuam 2561868Approved with conditions · 868 m
    14. 14Carrowmacowan, Tuam 2561789Approved with conditions · 884 m
    15. 15Airgloony, Tuam 2561861Approved with conditions · 948 m
    Figure 3

    The next 30 days

    6 deadlines within 2.0 km; the first closes 27 Oct 2026.

    6 deadlines in the next 30 days: 2026-10-27 2660906: CONDITIONAL — for a large scale residential development (LRD) comprising of the following: a) the demolition of the existing derelict ; 2026-11-04 2661633: application received — for the provision of no.2 three storey duplex blocks comprising of 5 no. one bed units, 8 no. two bed units, 3 no. three; 2026-11-09 2661657: application received — sought to construct four meal bins/silo’s. Full planning permission also sought to retain the change of use of an agricu; 2026-11-12 2661675: application received — for the change of use from commercial to a place of communal gatherings which hold scheduled services and all ancillary ; 2026-11-12 2661674: application received — of changes to the roof of dwelling house, window to side elevation of dwelling house and change of use of dog grooming p; 2026-11-16 2661698: application received — for the provision of 12 new electric car parking spaces, with 6no. electric charging points to service them, 2no. HGV chtoday29 Oct3 Nov8 Nov13 Nov18 Nov23 Nov2660906: CONDITIONAL — for a large scale residential development (LRD) comprising of the following: a) the demolition of the existing derelict · 1.6 km away · 2026-10-272661633: application received — for the provision of no.2 three storey duplex blocks comprising of 5 no. one bed units, 8 no. two bed units, 3 no. three · 1.3 km away · 2026-11-042661657: application received — sought to construct four meal bins/silo’s. Full planning permission also sought to retain the change of use of an agricu · 1.9 km away · 2026-11-092661675: application received — for the change of use from commercial to a place of communal gatherings which hold scheduled services and all ancillary · 1.4 km away · 2026-11-122661674: application received — of changes to the roof of dwelling house, window to side elevation of dwelling house and change of use of dog grooming p · 1.6 km away · 2026-11-122661698: application received — for the provision of 12 new electric car parking spaces, with 6no. electric charging points to service them, 2no. HGV ch · 1.4 km away · 2026-11-16
    Comments closeTime to appeal ends
    • Time to appeal ends 27 Oct 20263 days left
      62660906 · CONDITIONAL — for a large scale residential development (LRD) comprising of the following: a) the demolition of the…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.6 km away
    • Comments close 4 Nov 202611 days left
      12661633 · application received — for the provision of no.2 three storey duplex blocks comprising of 5 no. one bed units, 8 no.…
      €20 to the council · 1.3 km away
    • Comments close 9 Nov 202616 days left
      52661657 · application received — sought to construct four meal bins/silo’s. Full planning permission also sought to retain the…
      €20 to the council · 1.9 km away
    • Comments close 12 Nov 202619 days left
      22661675 · application received — for the change of use from commercial to a place of communal gatherings which hold scheduled…
      €20 to the council · 1.4 km away
    • Comments close 12 Nov 202619 days left
      42661674 · application received — of changes to the roof of dwelling house, window to side elevation of dwelling house and change…
      €20 to the council · 1.6 km away
    • Comments close 16 Nov 202623 days left
      32661698 · application received — for the provision of 12 new electric car parking spaces, with 6no. electric charging points to…
      €20 to the council · 1.4 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 4

    Approved, stalled or planned, not built yet

    149 homes 1.8 km away were approved Sept 2026 with no start notice yet; the permission runs to Sept 2031.

    Farrannamartin · 149 homes: 149 homes approved Sep 2026, not started202420252026202720282029203020312032Farrannamartin · 149 homes1.8 km · 2660906149 homes approved Sep 2026, not started149 homes approved Sep 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 2.0 km

    Approved, not started 1

    Empty land zoned for homes 10

    • 72.9 ha zoned for homes · no homes built on it yet · 512 m
    • 80.4 ha zoned for homes · no homes built on it yet · 565 m
    • 90.2 ha zoned for homes · no homes built on it yet · 654 m
    • 101.1 ha zoned for homes · no homes built on it yet · 704 m
    • 111.4 ha zoned for homes · no homes built on it yet · 789 m
    • 122.6 ha zoned for homes · no homes built on it yet · 792 m
    • 5.6 ha zoned for homes · no homes built on it yet · 846 m
    • 0.1 ha zoned for homes · no homes built on it yet · 878 m
    • 0.6 ha zoned for homes · no homes built on it yet · 890 m
    • 0.6 ha zoned for homes · no homes built on it yet · 904 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 5

    Applications within 500 m, by year

    2021: 1, 2024: 105102021: 1 approved1’21*2024: 1 approved1’24
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 29 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Building work nearby 7 in the last 12 months
    2 not signed off5 no sign-off needed
    • CARROWMACOWAN, Tuam, Galway · 17 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 24/277 · 907 m
    • CARROWMACOWAN, Tuam, Galway · 17 Jul 2026 · short notice no sign-off needed · 24/277 · 911 m
    • Woodfield, Galway Road, Killaloonty, Tuam, Galway · 23 Jun 2026 · 1 homes · start notice not signed off · 25/61291 · 1.2 km
    • Milltown Road, Tuam, Galway, H54AX61 · 8 May 2026 · 1 homes · start notice, opted out no sign-off needed · 2660114 · 1.8 km
    • Kilmore Townland, Tuam, Galway · 12 Mar 2026 · start notice not signed off · 16/1030 & 21/679 · 1.2 km
    • AIRGLOONY, TUAM,, Galway · 10 Feb 2026 · short notice no sign-off needed · 221218 · 812 m
    • AIRGLOONY, TUAM,, Galway · 9 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 221218 · 811 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Homes coming 149 not started
    • 6Farrannamartin · 149 homes · not started · runs out 29 Sept 2031 · 1.8 km
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    How busy is this area About as busy as most of Galway County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here2
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Question 5

    What's the area like?

    Figure 6

    This street block against the council

    36% of homes built before 1971 (council 23%). 90% owner-occupied (council 75%).

    Homes built before 1971
    36% · council 23%
    Homes built since 2001
    18% · council 39%
    Owner-occupied
    90% · council 75%
    Rented
    3% · council 18%
    Children under 15
    20% · council 21%
    Aged 65 and over
    20% · council 17%
    Households with 2+ cars
    59% · council 52%
    Work mainly from home
    17% · council 11%
    This small area (238 people)Galway

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 067211017

    Schools, stops and the council

    Schools

    None nearby.

      Stops 15

        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 24 Oct 2026, 02:46
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
        Department of Education school listCC BY 4.027 Sept 2026, 23:32open
        Council consultation portalsPublic24 Oct 2026, 01:49open
        Council meetings (ModernGov)Public24 Oct 2026, 02:46open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Application 1.3 km away open for comments until 4 Nov 2026: comment?
          Ask for: The plans on the council's website (€20 to comment).
          Council
        2. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Killaloonty
        Electoral division
        Tuam Rural
        Electoral area
        Tuam
        Council
        Galway County Council
        Everything we found, as a list 8 lines
        • Not protected; no vacant land tax.
        • Flood Zone A 21 m away on the Tuam Local Area Plan 2023-2029 flood map.
        • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
        • 5 applications open for comments nearby; nearest closes 4 Nov 2026.
        • 149 homes approved nearby, not started; largest 149 at Farrannamartin.
        • No scheduled public transport within 800 m.
        • Here (2022 census): 90% owner-occupied (council 75%); 13% of homes empty (council 16%); most built 1991–2000; 63% drive to work (council 66%); population up 8% since 2016.
        • Around here the council decides in a median 63 days (about 9 weeks); 41% are asked for more information.
        What the terms mean 7 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
        • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 27
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.024 Oct 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public24 Oct 2026
        www2.courts.ie—© the publisher23 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
        data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
        services1.arcgis.com—CC BY 4.0—
        transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public24 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.024 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence24 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Sept 2026
        gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 24 Oct 2026, 18:57 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.