PlanningRegister.ie
Planning report · Fingal County Council · 500 m around the house · the last 12 months · 11 Oct 2026, 13:23

Knockabawn, Rush, Rush

53.52051, -6.08083

Homes here mostly date from the 1980s. Most home extensions nearby get approved (89%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1981–1990 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

FINGAL_DP_OWN · — – —

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Rush (471 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Heritage inventory buildings6Sion House; Desio
Radon grid squares3
Protected buildings5Old Kilbush House; Martello Tower
Monuments1Martello tower
EU bird sites1North-West Irish Sea cSPA
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4 on the draft 2027 map; 4 on the final 2026 map.
Sources: zoning, constraints.radon, epa_leap, rzlt, constraints, constraints.flood_cfram, constraints.niah, constraints.rps, constraints.smr, constraints.spa · fetched 4 Oct 2026, 23:11
SourceLicenceFetchedLink
zoningCC-BY-4.04 Oct 2026, 23:11open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
epa_leapCC-BY-4.05 Oct 2026, 23:09open
rzltCC-BY-4.04 Oct 2026, 23:59open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.flood_cframCC-BY-NC-ND-4.0 · not redistributable — shown as a flag only11 Sept 2026, 19:11open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.rpsCC-BY-4.0 (Fingal); public/attribution, unconfirmed (DLR)27 Sept 2026, 19:36open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
constraints.spaCC-BY-4.027 Sept 2026, 19:27open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 10 Oct 2026, 23:46
SourceLicenceFetchedLink
bcmsCC-BY-4.010 Oct 2026, 23:46open
npadCC-BY-4.011 Oct 2026, 01:43open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 81–92% by type. A new house in a garden is harder: 70% approved, and 1 in 2 is asked for more information.

Single-storey rear13 decided · more info asked 8%
92% · council 94%
Attic or dormer21 decided · more info asked 29%
81% · council 90%
New house in a garden or site61 decided · more info asked 46%
70% · council 60%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 95 nearby, 3,672 council-wide

Extensions and refusals right beside you 0 within 250 m · 1 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 1 in the last 12 months

  • F26A/0030 · new house · refused 12 Mar 2026 · 20 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: npad, acp · fetched 11 Oct 2026, 01:43
SourceLicenceFetchedLink
npadCC-BY-4.011 Oct 2026, 01:43open
acpCC-BY-4.09 Oct 2026, 23:03open
Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
SourceLicenceFetchedLink
acpCC-BY-4.09 Oct 2026, 23:03open
bcmsCC-BY-4.010 Oct 2026, 23:46open
npadCC-BY-4.011 Oct 2026, 01:43open
Question 3

How long, and what if someone objects?

Figure 3

A home extension's journey here

A decision takes 54 days. 1 in 4 is asked for more information, which adds about 79 days. Building starts about 5 months after permission.

Comments open: 5 weeks · €20; Council decision: 54 days; Appeal window: 4 weeks; If appealed: +114 days; Building starts: 156 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 50–59 (n=47)54 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 114 days (n=27, all appeals within 1.5 km)+114 daysBuilding startsStart notice: median 156 days after permission (n=29)156 days after permissionSigned off69% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated62 decided home extensions, 29 start notices, 27 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 4

What appeals changed

4 of 12 appealed refusals became permissions. 2 of 16 appealed approvals were reversed.

Refusals appealed12 decided
4 became permissions
Approvals appealed16 decided
2 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Question 4

What's changing around you?

Street map around Knockabawn, Rush, Rush with 7 numbered planning items
⌖ the houseRefusedBuilding startedEmpty land zoned for homesApproved
  1. 1Quay Road, Rush F26A/0030Refused · 20 m
  2. 2Lands off Quay Road, Rush F25A/1015Refused · 156 m
  3. 3104 Tayleurs Point, Rush F23A/0567: ABP 318980-24Building started · 152 m
  4. 40.1 ha zoned for homesEmpty land zoned for homes · 238 m
  5. 50.6 ha zoned for homesEmpty land zoned for homes · 249 m
  6. 60.6 ha zoned for homesEmpty land zoned for homes · 298 m
  7. 7East Shore, Tower Street F26A/0150EApproved · 240 m
Figure 5

What happens to applications within 500 m

Permission isn't building. Of 41 permissions since 2016, 23 show a start notice and 2 have a completion certificate. Most owners opt out of sign-off.

61 applications lodged within 500 m. Council: 42 approved, 11 refused. After appeals: 41 approved. Of those: 2 signed off, 18 built with the owner's opt-out, 3 started, 16 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT42: lodged → approved11: lodged → refused8: lodged → withdrawn or invalid40: approved → approved9: refused → refused8: withdrawn or invalid → withdrawn1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal16: approved → no start notice found18: approved → built, owner opted out3: approved → started, not signed off2: approved → signed off2: approved → ran out61 lodged61 lodged42 approved42 approved11 refused11 refused8 withdrawn or invalid8 withdrawn or invalid41 approved41 approved10 refused10 refused10 withdrawn10 withdrawn16 no start notice found16 no start notice found18 built, owner opted out18 built, owner opted out3 started, not signed off3 started, not signed off2 signed off2 signed off2 ran out2 ran out

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured61 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 6

The next 30 days

Nothing closes within 500 m in the next 30 days.

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 3 within 500 m

    Empty land zoned for homes 3

    • 40.1 ha zoned for homes · no homes built on it yet · 238 m
    • 50.6 ha zoned for homes · no homes built on it yet · 249 m
    • 60.6 ha zoned for homes · no homes built on it yet · 298 m
    Sources: acp, bcms, derelict, moderngov, npad, rzlt · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    derelictCC-BY-4.05 Oct 2026, 09:35open
    moderngovpublic11 Oct 2026, 01:26open
    npadCC-BY-4.011 Oct 2026, 01:43open
    rzltCC-BY-4.04 Oct 2026, 23:59open
    Figure 7

    Applications within 500 m, by year

    Between 2 and 14 a year; busiest 2024. 79% of decisions were approvals.

    2016: 4, 2017: 7, 2018: 4, 2019: 4, 2020: 6, 2021: 2, 2022: 3, 2023: 7, 2024: 14, 2025: 8, 2026: 2051015202016: 4 approved4’16*2017: 7 approved7’172018: 3 approved2018: 1 withdrawn or invalid4’182019: 4 approved4’192020: 4 approved2020: 1 refused2020: 1 withdrawn or invalid6’202021: 1 approved2021: 1 refused2’212022: 2 approved2022: 1 refused3’222023: 3 approved2023: 2 refused2023: 2 withdrawn or invalid7’232024: 9 approved2024: 2 refused2024: 3 withdrawn or invalid14’242025: 4 approved2025: 3 refused2025: 1 withdrawn or invalid8’252026: 1 approved2026: 1 refused2’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 3 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 11 Oct 2026, 01:43
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Oct 2026, 01:43open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    Building work nearby 3 in the last 12 months
    1 not signed off2 no sign-off needed
    • Harbour Road, Rush, Dublin · 26 Jul 2026 · start notice, opted out no sign-off needed · F24A/0626E · 262 m
    • 3104 Tayleurs Point, Rush, Fingal · 14 May 2026 · 4 homes · start notice not signed off · F23A/0567: ABP 318980-24 · 152 m
    • Bawn Road, Rush, Fingal, K56 A729 · 31 Oct 2025 · 1 homes · short notice no sign-off needed · F25A/0581E · 397 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 10 Oct 2026, 23:46
    SourceLicenceFetchedLink
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    St. Joseph's Secondary School48— (2026-Q2)567 m
    Kenure Park——826 m
    Upper Main Street Development6765 built · 2 not started (2026-Q2)998 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Acorns Montessori · Crèche3 Dec 2024 · report · Tusla Early Years Inspectorateapprox. 205 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: dublin_pipeline, npad, schools, tusla_ey · fetched 5 Oct 2026, 23:01
    SourceLicenceFetchedLink
    dublin_pipelineCC-BY-4.05 Oct 2026, 23:01open
    npadCC-BY-4.011 Oct 2026, 01:43open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area Busier than most of Fingal County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here79
    Council middle3
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    npadCC-BY-4.011 Oct 2026, 01:43open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    75% owner-occupied (council 67%).

    Homes built before 1971
    15% · council 11%
    Homes built since 2001
    19% · council 43%
    Owner-occupied
    75% · council 67%
    Rented
    21% · council 28%
    Children under 15
    17% · council 22%
    Aged 65 and over
    12% · council 11%
    Households with 2+ cars
    51% · council 42%
    Work mainly from home
    14% · council 12%
    This small area (439 people)Fingal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267118012

    Bus
    759 m
    Kilbush Lane · 33, 33A, 33X
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    671 m
    St Joseph's Secondary School, 945 pupils
    Homes sold nearby
    15
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • St Joseph's Secondary School · postprimary · 945 pupils · 671 m

    Stops 5

    • Kilbush Lane · 33, 33A, 33X · 5/hour at peak · 759 m
    • Skerries Road · 33, 33A, 33E, 33X, 33n · 3/hour at peak · 770 m
    • Rush Main Street · 33, 33A, 33E, 33X, 33n · 3/hour at peak · 774 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Joseph's Secondary School · 671 m+1.8% pupils (945)

    Open consultations

    Council meetings 30 items

    Public land

    • Fingal County Council · 0.53 ha · 223 m
    • Fingal County Council · 0.11 ha · 234 m
    • Dublin City Council · 0.27 ha · 362 m
    Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
    SourceLicenceFetchedLink
    gtfsCC-BY-4.04 Oct 2026, 23:41open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.011 Oct 2026, 01:43open
    consultpublic11 Oct 2026, 01:25open
    moderngovpublic11 Oct 2026, 01:26open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Rush
    Electoral division
    Rush
    Electoral area
    Rush-Lusk
    Council
    Fingal County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 3 sites nearby could change: 3 empty zoned plots.
    • 1 application refused within 100 m since 2025; latest a new house (2026).
    • No morning-peak service within 500 m; nearest is Kilbush Lane, 759 m away (5 an hour).
    • Here (2022 census): 75% owner-occupied (council 67%); 3% of homes empty (council 5%); most built 1981–1990; 54% drive to work (council 52%); population up 12% since 2016.
    • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
    • Homes started within 1 km: 36 in the last year, 5 three years before.
    • 3 applications nearby in the last 12 months.
    What the terms mean 5 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 33
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.010 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC-BY-NC-ND-4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC-BY-4.0 (Fingal); public/attribution…27 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public11 Oct 2026
    www2.courts.ie—all-rights-reserved11 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC-BY-4.05 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.05 Oct 2026
    esbnetworks.ie—all-rights-reserved (esbnetworks.ie di… · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.04 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public11 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.011 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…11 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.04 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.04 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 11 Oct 2026, 13:23 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.