Planning report · Fingal County Council · 500 m around the house · the last 12 months · 22 Oct 2026, 20:08

Knockabawn

53.52153, -6.08099

Homes here mostly date from the 1980s. Home extensions nearby almost always get approved (90%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1981–1990 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Rush (455 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Heritage inventory buildings6Sion House; Desio
Radon grid squares3
Protected buildings5Old Kilbush House; Martello Tower
Monuments1Martello tower
EU bird sites1North-West Irish Sea cSPA
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4 on the draft 2027 map; 4 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), National Inventory of Architectural Heritage, Records of Protected Structures, Sites and Monuments Record, Special Protection Areas (NPWS) · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Special Protection Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 22 Oct 2026, 02:28
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 85–92% by type. A new house in a garden is harder: 70% approved, and 1 in 2 is asked for more information.

Single-storey rear13 decided · more info asked 8%
92% · council 94%
Attic or dormer26 decided · more info asked 27%
85% · council 90%
New house in a garden or site63 decided · more info asked 46%
70% · council 60%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 102 nearby, 3,662 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 22 Oct 2026, 02:28
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 22 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
    National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 53 days. 1 in 4 is asked for more information, which adds about 74 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; Appeal window: 4 weeks; If appealed: +117 days; Building starts: 142 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–58 (n=54)53 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 117 days (n=30, all appeals within 1.5 km)+117 daysBuilding startsStart notice: median 142 days after permission (n=32)142 days after permissionSigned off69% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated70 decided home extensions, 32 start notices, 30 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    4 of 13 appealed refusals became permissions. 2 of 18 appealed approvals were reversed.

    Refusals appealed13 decided
    4 became permissions
    Approvals appealed18 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Knockabawn with 8 numbered planning items
    ⌖ the houseRefusedBuilding startedEmpty land zoned for homesApproved
    1. 1Quay Road, Rush F26A/0030Refused · 107 m
    2. 2Lands off Quay Road, Rush F25A/1015Refused · 138 m
    3. 3104 Tayleurs Point, Rush F23A/0567: ABP 318980-24Building started · 53 m
    4. 40.6 ha zoned for homesEmpty land zoned for homes · 155 m
    5. 5Harbour Road, Rush F24A/0626EBuilding started · 190 m
    6. 60.1 ha zoned for homesEmpty land zoned for homes · 232 m
    7. 70.6 ha zoned for homesEmpty land zoned for homes · 323 m
    8. 8East Shore, Tower Street F26A/0150EApproved · 234 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 47 permissions since 2016, 27 show a start notice and 4 have a completion certificate. Most owners opt out of sign-off.

    65 applications lodged within 500 m. Council: 48 approved, 11 refused. After appeals: 47 approved. Of those: 4 signed off, 20 built with the owner's opt-out, 3 started, 18 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT48: lodged → approved11: lodged → refused6: lodged → withdrawn or invalid46: approved → approved9: refused → refused6: withdrawn or invalid → withdrawn1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal18: approved → no start notice found20: approved → built, owner opted out3: approved → started, not signed off4: approved → signed off2: approved → ran out65 lodged65 lodged48 approved48 approved11 refused11 refused6 withdrawn or invalid6 withdrawn or invalid47 approved47 approved10 refused10 refused8 withdrawn8 withdrawn18 no start notice found18 no start notice found20 built, owner opted out20 built, owner opted out3 started, not signed off3 started, not signed off4 signed off4 signed off2 ran out2 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured65 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 3 within 500 m

      Empty land zoned for homes 3

      • 40.6 ha zoned for homes · no homes built on it yet · 155 m
      • 60.1 ha zoned for homes · no homes built on it yet · 232 m
      • 70.6 ha zoned for homes · no homes built on it yet · 323 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 22 Oct 2026, 02:38
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
      Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
      Council meetings (ModernGov)Public22 Oct 2026, 02:38open
      National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
      Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
      Figure 7

      Applications within 500 m, by year

      Between 2 and 13 a year; busiest 2024. 81% of decisions were approvals.

      2016: 5, 2017: 7, 2018: 5, 2019: 7, 2020: 6, 2021: 2, 2022: 3, 2023: 7, 2024: 13, 2025: 8, 2026: 2051015202016: 5 approved5’16*2017: 7 approved7’172018: 5 approved5’182019: 7 approved7’192020: 4 approved2020: 1 refused2020: 1 withdrawn or invalid6’202021: 1 approved2021: 1 refused2’212022: 2 approved2022: 1 refused3’222023: 3 approved2023: 2 refused2023: 2 withdrawn or invalid7’232024: 9 approved2024: 2 refused2024: 2 withdrawn or invalid13’242025: 4 approved2025: 3 refused2025: 1 withdrawn or invalid8’252026: 1 approved2026: 1 refused2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 3 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 22 Oct 2026, 02:28
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
      Building work nearby 3 in the last 12 months
      1 not signed off2 no sign-off needed
      • 5Harbour Road, Rush, Dublin · 26 Jul 2026 · start notice, opted out no sign-off needed · F24A/0626E · 190 m
      • 3104 Tayleurs Point, Rush, Fingal · 14 May 2026 · 4 homes · start notice not signed off · F23A/0567: ABP 318980-24 · 53 m
      • Bawn Road, Rush, Fingal, K56 A729 · 31 Oct 2025 · 1 homes · short notice no sign-off needed · F25A/0581E · 453 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 22 Oct 2026, 02:10
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      St. Joseph's Secondary School48— (2026-Q2)577 m
      Kenure Park——763 m
      Upper Main Street Development6765 built · 2 not started (2026-Q2)957 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Acorns Montessori · Crèche3 Dec 2024 · report · Tusla Early Years Inspectorateapprox. 165 m
      Bright Beginners · Crèche24 Mar 2026 · report · Tusla Early Years Inspectorate977 m
      Ros-Eo Community Preschool · Crèche11 Oct 2024 · report · Tusla Early Years Inspectorate983 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 22 Oct 2026, 02:28
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
      National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register21 Oct 2026, 23:37open
      How busy is this area Busier than most of Fingal County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here80
      Council middle3
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 22 Oct 2026, 02:28
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.022 Oct 2026, 02:10open
      National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
      Question 5

      What's the area like?

      Figure 8

      This street block against the council

      75% owner-occupied (council 67%).

      Homes built before 1971
      15% · council 11%
      Homes built since 2001
      19% · council 43%
      Owner-occupied
      75% · council 67%
      Rented
      21% · council 28%
      Children under 15
      17% · council 22%
      Aged 65 and over
      12% · council 11%
      Households with 2+ cars
      51% · council 42%
      Work mainly from home
      14% · council 12%
      This small area (439 people)Fingal

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267118012

      Bus
      708 m
      Kilbush Lane · 33, 33A, 33X
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Flood
      Within 500 m
      OPW flood map area, not beside the house
      Nearest school
      681 m
      St Joseph's Secondary School, 945 pupils
      Homes sold nearby
      16
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • St Joseph's Secondary School · postprimary · 945 pupils · 681 m

      Stops 5

      • Kilbush Lane · 33, 33A, 33X · 5/hour at peak · 708 m
      • Skerries Road · 33, 33A, 33E, 33X, 33n · 3/hour at peak · 719 m
      • Rush Main Street · 33, 33A, 33E, 33X, 33n · 2/hour at peak · 746 m
      • Rush Main Street · 33, 33A, 33X · 5/hour at peak · 773 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Joseph's Secondary School · 681 m+1.8% pupils (945)

      Open consultations

      Council meetings 30 items

      Public land

      • Fingal County Council · 0.53 ha · 126 m
      • Fingal County Council · 0.11 ha · 231 m
      • Dublin City Council · 0.27 ha · 254 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 22 Oct 2026, 02:38
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.022 Oct 2026, 02:28open
      Council consultation portalsPublic22 Oct 2026, 01:44open
      Council meetings (ModernGov)Public22 Oct 2026, 02:38open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Building work started 53 m away: for how long?
        Ask for: The planning conditions for F23A/0567: ABP 318980-24.
        Agent · council
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Rush
      Electoral division
      Rush
      Electoral area
      Rush-Lusk
      Council
      Fingal County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 3 sites nearby could change: 3 empty zoned plots.
      • No morning-peak service within 500 m; nearest is Kilbush Lane, 708 m away (5 an hour).
      • Here (2022 census): 75% owner-occupied (council 67%); 3% of homes empty (council 5%); most built 1981–1990; 54% drive to work (council 52%); population up 12% since 2016.
      • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
      • Homes started within 1 km: 37 in the last year, 5 three years before.
      • 3 applications nearby in the last 12 months.
      • 2 building jobs started within 250 m in the last six months.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 33
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.022 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public22 Oct 2026
      www2.courts.ie—© the publisher21 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public22 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.022 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence22 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 22 Oct 2026, 20:08 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.