PlanningRegister.ie
Planning report · Westmeath County Council · 2000 m around the house · the last 12 months · 17 Oct 2026, 14:40

Mary Street

53.52631, -7.34494

Homes here mostly date from before 1919. 1 planning file on this house, the latest from 2021. Home extensions nearby almost always get approved (91%). 278 homes approved 1.4 km away haven't started.

See on the mapWatch this area

Not held yet for Westmeath County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 1 planning file on this house, the latest from 2021.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 1 planning file on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of MullingarBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2021: 2165 · garden room, approved2017: 12 files on Mullingar2018: 8 files on Mullingar2019: 15 files on Mullingar2020: 7 files on Mullingar2021: 11 files on Mullingar2022: 15 files on Mullingar2023: 10 files on Mullingar2024: 11 files on Mullingar2025: 16 files on Mullingar2026: 3 files on Mullingar108 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    2165 · garden room · approved 2021 · ran out unbuilt
    approvedstartedsigned off
On this site
Yes
Protected or listed · a protected building; a building in the national heritage inventory (15310164)
No
Vacant land tax · lived-in homes don't pay it
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Protected buildingOn this site on the council's record (not republished); on the council's record (not republished)
Heritage inventoryOn this site Bethany; house

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Soltec (Ireland) Limited (469 m); Data Packaging Ltd. (584 m); Taconic International Ltd. (786 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings226bridge; post box
Monuments52R165398; R165400
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 59 on the draft 2027 map; 50 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 12 Oct 2026, 23:31
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA licensed facilities (LEAP)CC BY 4.012 Oct 2026, 23:31open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
Question 2

Could you extend?

This is a protected building: almost any change, inside or out, needs permission.

Figure 2

What happened to applications like yours

Extensions here: 82–100% by type. A new house in a garden is harder: 75% approved, and 1 in 3 is asked for more information.

Single-storey rear19 decided · more info asked 37%
89% · council 98%
Two-storey rear16 decided · more info asked 56%
100% · council 94%
Attic or dormer11 decided · more info asked 27%
82% · council 93%
First-floor15 decided · more info asked 20%
93% · council 93%
New house in a garden or site8 decided · more info asked 38%
75% · council 82%
Approved nearbyWestmeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 69 nearby, 1,899 council-wide

Figure 3

Mullingar, file by file since 2017

17 of 19 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 3.

108 planning files on Mullingar since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2018 · other extension · approved · 186345No number · 2019 · other extension · approved · 196295No. 17 · 2019 · rear · refused · 196304No. 5 · 2021 · two-storey rear · approved · 21103No. 5 · 2021 · two-storey rear · approved · 2165No number · 2022 · porch / front · approved · 22507No number · 2022 · first-floor · approved · 22541No. 5 · 2023 · first-floor · approved · 2360135No number · 2024 · other extension · approved · 2460035No. 44 · 2024 · first-floor · approved · 2460293No. 3 · 2024 · two-storey rear · approved · 2460335No number · 2024 · garage conversion · approved · 2460452No number · 2024 · other extension · approved · 2473No. 40 · 2025 · rear · approved · 2560083No. 5 · 2025 · first-floor · refused · 2560113No. 56 · 2025 · rear · approved · 2560374No. 5 · 2025 · single-storey rear · approved · 2560465No. 7 · 2025 · two-storey rear · approved · 2560527No. 6 · 2026 · garage conversion · approved · 2660242Porches, roofs, otherNo number · 2017 · other work · approved · 176006No number · 2017 · other work · approved · 176055No. 34 · 2017 · other work · approved · 176073No. 2 · 2017 · other work · approved · 176075No number · 2017 · other work · approved · 176077No number · 2017 · other work · approved · 176165No number · 2017 · other work · approved · 176174No number · 2017 · other work · approved · 176211No. 6 · 2017 · other work · approved · 176288No. 3 · 2017 · other work · approved · 176319No. 5 · 2017 · other work · approved · 176325No number · 2017 · other work · approved · 176365No. 2 · 2018 · other work · approved · 186062No number · 2018 · other work · approved · 186080No. 21 · 2018 · other work · approved · 186094No. 2 · 2018 · other work · approved · 186158No. 3 · 2018 · other work · refused · 186251No. 4 · 2018 · other work · approved · 186252No. 34 · 2018 · other work · approved · 186257No. 17 · 2019 · other work · approved · 196005No number · 2019 · other work · approved · 196025No. 5 · 2019 · other work · approved · 196036No. 23 · 2019 · other work · approved · 196050No number · 2019 · other work · approved · 196118No. 3 · 2019 · other work · approved · 196142No. 10 · 2019 · other work · approved · 196144No. 1 · 2019 · other work · refused · 196171No number · 2019 · other work · approved · 196195No. 19 · 2019 · other work · approved · 196237No. 11 · 2019 · other work · approved · 196254No number · 2019 · other work · approved · 196310No. 30 · 2019 · other work · approved · 196323No number · 2020 · other work · approved · 206011No. 23 · 2020 · other work · approved · 206028No. 32 · 2020 · other work · approved · 206048No. 2 · 2020 · other work · approved · 206108No number · 2020 · other work · approved · 206285No. 2 · 2021 · other work · approved · 21177No number · 2021 · other work · approved · 21266No. 41 · 2021 · other work · approved · 21308No. 6 · 2021 · other work · approved · 21311No. 1 · 2021 · other work · refused · 21336No. 25 · 2021 · other work · approved · 21345No number · 2021 · other work · approved · 21501No. 4 · 2021 · other work · approved · 21618No number · 2021 · other work · approved · 21631No number · 2022 · other work · refused · 22136No number · 2022 · other work · refused · 22235No. 23 · 2022 · other work · approved · 2226No number · 2022 · other work · approved · 22298No. 28A · 2022 · other work · approved · 22304No number · 2022 · other work · approved · 2235No number · 2022 · other work · refused · 2241No. 38 · 2022 · other work · approved · 22437No number · 2022 · other work · approved · 22464No number · 2022 · other work · approved · 22542No. 2 · 2022 · other work · refused · 22545No number · 2022 · other work · approved · 22560No. 22 · 2022 · other work · approved · 2260032No number · 2023 · other work · approved · 23110No number · 2023 · other work · approved · 23134No number · 2023 · other work · approved · 2341No. 16 · 2023 · other work · approved · 2358No. 2 · 2023 · other work · approved · 2360025No. 9 · 2023 · other work · approved · 2360225No. 52 · 2023 · other work · approved · 2360244No. 8 · 2023 · other work · approved · 2360362No. 17 · 2023 · other work · approved · 2385No. 3A · 2024 · other work · approved · 2460176No. 17 · 2024 · other work · approved · 2460316No number · 2024 · other work · approved · 2460325No. 33 · 2024 · other work · approved · 2460363No number · 2024 · first-floor · approved · 2460407No number · 2024 · other work · approved · 2460421No number · 2025 · other work · approved · 2528No number · 2025 · other work · approved · 2541No number · 2025 · other work · refused · 2560062No number · 2025 · other work · approved · 2560132No number · 2025 · other work · refused · 2560135No number · 2025 · other work · refused · 2560227No number · 2025 · other work · approved · 2560286No number · 2025 · other work · approved · 2560356No number · 2025 · other work · refused · 2560484No number · 2025 · other work · approved · 2560513No. 15 · 2025 · other work · approved · 2560554No number · 2026 · other work · approved · 2660218New house in a side gardenNo. 3 · 2020 · new house · approved · 2060653No. 10 · 2020 · new house · approved · 206139No. 4 · 2026 · new house · refused · 26601834
ApprovedRefusedWithdrawn or invalid

108 files with "Mullingar" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 3 is asked for more information, which adds about 88 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 3): 141 days; Appeal window: 4 weeks; Building starts: 104 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–55 (n=84)53 daysIf more info asked (1 in 3)With further information: median 141 days (n=37)141 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 104 days after permission (n=46)104 days after permissionSigned off294 days after the start, for the few who file. 63% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated121 decided home extensions, 46 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 4 appealed refusals became permissions. 3 of 3 appealed approvals were reversed.

    Refusals appealed4 decided
    0 became permissions
    Approvals appealed3 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501836 Invalid · Saunders Bridge , Ardmore Road Ballinderry Td. , Mullingar Co.… · 969 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher17 Oct 2026, 01:34open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 4

    What's changing around you?

    Street map around Mary Street with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not started
    1. 114 St. Loman’s Terrace, Mullingar 2660493No decision yet · 331 m
    2. 21 Lynn Road, Mullingar 2660498No decision yet · 646 m
    3. 342 Clonmore Heights, Mullingar 2660507No decision yet · 996 m
    4. 4Charter Medical Private Hospital, Ballinderry 2660517No decision yet · 1.4 km
    5. 5Zone C, Mullingar Business Park 2660511No decision yet · 1.6 km
    6. 6101 Chestnut Drive, Balinderry Mullingar 2660502No decision yet · 1.7 km
    7. 7Zone C Mullingar Business Park, Mullingar 2660026Approved with conditions · 1.6 km
    8. 8Mount Lynn, Mullingar 2660106Approved with conditions · 1.9 km
    9. 939 & 41 Oliver Plunkett Street 21308Approved, not started, approval runs out within a year · 212 m
    10. 10Spout Well Lane 2235Approved, no sign building has started · 448 m
    11. 11Robinstown 2360056Approved, no sign building has started · 925 m
    12. 12Saunders Bridge 2560495Approved, no sign building has started · 1.1 km
    13. 13Robinstown and Robinstown 21680Approved, no sign building has started · 1.3 km
    14. 14Rathgowan or Farranshock 2660222Approved, no sign building has started · 1.4 km
    15. 15Ballinderry Road 2560084Approved, no sign building has started · 1.9 km
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 87 permissions since 2016, 31 show a start notice and 17 have a completion certificate.

    95 applications lodged within 500 m. Council: 87 approved, 8 refused. After appeals: 87 approved. Of those: 17 signed off, 2 built with the owner's opt-out, 12 started, 30 with no start notice found, 26 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT87: lodged → approved8: lodged → refused87: approved → approved8: refused → refused30: approved → no start notice found2: approved → built, owner opted out12: approved → started, not signed off17: approved → signed off26: approved → ran out95 lodged95 lodged87 approved87 approved8 refused8 refused87 approved87 approved8 refused8 refused30 no start notice found30 no start notice found2 built, owner opted out2 built, owner opted out12 started, not signed off12 started, not signed off17 signed off17 signed off26 ran out26 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured95 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    8 deadlines within 2.0 km; the first closes 21 Oct 2026.

    8 deadlines in the next 30 days: 2026-10-21 2660106: CONDITIONAL — development that will consists of the demolition of the existing conservatory to rear of existing dwelling with new two ; 2026-10-21 2660493: application received — construction of an extension at the rear of my existing building on the first floor to include an office, landing & w.c.; 2026-10-23 2660498: application received — retention permission to retain my existing garage at the rear of my dwelling house to include on ground floor, garage ar; 2026-10-27 2660502: application received — development which will consist of an extension to the side and rear of the existing dwelling, this will include a new lo; 2026-10-27 2660507: application received — the following development 1. to retain the existing extension to the side of our dwelling to include living room, wet ro; 2026-10-28 2660511: application received — The development will consist of modifications and additions to the development previously permitted under Reg. Ref. 2560; 2026-10-30 2660517: application received — development which will consist of alterations to previously approved hospital extension granted planning under ref: 23/6; 2026-10-30 2660026: CONDITIONAL — development which will consist of (A) the construction of 2 no. industrial units containing office & warehousing spacetoday22 Oct27 Oct1 Nov6 Nov11 Nov16 Nov2660106: CONDITIONAL — development that will consists of the demolition of the existing conservatory to rear of existing dwelling with new two · 1.9 km away · 2026-10-212660493: application received — construction of an extension at the rear of my existing building on the first floor to include an office, landing & w.c. · 331 m away · 2026-10-212660498: application received — retention permission to retain my existing garage at the rear of my dwelling house to include on ground floor, garage ar · 646 m away · 2026-10-232660502: application received — development which will consist of an extension to the side and rear of the existing dwelling, this will include a new lo · 1.7 km away · 2026-10-272660507: application received — the following development 1. to retain the existing extension to the side of our dwelling to include living room, wet ro · 996 m away · 2026-10-272660511: application received — The development will consist of modifications and additions to the development previously permitted under Reg. Ref. 2560 · 1.6 km away · 2026-10-282660517: application received — development which will consist of alterations to previously approved hospital extension granted planning under ref: 23/6 · 1.4 km away · 2026-10-302660026: CONDITIONAL — development which will consist of (A) the construction of 2 no. industrial units containing office & warehousing space · 1.6 km away · 2026-10-30
    Comments closeTime to appeal ends
    • Time to appeal ends 21 Oct 20264 days left
      82660106 · CONDITIONAL — development that will consists of the demolition of the existing conservatory to rear of existing…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.9 km away
    • Comments close 21 Oct 20264 days left
      12660493 · application received — construction of an extension at the rear of my existing building on the first floor to include…
      €20 to the council · 331 m away
    • Comments close 23 Oct 20266 days left
      22660498 · application received — retention permission to retain my existing garage at the rear of my dwelling house to include on…
      €20 to the council · 646 m away
    • Comments close 27 Oct 202610 days left
      62660502 · application received — development which will consist of an extension to the side and rear of the existing dwelling,…
      €20 to the council · 1.7 km away
    • Comments close 27 Oct 202610 days left
      32660507 · application received — the following development 1. to retain the existing extension to the side of our dwelling to…
      €20 to the council · 996 m away
    • Comments close 28 Oct 202611 days left
      52660511 · application received — The development will consist of modifications and additions to the development previously…
      €20 to the council · 1.6 km away
    • Comments close 30 Oct 202613 days left
      42660517 · application received — development which will consist of alterations to previously approved hospital extension granted…
      €20 to the council · 1.4 km away
    • Time to appeal ends 30 Oct 202613 days left
      72660026 · CONDITIONAL — development which will consist of (A) the construction of 2 no. industrial units containing office &…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.6 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    278 homes 1.4 km away were approved Oct 2026 with no start notice yet; the permission runs to Oct 2031. 4 building sites nearby stopped before sign-off.

    Rathgowan or Farranshock · 278 homes: 278 homes approved Oct 2026, not started; Ballinderry Road · 117 homes: 117 homes approved Jul 2025, not started; Robinstown and Robinstown · 81 homes: 81 homes approved Feb 2023, not started; Saunders Bridge · 73 homes: 73 homes approved Aug 2026, not started2023202420252026202720282029203020312032Rathgowan or Farranshock · 278 homes1.4 km · 2660222278 homes approved Oct 2026, not started278 homes approved Oct 2026, not startedBallinderry Road · 117 homes1.9 km · 2560084117 homes approved Jul 2025, not started117 homes approved Jul 2025, not startedRobinstown and Robinstown · 81 homes1.3 km · 2168081 homes approved Feb 2023, not started81 homes approved Feb 2023, not startedSaunders Bridge · 73 homes1.1 km · 256049573 homes approved Aug 2026, not started73 homes approved Aug 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 21 within 2.0 km

    Building site that stopped 4

    Approved, not started, approval running out 1

    Approved, not started 6

    Empty land zoned for homes 10

    • 1.1 ha zoned for homes · no homes built on it yet · 298 m
    • 1.6 ha zoned for homes · no homes built on it yet · 406 m
    • 0.2 ha zoned for homes · no homes built on it yet · 415 m
    • 0.6 ha zoned for homes · no homes built on it yet · 523 m
    • 0.9 ha zoned for homes · no homes built on it yet · 534 m
    • 0.3 ha zoned for homes · no homes built on it yet · 571 m
    • 0.3 ha zoned for homes · no homes built on it yet · 583 m
    • 1.8 ha zoned for homes · no homes built on it yet · 621 m
    • 1.0 ha zoned for homes · no homes built on it yet · 634 m
    • 5.6 ha zoned for homes · no homes built on it yet · 803 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
    Figure 9

    Applications within 500 m, by year

    Between 7 and 14 a year; busiest 2019. 92% of decisions were approvals.

    2017: 12, 2018: 7, 2019: 14, 2020: 7, 2021: 10, 2022: 14, 2023: 9, 2024: 9, 2025: 12, 2026: 1051015202017: 12 approved12’17*2018: 7 approved7’182019: 13 approved2019: 1 refused14’192020: 7 approved7’202021: 10 approved10’212022: 11 approved2022: 3 refused14’222023: 9 approved9’232024: 9 approved9’242025: 8 approved2025: 4 refused12’252026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 69 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Building work nearby 31 in the last 12 months
    2 signed off as finished21 not signed off8 no sign-off needed
    • 4 Zone A, Mullingar, Westmeath · 11 Sept 2026 · 7-day notice not signed off · 2660293 · 656 m
    • 25 Gort Na Dtobar, Mullingar, Westmeath · 30 Jul 2026 · 1 homes · start notice not signed off · 21568 · 1.7 km
    • Springfield Cottages, Mullingar, Westmeath · 1 Jul 2026 · 9 homes · start notice not signed off · 21616 · 921 m
    • 26 Gort NaDtobar, Irish Town, Mullingar, Westmeath · 5 Jun 2026 · 1 homes · start notice not signed off · 21568 · 1.7 km
    • 22 Gort Na Dtobar, Irishtown, Mullingar, Westmeath · 18 May 2026 · 1 homes · start notice, opted out no sign-off needed · 21568 · 1.7 km
    • 21 Gort Na Dtobar, Irishtown, Mullingar, Westmeath · 18 May 2026 · 1 homes · start notice, opted out no sign-off needed · 21568 · 1.8 km
    • Pettiswood, Mullingar, Westmeath · 12 May 2026 · 45 homes · start notice not signed off · 24/60376 ABP-321494-24 · 1.9 km
    • Ballinderry, Mullingar, Westmeath, N91 A7P0 · 6 May 2026 · 1 homes · start notice not signed off · 2560461 · 1.0 km
    • 12 Austin Friars Street, Mullingar, Westmeath, N91 Y6P2 · 1 May 2026 · 6 homes · 7-day notice not signed off · 473 m
    • Ardmore Road, Mullingar, Westmeath · 30 Apr 2026 · 104 homes · start notice not signed off · 25/60259 · 1.8 km
    • Kilcumny, Barbavilla, Collinstown, Mullingar, Westmeath · 27 Apr 2026 · start notice not signed off · 24/60273 · 217 m
    • 33 Sráid an Phiarsaigh, An Muileann gCearr, Westmeath, N91 X9RN · 16 Apr 2026 · 7-day notice not signed off · 2460363 · 273 m
    • 3 Mount Street, Mullingar, Westmeath, N91 NX73 · 16 Apr 2026 · 7-day notice not signed off · 256 m
    • 15/17 Oliver Plunkett Street, Mullingar, Westmeath, N91 Y049 · 30 Mar 2026 · 1 homes · start notice not signed off · 24/60316 · 202 m
    • 18 Lynn Avenue, Mullingar, Westmeath, N91 F7D4 · 27 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60568 · 894 m
    • 15 Harbour Street, Mullingar, Westmeath, N91 W9X7 · 24 Mar 2026 · short notice no sign-off needed · 2560554 · 371 m
    • Ardmore Road, Mullingar, Westmeath · 20 Mar 2026 · 104 homes · start notice not signed off · 25/60259 · 1.8 km
    • College Street, Mullingar, Westmeath · 5 Mar 2026 · 7 homes · 7-day notice not signed off · 23134 · 167 m
    • College Street, Mullingar, Westmeath · 26 Feb 2026 · 7 homes · start notice not signed off · 23134 · 169 m
    • 11 Cathedral View, Mullingar, Westmeath, N91 E2N8 · 6 Feb 2026 · 1 homes · start notice not signed off · 283 m
    • Ardmore Road, Mullingar, Westmeath · 3 Feb 2026 · 104 homes · start notice not signed off · 25/60259 · 1.8 km
    • 2 Ballinderry, Mullingar, Westmeath, N91 F5F2 · 30 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 2560096 · 1.0 km
    • Ballinderry, Mullingar, Westmeath, N91Y4E6 · 4 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 25/60052 · 984 m
    • Bellview, Mullingar, Westmeath · 1 Dec 2025 · 7-day notice signed off · 1.2 km
    • Grand Parade, Mullingar, Westmeath, N91 KN28 · 24 Nov 2025 · 7-day notice signed off · 340 m
    • 7 Gort Na Dtobar Irishtown, Mullingar, Westmeath · 19 Nov 2025 · short notice no sign-off needed · 2460359 · 1.9 km
    • Longford Road, Mullingar, Westmeath, N91 N602​ · 19 Nov 2025 · start notice not signed off · 1.1 km
    • Longford Road, Mullingar, Westmeath, N91 NA43 · 19 Nov 2025 · start notice not signed off · ​24-60149 · 912 m
    • 10 Gort Na Dtobar Irishtown, Mullingar, Westmeath · 19 Nov 2025 · short notice no sign-off needed · 2460357 · 1.9 km
    • Longford Road, Mullingar, Westmeath, N91 NA43 · 19 Nov 2025 · start notice not signed off · ​24-60149 · 912 m
    • Ardmore Road, Mullingar, Westmeath · 14 Nov 2025 · 71 homes · start notice not signed off · ABP-317280-23 · 1.8 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 17 Oct 2026, 01:09
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Homes coming 618 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Women’s Community Projects Mullingar Association CLG · Crèche18 Jul 2024 · report · Tusla Early Years Inspectorateapprox. 336 m
    Bright Beginnings · Crèche14 May 2026 · report · Tusla Early Years Inspectorateapprox. 336 m
    Bright Star Academy · Crèche28 Jan 2026 · report · Tusla Early Years Inspectorateapprox. 336 m
    Busy Little Bees · Crèche10 Dec 2025 · report · Tusla Early Years Inspectorateapprox. 336 m
    Early Steps Childcare · Crèche23 May 2025 · report · Tusla Early Years Inspectorateapprox. 336 m
    First Class Montessori · Crèche14 May 2025 · report · Tusla Early Years Inspectorateapprox. 336 m
    Steps Ahead Playschool · Crèche14 Nov 2025 · report · Tusla Early Years Inspectorateapprox. 336 m
    An Gairdin Scoil Montessori · Crèche30 Apr 2025 · report · Tusla Early Years Inspectorateapprox. 336 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Westmeath County Council.
    Homes approved
    Here219
    Council middle0
    Homes started
    Here385
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    36% of homes built before 1971 (council 26%). 28% owner-occupied (council 68%).

    Homes built before 1971
    36% · council 26%
    Homes built since 2001
    9% · council 34%
    Owner-occupied
    28% · council 68%
    Rented
    63% · council 26%
    Children under 15
    11% · council 21%
    Aged 65 and over
    21% · council 15%
    Households with 2+ cars
    13% · council 44%
    Work mainly from home
    0% · council 9%
    This small area (182 people)Westmeath

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 237106011

    Bus
    169 m
    Oliver Plunkett Street · MU1 · busiest stop within 500 m: 6 an hour at peak
    Nearest school
    137 m
    Scoil na mBraithre, 409 pupils
    Homes sold nearby
    11
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Scoil na mBraithre · primary · 409 pupils · 137 m
    • Colaiste Mhuire, · postprimary · 873 pupils · 168 m
    • Scoil na Maighdine Mhuire · primary · 307 pupils · 279 m
    • Presentation Convent (Jnr) · primary · 277 pupils · 279 m
    • St Brigids Spec Sch · primary · 93 pupils · 284 m
    • Loreto College · postprimary · 825 pupils · 386 m
    • S N na Naomh Uile · primary · 86 pupils · 408 m
    • Mullingar Community College · postprimary · 367 pupils · 732 m

    Stops 60

    • Oliver Plunkett Street · MU1 · 2/hour at peak · 169 m
    • Oliver Plunkett Street · MU1 · 2/hour at peak · 174 m
    • Presentation Convent · MU1, MU2 · 4/hour at peak · 296 m
    • Presentation Convent · MU1, MU2 · 4/hour at peak · 319 m
    • Castle Street · 115, 115C, 115X, 167, 23, 70 · 6/hour at peak · 326 m
    • Mullingar Castle Street · 816, 818, 819, MU1, MU2 · 5/hour at peak · 333 m
    • Mullingar Station · MU1 · 2/hour at peak · 345 m
    • Mullingar Station · MU1 · 2/hour at peak · 355 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil na mBraithre · 137 m-4% pupils (409)
    • Colaiste Mhuire, · 167 m+4.6% pupils (873)
    • Presentation Convent (Jnr) · 279 m-2.5% pupils (277)
    • Scoil na Maighdine Mhuire · 279 m0% pupils (307)
    • St Brigids Spec Sch · 284 m+8.1% pupils (93)
    • Loreto College · 386 m-1.7% pupils (825)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 17 Oct 2026, 02:12
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Council consultation portalsPublic17 Oct 2026, 01:36open
    Council meetings (ModernGov)Public17 Oct 2026, 02:12open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Garden room (2165) ran out unbuilt in 2026: built anyway?
      Ask for: If built: proof it started in time, and an opinion of compliance.
      Seller · solicitor
    2. Protected building: what changes would you be allowed?
      Ask for: A section 57 declaration from the council.
      Council
    3. 15 homes approved 212 m away (39 & 41 Oliver Plunkett Street), not started: what is planned?
      Ask for: The planning file for 21308.
      Council
    4. Application 331 m away open for comments until 21 Oct 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Mullingar
    Electoral division
    Mullingar North Urban
    Electoral area
    Mullingar
    Council
    Westmeath County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 2165, approved 2021, ran out unbuilt.
    • Protected building; heritage-listed; no vacant land tax.
    • 21 sites nearby could change: 4 stalled builds, 7 approved schemes, 10 empty zoned plots.
    • 6 applications open for comments nearby; nearest closes 21 Oct 2026.
    • 618 homes approved nearby, not started; largest 278 at Rathgowan or Farranshock.
    • Castle Street (bus 115, 115C) 326 m away: 6 an hour at morning peak; 43 from all stops within 500 m.
    • Here (2022 census): 63% rent (council 26%); 11% of homes empty (council 9%); most built before 1919; 46% drive to work (council 63%); population up 5% since 2016.
    • The council decides in a median 59 days (about 8 weeks); 43% are asked for more information.
    What the terms mean 10 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 28
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.017 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public17 Oct 2026
    www2.courts.ie—© the publisher17 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.012 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public17 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.017 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence17 Oct 2026
    services7.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 17 Oct 2026, 14:40 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.