PlanningRegister.ie
Planning report · Fingal County Council · 500 m around the house · the last 12 months · 17 Oct 2026, 12:08

Orlynn Park

53.52257, -6.16340

Homes here mostly date from the 1970s. 2 planning files on this house, the latest from 2022. Most home extensions nearby get approved (86%). A building site 250 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 2 planning files on this house, the latest from 2022.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Orlynn ParkBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2022: F22B/0018 · the development will, approved2022: F21B/0399 · extension, withdrawn or invalid2011: 3 files on Orlynn Park2013: 2 files on Orlynn Park2014: 1 file on Orlynn Park2015: 1 file on Orlynn Park2016: 2 files on Orlynn Park2018: 1 file on Orlynn Park2019: 1 file on Orlynn Park2021: 1 file on Orlynn Park2022: 1 file on Orlynn Park2023: 1 file on Orlynn Park2024: 1 file on Orlynn Park2025: 3 files on Orlynn Park2026: 1 file on Orlynn Park19 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2022
    F22B/0018 · the development will · approved 2022 · started, no sign-off needed
    approvedstartedsigned off?
  2. 2022
    F21B/0399 · extension · withdrawn
    approved?started?signed off?
On this site
R2
Zoning · Existing residential
Yes
Protected or listed · inside the zone around a recorded monument (DU008-010007-)
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Monument zoneOn this site Ritual site - holy well, Lusk; Cremation pit, Lusk
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Lusk (146 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Conservation areas1Lusk ACA
Heritage inventory buildings4Saint MacCullin's Church (Lusk); water pump
Radon grid squares1
Protected buildings4Clay Cottage; Fingal House
Monuments13Round tower; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 8 on the draft 2027 map; 8 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, SMR zones of notification, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, OPW flood maps (CFRAM), National Inventory of Architectural Heritage, Records of Protected Structures, Sites and Monuments Record · fetched 12 Oct 2026, 23:31
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.012 Oct 2026, 23:31open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 86–100% by type. A new house in a garden is harder: 36% approved, and 1 in 3 is asked for more information.

Single-storey rear18 decided · more info asked 0%
100% · council 94%
Single-storey side14 decided · more info asked 43%
86% · council 95%
Attic or dormer23 decided · more info asked 17%
91% · council 90%
New house in a garden or site11 decided · more info asked 36%
36% · council 60%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 66 nearby, 3,955 council-wide

Figure 3

Orlynn Park, file by file since 2011

13 of 14 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

19 planning files on Orlynn Park since 2011, by kind and decision.20112013201520172019202120232025Extensions, atticsNo. 54 · 2011 · attic conversion / dormer · refused · F11B/0010No. 8 · 2011 · garage conversion · approved · F11B/0108No. 14 · 2011 · side · approved · F11B/0164No. 44 · 2013 · two-storey rear · approved · F12B/0215No. 44 · 2013 · side · approved · F13B/0080No. 28 · 2014 · single-storey rear · approved · F14B/0099No. 38 · 2015 · garage conversion · approved · F15B/0008No. 24 · 2016 · side · approved · F16B/0080No. 39 · 2016 · single-storey side · approved · F16B/0122No. 39 · 2018 · single-storey rear · approved · F18B/0217No. 40 · 2019 · garage conversion · approved · F18A/0656No. 136 · 2021 · single-storey side · withdrawn or invalid · F21B/0399No. 65 · 2023 · other extension · approved · F23A/0251No. 149 · 2025 · attic conversion / dormer · approved · F25A/1136ENo. 11 · 2025 · single-storey side · approved · F25A/1177EPorches, roofs, otherNo. 136 · 2022 · other work · approved · F22B/0018No. 20 · 2024 · other work · approved · F24A/0521No number · 2026 · other work · undecided · F26A/0406ENew house in a side gardenNo. 90 · 2025 · new house · approved · F25A/0191E90
ApprovedRefusedWithdrawn or invalid

19 files with "Orlynn Park" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2011–2026

Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m

Extensions and refusals near you 4 extensions within 250 m · the last 12 months

4 approved
KindAppliedApprovedRefused
Dormer or attic22—
Garage conversion11—
Two-storey side11—

On Orlynn Park: 10 extensions in 10 years, 79% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 54 days. 1 in 4 is asked for more information, which adds about 48 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 54 days; If more info asked (1 in 4): 73 days; Appeal window: 4 weeks; If appealed: +127 days; Building starts: 118 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 49–55 (n=68)54 daysIf more info asked (1 in 4)With further information: median 73 days (n=8)73 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 127 days (n=22, all appeals within 1.5 km)+127 daysBuilding startsStart notice: median 118 days after permission (n=36)118 days after permissionSigned off47% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated88 decided home extensions, 36 start notices, 22 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    9 of 16 appealed refusals became permissions. 1 of 6 appealed approvals were reversed.

    Refusals appealed16 decided
    9 became permissions
    Approvals appealed6 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 4 in the last 12 months

    1 of 2 changed the council's decision

    • 502142 Pending · Forge Green, The Forge, Lusk, County Dublin · 331 m
    • 501518 Refused · St Elmo's, Barrack Lane, Lusk, Co. Dublin, K45 R650 · 367 m report
    • 501566 Open · Forge Green, The Forge, Lusk, County Dublin · 331 m
    • 500793 Granted with conditions · Sexton Cottage, Dublin Road, Lusk,, Co. Dublin., K45 T389 · 188 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher17 Oct 2026, 01:34open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 4

    What's changing around you?

    Street map around Orlynn Park with 15 numbered planning items
    ⌖ the houseBuilding site that stoppedAppealBuilding startedEmpty land zoned for homesNo decision yetApprovedRefused
    1. 1Station Road, Lusk F15A/0565Building site that stopped · 250 m
    2. 2Sexton Cottage, Dublin Road 500793Appeal: approved with conditions · 188 m
    3. 3149 Orlynn Park, Lusk F25A/1136EBuilding started · 129 m
    4. 419 Forge Avenue, Lusk F26A/0249EBuilding started · 193 m
    5. 50.5 ha zoned for homesEmpty land zoned for homes · 324 m
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 352 m
    7. 70.6 ha zoned for homesEmpty land zoned for homes · 364 m
    8. 80.4 ha zoned for homesEmpty land zoned for homes · 365 m
    9. 90.5 ha zoned for homesEmpty land zoned for homes · 482 m
    10. 10In the townlands of Racecourse Common & Ballough, South of Orlynn Park F26A/0406ENo decision yet · 170 m
    11. 1111 The Grove, Orlynn Park F25A/1177EApproved · 240 m
    12. 1232 Orylnn Park, Lusk F25A/1197EApproved · 243 m
    13. 13located in the townland of Racecourse Common, South of the Rathmore Ro F26A/0277ENo decision yet · 252 m
    14. 14Station Road, Lusk F26A/0461EApproved · 280 m
    15. 15Forge Green, The Forge F26A/0573ERefused · 331 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 52 permissions since 2016, 22 show a start notice and 11 have a completion certificate.

    81 applications lodged within 500 m. Council: 49 approved, 14 refused. After appeals: 52 approved. Of those: 11 signed off, 4 built with the owner's opt-out, 7 started, 29 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT49: lodged → approved14: lodged → refused15: lodged → withdrawn or invalid3: lodged → undecided49: approved → approved10: refused → refused15: withdrawn or invalid → withdrawn3: undecided → undecided3 refused by the council, approved after an appeal1 refused by the council, undecided after an appeal29: approved → no start notice found4: approved → built, owner opted out7: approved → started, not signed off11: approved → signed off1: approved → ran out81 lodged81 lodged49 approved49 approved14 refused14 refused15 withdrawn or invalid15 withdrawn or invalid3 undecided3 undecided52 approved52 approved10 refused10 refused15 withdrawn15 withdrawn4 undecided4 undecided29 no start notice found29 no start notice found4 built, owner opted out4 built, owner opted out7 started, not signed off7 started, not signed off11 signed off11 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured81 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 29 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-29 ACP 501518: Refuse permissiontoday22 Oct27 Oct1 Nov6 Nov11 Nov16 NovACP 501518: Refuse permission · 367 m away · 2026-10-29
    High Court window ends
    • Time to ask the High Court for a review ends 29 Oct 202612 days left
      Refuse permission
      367 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    1 building site nearby stopped before sign-off.

    Station Road, Lusk · 141 homes: 141 homes, started Sep 2018, never signed off20182019202020212022202320242025202620272028Station Road, Lusk · 141 homes250 m · F15A/0565141 homes, started Sep 2018, never signed off141 homes, started Sep 2018, never signed offtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 7 within 500 m

    Building site that stopped 1

    Empty land zoned for homes 6

    • 50.5 ha zoned for homes · no homes built on it yet · 324 m
    • 60.2 ha zoned for homes · no homes built on it yet · 352 m
    • 70.6 ha zoned for homes · no homes built on it yet · 364 m
    • 80.4 ha zoned for homes · no homes built on it yet · 365 m
    • 90.5 ha zoned for homes · no homes built on it yet · 482 m
    • 0.3 ha zoned for homes · no homes built on it yet · 489 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 17 Oct 2026, 02:12
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    Council meetings (ModernGov)Public17 Oct 2026, 02:12open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
    Figure 9

    Applications within 500 m, by year

    Between 2 and 13 a year; busiest 2025. 78% of decisions were approvals.

    2016: 2, 2017: 2, 2018: 8, 2019: 6, 2020: 9, 2021: 7, 2022: 7, 2023: 6, 2024: 12, 2025: 13, 2026: 9051015202016: 2 approved2’16*2017: 2 approved2’172018: 4 approved2018: 4 withdrawn or invalid8’182019: 5 approved2019: 1 refused6’192020: 6 approved2020: 1 refused2020: 2 withdrawn or invalid9’202021: 4 approved2021: 2 refused2021: 1 withdrawn or invalid7’212022: 6 approved2022: 1 withdrawn or invalid7’222023: 4 approved2023: 1 refused2023: 1 withdrawn or invalid6’232024: 7 approved2024: 2 refused2024: 3 withdrawn or invalid12’242025: 6 approved2025: 4 refused2025: 3 withdrawn or invalid13’252026: 3 approved2026: 3 refused2026: 3 undecided9’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 12 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Building work nearby 6 in the last 12 months
    3 not signed off3 no sign-off needed
    • 419 Forge Avenue, Lusk, Dublin, K45 XH75 · 3 Aug 2026 · short notice no sign-off needed · F26A/0249E · 193 m
    • 3149 Orlynn Park, Lusk, Dublin, K45 N720 · 27 Jul 2026 · short notice no sign-off needed · F25A/1136E · 129 m
    • 15, 17, 19 Ashe Street, Lusk, Dublin · 20 Jul 2026 · 7-day notice not signed off · F24A/1141E · 332 m
    • 13 Ashe Street, Lusk, Dublin · 22 Jun 2026 · 12 homes · 7-day notice not signed off · F24A/1141E · 317 m
    • Ashe Street / Station Road, Lusk, Fingal · 25 May 2026 · 23 homes · start notice not signed off · F24A/1141E · 321 m
    • 2 Forge Court, Lusk, Fingal, K45 TH76 · 25 Feb 2026 · 1 homes · short notice no sign-off needed · F25A/0477E · 329 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 17 Oct 2026, 01:09
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Orlynn Park · 18 applications in 10 years · 79% approved · most common: attic conversion / dormer

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Lands at Station Road, Lusk3535 not started (2026-Q2)237 m
    Racecourse Common24no activity on site reported (2026-Q2)252 m
    Station Road, Lusk181181 built (2025-Q4)318 m

    Who applies most nearby

    • Dwyer Nolan Developments Ltd — 4 applications, latest 1 Jul 2026

    Crèches and schools inspected

    NameLatest inspectionDistance
    Naionra Montessori Lusca · Crèche20 Apr 2026 · report · Tusla Early Years Inspectorate281 m
    Just Like Home · Crèche11 May 2026 · report · Tusla Early Years Inspectorate641 m
    ButterFlies Creche & Montessori · Crèche27 May 2025 · report · Tusla Early Years Inspectorate642 m
    Precious Days Montessori · Crèche4 Mar 2025 · report · Tusla Early Years Inspectorate777 m
    Bambi's Land Montessori & ASD Play school · Crèche15 Jan 2025 · report · Tusla Early Years Inspectorate804 m
    Little Scholars Montessori & Childcare Limited · Crèche8 Jan 2026 · report · Tusla Early Years Inspectorate869 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.012 Oct 2026, 23:02open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Applicant organisations (from the CRO)Derived by Planning Register11 Oct 2026, 23:05—
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Fingal County Council.
    Homes approved
    Here23
    Council middle0
    Homes started
    Here42
    Council middle3
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    90% owner-occupied (council 67%).

    Homes built before 1971
    5% · council 11%
    Homes built since 2001
    0% · council 43%
    Owner-occupied
    90% · council 67%
    Rented
    6% · council 28%
    Children under 15
    15% · council 22%
    Aged 65 and over
    23% · council 11%
    Households with 2+ cars
    62% · council 42%
    Work mainly from home
    16% · council 12%
    This small area (278 people)Fingal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267104008

    Bus
    257 m
    Orlynn Park · 33, 33A, 33X · busiest stop within 500 m: 5 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    795 m
    S N Lusca, 413 pupils
    Homes sold nearby
    312
    in 3 years, 294 new (Property Price Register)
    Schools, stops and the council

    Schools

    • S N Lusca · primary · 413 pupils · 795 m
    • Lusk Junior National School St Maccullins · primary · 366 pupils · 795 m
    • Rush and Lusk Educate Together NS · primary · 393 pupils · 829 m
    • Lusk Community College · postprimary · 1104 pupils · 951 m

    Stops 11

    • Orlynn Park · 33, 33A, 33X · 5/hour at peak · 257 m
    • Orlynn Park · 33, 33A, 33E, 33X, 33n · 2/hour at peak · 278 m
    • Barrack Lane · 33, 33A, 33X · 5/hour at peak · 292 m
    • Barrack Lane · 33, 33A, 33E, 33T, 33X, 33n · 2/hour at peak · 308 m
    • Station Road · 33, 33A, 33E, 33T, 33X, 33n · 2/hour at peak · 314 m
    • Station Road · 33, 33A, 33X · 5/hour at peak · 324 m
    • Racecourse Commons · 33, 33A, 33E, 33T, 33X, 33n · 2/hour at peak · 609 m
    • Racecourse Commons · 33, 33A, 33X · 5/hour at peak · 613 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N Lusca · 795 m-0.7% pupils (413)
    • Lusk Junior National School St Maccullins · 795 m-4.2% pupils (366)
    • Rush and Lusk Educate Together NS · 829 m-4.1% pupils (393)
    • Lusk Community College · 951 m+2.1% pupils (1,104)

    Open consultations

    Council meetings 30 items

    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 17 Oct 2026, 02:12
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Council consultation portalsPublic17 Oct 2026, 01:36open
    Council meetings (ModernGov)Public17 Oct 2026, 02:12open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. The development will (F22B/0018) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    2. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    3. Stalled build 250 m away (Station Road, Lusk): what happens next?
      Ask for: The planning file for F15A/0565.
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Lusk
    Electoral division
    Lusk
    Electoral area
    Rush-Lusk
    Council
    Fingal County Council
    Everything we found, as a list 8 lines
    • 2 applications on this site; latest F22B/0018, approved 2022, started, no sign-off needed.
    • Zoned R2 (existing residential); monument zone; no vacant land tax.
    • 7 sites nearby could change: 1 stalled build, 6 empty zoned plots.
    • Orlynn Park (bus 33, 33A) 257 m away: 5 an hour at morning peak; 23 from all stops within 500 m.
    • Here (2022 census): 90% owner-occupied (council 67%); 3% of homes empty (council 5%); most built 1971–1980; 58% drive to work (council 52%); population up 12% since 2016.
    • 4 home extensions within 250 m since 2025. Most were dormers or attic conversions. On Orlynn Park: 10 in 10 years, 79% approved.
    • Around here the council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • 2 appeals nearby decided in the last 12 months; 1 turned a refusal into a yes.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 38
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.017 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public17 Oct 2026
    www2.courts.ie—© the publisher17 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.012 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.012 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public17 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.017 Oct 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register11 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence17 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    water.ie—© the publisher · flag only—
    water.ie—© the publisher · flag only—
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 17 Oct 2026, 12:08 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.