Planning report · Fingal County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 22:01

The Mall

53.52225, -6.09012

Homes here mostly date from the 1990s. Most home extensions nearby get approved (86%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
M2
Zoning · Major town centre
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

TC - Town and District Centre: Maintain and build on the accessibility, vitality and viability of the existing Urban Centres in the County. Develop and consolidate these Centres with an appropriate mix of commercial, recreational, cultural, leisure and residential uses, and to enhance and develop the urban fabric of these Centres in accordance with the principles of urban design, conservation and sustainable development. Retail provision will be in accordance with the County Retail Strategy, enhance and develop the existing urban fabric, emphasise urban conservation, and ensure priority for public transport, pedestrians and cyclists while minimising the impact of private car based traffic. In order to deliver this vision and to provide a framework for sustainable development, Urban Centre Strategies will be prepared for centres in accordance with the Urban Fingal Chapter objectives.

ZoningM2 · Major town centre
What it says

TC - Town and District Centre: Protect and enhance the special physical and social character of town and district centres and provide and/ or improve urban facilities

The main town centre — retail, offices, civic uses, apartments.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Protected building2 within 100 m The Thatch; St. Peters
Heritage inventory2 within 100 m house; water pump
Radon1 in 20 homes have high radon (EPA)

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Natural heritage areas1Rogerstown Estuary
Heritage inventory buildings10Sion House; Desio
Radon grid squares3
Protected buildings7Old Kilbush House; The Thatch
EU nature sites1Rogerstown Estuary SAC
Monuments5Well; Ritual site - holy well
EU bird sites2Rogerstown Estuary SPA; North-West Irish Sea cSPA
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 7 on the draft 2027 map; 7 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Natural Heritage Areas (NPWS), Special Areas of Conservation (NPWS), Sites and Monuments Record, Special Protection Areas (NPWS) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
Special Areas of Conservation (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Special Protection Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 79% by type. A new house in a garden is harder: 53% approved, and 1 in 2 is asked for more information.

Attic or dormer29 decided · more info asked 31%
79% · council 92%
New house in a garden or site49 decided · more info asked 41%
53% · council 53%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 78 nearby, 1,612 council-wide

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic10—
Rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 53 days. 1 in 3 is asked for more information, which adds about 74 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; Appeal window: 4 weeks; If appealed: +128 days; Building starts: 131 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 49–55 (n=43)53 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 128 days (n=28, all appeals within 1.5 km)+128 daysBuilding startsStart notice: median 131 days after permission (n=17)131 days after permissionSigned off60% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated63 decided home extensions, 20 start notices, 28 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    4 of 14 appealed refusals became permissions. 1 of 15 appealed approvals were reversed.

    Refusals appealed14 decided
    4 became permissions
    Approvals appealed15 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months

    1 of 1 changed the council's decision

    • 324034 Granted with conditions · Lands east of Kenure Park and west of Goldenridge, Skerries Road,… · 355 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher30 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 4

    What's changing around you?

    Street map around The Mall with 15 numbered planning items
    ⌖ the houseOpen for commentsEmpty land zoned for homesNo decision yetRefusedApproved
    1. 1No. 8 Convent Lane, Rush F26A/0940ENo decision yet · 155 m
    2. 20.6 ha zoned for homesEmpty land zoned for homes · 199 m
    3. 30.6 ha zoned for homesEmpty land zoned for homes · 311 m
    4. 40.1 ha zoned for homesEmpty land zoned for homes · 376 m
    5. 50.6 ha zoned for homesEmpty land zoned for homes · 436 m
    6. 62 The Cottage Hospital, Lower Main Street F26A/0869ENo decision yet · 35 m
    7. 7St. Joseph's Secondary School, Convent Lane F25A/1218ENo decision yet · 186 m
    8. 8Bollum Lane, Rush F26A/0726ENo decision yet · 201 m
    9. 9Site at Kilbush Lane, Rush F25A/1019ERefused · 226 m
    10. 10St. Joseph's Road, Rush F26A/0434EApproved · 253 m
    11. 11Ceol Na Mara, Upper Main Street F26A/0190ENo decision yet · 289 m
    12. 121 Fynes Field, North Beach F26A/0276ENo decision yet · 359 m
    13. 1364 Ormond Avenue, Rush F26A/0403EApproved · 374 m
    14. 14The Jib, Upper Main Street F25A/1189EApproved · 393 m
    15. 15North Beach Caravan Park, North Beach F26A/0547ENo decision yet · 413 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 32 permissions since 2016, 19 show a start notice and 3 have a completion certificate.

    70 applications lodged within 500 m. Council: 34 approved, 14 refused. After appeals: 32 approved. Of those: 3 signed off, 9 built with the owner's opt-out, 7 started, 13 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT34: lodged → approved14: lodged → refused15: lodged → withdrawn or invalid7: lodged → undecided31: approved → approved13: refused → refused15: withdrawn or invalid → withdrawn7: undecided → undecided1 approved by the council, refused after an appeal2 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal13: approved → no start notice found9: approved → built, owner opted out7: approved → started, not signed off3: approved → signed off70 lodged70 lodged34 approved34 approved14 refused14 refused15 withdrawn or invalid15 withdrawn or invalid7 undecided7 undecided32 approved32 approved14 refused14 refused17 withdrawn17 withdrawn7 undecided7 undecided13 no start notice found13 no start notice found9 built, owner opted out9 built, owner opted out7 started, not signed off7 started, not signed off3 signed off3 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured70 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 26 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-26 F26A/0940E: application received — Retention permission for a rear garden gym and storage structure, including the as-built pitched roof, gables, rooflighttoday5 Nov10 Nov15 Nov20 Nov25 Nov30 NovF26A/0940E: application received — Retention permission for a rear garden gym and storage structure, including the as-built pitched roof, gables, rooflight · 155 m away · 2026-11-26
    Comments close
    • Comments close 26 Nov 202626 days left
      1F26A/0940E · application received — Retention permission for a rear garden gym and storage structure, including the as-built pitched…
      €20 to the council · 155 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 4 within 500 m

    Empty land zoned for homes 4

    • 20.6 ha zoned for homes · no homes built on it yet · 199 m
    • 30.6 ha zoned for homes · no homes built on it yet · 311 m
    • 40.1 ha zoned for homes · no homes built on it yet · 376 m
    • 50.6 ha zoned for homes · no homes built on it yet · 436 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 7

    Applications within 500 m, by year

    Between 6 and 20 a year; busiest 2024. 71% of decisions were approvals.

    2021: 8, 2022: 6, 2023: 8, 2024: 20, 2025: 15, 2026: 13051015202021: 7 approved2021: 1 withdrawn or invalid8’21*2022: 3 approved2022: 3 refused6’222023: 5 approved2023: 2 refused2023: 1 withdrawn or invalid8’232024: 11 approved2024: 2 refused2024: 7 withdrawn or invalid20’242025: 6 approved2025: 6 refused2025: 3 withdrawn or invalid15’252026: 2 approved2026: 1 refused2026: 3 withdrawn or invalid2026: 7 undecided13’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 17 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 6 in the last 12 months
    1 signed off as finished2 not signed off3 no sign-off needed
    • Upper Main Street, Rush, Dublin, K56 CR28 · 11 Nov 2026 · 1 homes · start notice, opted out no sign-off needed · F25A/1189E · 405 m
    • 64 Ormond Avenue, Rush, Dublin, K56 AY90 · 21 Sept 2026 · 1 homes · short notice no sign-off needed · F26A0403E · 387 m
    • Skerries Road, Rush, Dublin · 6 Jul 2026 · 35 homes · start notice not signed off · LRD0072/S3E · 258 m
    • Convent Lane, Rush, Fingal · 31 Mar 2026 · 7-day notice not signed off · 267 m
    • Brookfield Oaks, Skerries Road, Rush, Fingal · 19 Jan 2026 · start notice signed off · ABP-316065-23 · 296 m
    • Bawn Road, Rush, Fingal, K56 A729 · 31 Oct 2025 · 1 homes · short notice no sign-off needed · F25A/0581E · 463 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: The Mall.

    Developments within 1.0 km

    SchemeHomesProgressDistance
    St. Joseph's Secondary School48— (2026-Q2)186 m
    Kenure Park——231 m
    Upper Main Street Development6765 built · 2 not started (2026-Q2)353 m
    Goldenridge——627 m
    Brook Lane Development54no activity on site reported (2026-Q1)821 m
    Park Road Development2222 being built (2026-Q2)952 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Bright Beginners · Crèche24 Mar 2026 · report · Tusla Early Years Inspectorate367 m
    Ros-Eo Community Preschool · Crèche11 Oct 2024 · report · Tusla Early Years Inspectorate372 m
    Acorns Montessori · Crèche3 Dec 2024 · report · Tusla Early Years Inspectorateapprox. 771 m
    The Crescent Academy · Crèche14 Jul 2025 · report · Tusla Early Years Inspectorate892 m
    Charlie's Childcare Rush · Crèche12 Nov 2025 · report · Tusla Early Years Inspectorate958 m
    Mill Bank Kids · Crèche17 Apr 2024 · report · Tusla Early Years Inspectorate961 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Fingal County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here180
    Council middle3
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    68% owner-occupied (council 67%).

    Homes built before 1971
    11% · council 11%
    Homes built since 2001
    34% · council 43%
    Owner-occupied
    68% · council 67%
    Rented
    29% · council 28%
    Children under 15
    17% · council 22%
    Aged 65 and over
    9% · council 11%
    Households with 2+ cars
    46% · council 42%
    Work mainly from home
    11% · council 12%
    This small area (389 people)Fingal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267118016

    Bus
    141 m
    Rush Main Street · 33, 33A, 33E · busiest stop within 500 m: 5 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    264 m
    St Joseph's Secondary School, 945 pupils
    Homes sold nearby
    29
    in 3 years, 1 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Joseph's Secondary School · postprimary · 945 pupils · 264 m
    • Rush Ns · primary · 698 pupils · 959 m

    Stops 12

    • Rush Main Street · 33, 33A, 33E, 33X, 33n · 2/hour at peak · 141 m
    • Kilbush Lane · 33, 33A, 33X · 5/hour at peak · 147 m
    • Skerries Road · 33, 33A, 33E, 33X, 33n · 2/hour at peak · 158 m
    • Rush Main Street · 33, 33A, 33X · 5/hour at peak · 168 m
    • Community Centre · 33, 33A, 33X · 5/hour at peak · 415 m
    • Golden Ridge Cresc · 33, 33A, 33E, 33X, 33n · 3/hour at peak · 434 m
    • Rush Main Street · 33, 33A, 33E, 33X, 33n · 2/hour at peak · 459 m
    • Rush Garda Station · 33, 33A, 33X · 5/hour at peak · 666 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Joseph's Secondary School · 264 m+1.8% pupils (945)
    • Rush Ns · 959 m-1.4% pupils (698)

    Council meetings 30 items

    Public land

    • Fingal County Council · 0.21 ha · 382 m
    • Dublin City Council · 0.27 ha · 408 m
    • Fingal County Council · 0.53 ha · 499 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 155 m away open for comments until 26 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Rush
    Electoral division
    Rush
    Electoral area
    Rush-Lusk
    Council
    Fingal County Council
    Everything we found, as a list 8 lines
    • Zoned M2 (major town centre); not protected; no vacant land tax.
    • 4 sites nearby could change: 4 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 26 Nov 2026.
    • Kilbush Lane (bus 33, 33A) 147 m away: 5 an hour at morning peak; 25 from all stops within 500 m.
    • Here (2022 census): 68% owner-occupied (council 67%); 9% of homes empty (council 5%); most built 1991–2000; 56% drive to work (council 52%); population up 12% since 2016.
    • 2 home extensions within 250 m since 2026.
    • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
    • Homes started within 1 km: 39 in the last year, 78 three years before.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 36
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher30 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 22:01 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.