PlanningRegister.ie
Planning report · Fingal County Council · 500 m around the house · the last 12 months · 5 Nov 2026, 10:16

Kelly Park

53.52662, -6.17384

Homes here mostly date from the 1970s. 1 planning file on this house, the latest from 2026. Most home extensions nearby get approved (88%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 1 planning file on this house, the latest from 2026.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2026: F26A/0848 · extension, undecided

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    F26A/0848 · extension · no decision yet
    approved?started?signed off?
On this site
R2
Zoning · Existing residential
Yes
Protected or listed · inside the zone around a recorded monument (DU008-010002-)
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Monument zoneOn this site Ecclesiastical site, Regles; Burial, Lusk
Conservation area1 within 100 m Lusk ACA
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Lusk (888 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Conservation areas1Lusk ACA
Heritage inventory buildings10Lusk National School; water pump
Radon grid squares2
Protected buildings5Former St. Macculin's (C of I) Church; Tower of Former St. Macculin's (C of I) Church
Monuments23Ecclesiastical site; Round tower
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 7 on the draft 2027 map; 7 on the final 2026 map.
Sources: Development plan zoning (councils), Architectural Conservation Areas, EPA radon map, SMR zones of notification, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), National Inventory of Architectural Heritage, Records of Protected Structures, Sites and Monuments Record · fetched 2 Nov 2026, 23:44
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.02 Nov 2026, 23:44open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 90–100% by type. A new house in a garden is harder: 33% approved, and 1 in 3 is asked for more information.

Single-storey rear11 decided · more info asked 0%
100% · council 92%
Attic or dormer20 decided · more info asked 10%
90% · council 92%
New house in a garden or site6 decided · more info asked 33%
33% · council 53%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 37 nearby, 2,164 council-wide

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic10—
Two-storey rear10—

On Regles: 1 extensions in 10 years; most common two-storey rear.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 53 days. 1 in 7 is asked for more information, which adds about 47 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; Appeal window: 4 weeks; If appealed: +192 days; Building starts: 117 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 49–55 (n=51)53 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 192 days (n=16, all appeals within 1.5 km)+192 daysBuilding startsStart notice: median 117 days after permission (n=26)117 days after permissionSigned off50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated60 decided home extensions, 26 start notices, 16 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    7 of 12 appealed refusals became permissions. 0 of 4 appealed approvals were reversed.

    Refusals appealed12 decided
    7 became permissions
    Approvals appealed4 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 4 in the last 12 months

    None of 2 changed the council's decision

    • 501518 Refused · St Elmo's, Barrack Lane, Lusk, Co. Dublin, K45 R650 · 413 m report
    • 501126 Refused · Site at the corner of Chapel Road and, St. Joseph's Avenue, Lusk, Co.… · 430 m report
    • 324022 Granted with conditions · Lusk, Co. Dublin. · 412 m report
    • 500465 Invalid · Site at the corner of Chapel Road and St. Joseph's Road, Lusk, Co.… · 430 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around Kelly Park with 15 numbered planning items
    ⌖ the houseEmpty land zoned for homesNo decision yetApprovedRefused
    1. 10.4 ha zoned for homesEmpty land zoned for homes · 347 m
    2. 20.3 ha zoned for homesEmpty land zoned for homes · 358 m
    3. 30.2 ha zoned for homesEmpty land zoned for homes · 373 m
    4. 48.1 ha zoned for homesEmpty land zoned for homes · 413 m
    5. 50.2 ha zoned for homesEmpty land zoned for homes · 461 m
    6. 60.1 ha zoned for homesEmpty land zoned for homes · 498 m
    7. 718 Minister's Road, Lusk F26A/0848No decision yet · 8 m
    8. 8Kilhedge Lane, Lusk F26A/0715ENo decision yet · 87 m
    9. 96 Dun Emer Green, Lusk F26A/0655No decision yet · 147 m
    10. 10John J. Browne & Sons (Builders) Ltd., Church Road F26A/0827ENo decision yet · 172 m
    11. 11Round Towers Lusk GAA, Thomas Ashe Park F25A/1084ENo decision yet · 182 m
    12. 122 Dun Emer Way, Lusk F25A/1097EApproved · 313 m
    13. 13Regles, The Green F25A/1184ENo decision yet · 334 m
    14. 14St Elmo's, Barrack Lane F26A/0253ERefused · 413 m
    15. 15Site at the corner of Chapel Road and, St. Joseph's Avenue F26A/0053ERefused · 430 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 34 permissions since 2016, 16 show a start notice and 4 have a completion certificate.

    59 applications lodged within 500 m. Council: 29 approved, 14 refused. After appeals: 34 approved. Of those: 4 signed off, 5 built with the owner's opt-out, 7 started, 17 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT29: lodged → approved14: lodged → refused10: lodged → withdrawn or invalid6: lodged → undecided29: approved → approved8: refused → refused10: withdrawn or invalid → withdrawn6: undecided → undecided5 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal17: approved → no start notice found5: approved → built, owner opted out7: approved → started, not signed off4: approved → signed off1: approved → ran out59 lodged59 lodged29 approved29 approved14 refused14 refused10 withdrawn or invalid10 withdrawn or invalid6 undecided6 undecided34 approved34 approved8 refused8 refused11 withdrawn11 withdrawn6 undecided6 undecided17 no start notice found17 no start notice found5 built, owner opted out5 built, owner opted out7 started, not signed off7 started, not signed off4 signed off4 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured59 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 6 within 500 m

      Empty land zoned for homes 6

      • 10.4 ha zoned for homes · no homes built on it yet · 347 m
      • 20.3 ha zoned for homes · no homes built on it yet · 358 m
      • 30.2 ha zoned for homes · no homes built on it yet · 373 m
      • 48.1 ha zoned for homes · no homes built on it yet · 413 m
      • 50.2 ha zoned for homes · no homes built on it yet · 461 m
      • 60.1 ha zoned for homes · no homes built on it yet · 498 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
      Council meetings (ModernGov)Public5 Nov 2026, 02:33open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
      Figure 7

      Applications within 500 m, by year

      Between 2 and 21 a year; busiest 2025. 67% of decisions were approvals.

      2021: 9, 2022: 2, 2023: 7, 2024: 11, 2025: 21, 2026: 901020302021: 8 approved2021: 1 refused9’21*2022: 1 approved2022: 1 refused2’222023: 5 approved2023: 2 refused7’232024: 7 approved2024: 1 refused2024: 3 withdrawn or invalid11’242025: 8 approved2025: 6 refused2025: 6 withdrawn or invalid2025: 1 undecided21’252026: 3 refused2026: 1 withdrawn or invalid2026: 5 undecided9’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 18 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      Building work nearby 2 in the last 12 months
      2 no sign-off needed
      • 2 Dun Emer Way, Lusk, Dublin, K45 VP02 · 13 Aug 2026 · 1 homes · short notice no sign-off needed · F25A/1097E · 330 m
      • 24 Dun Emer Avenue, Lusk, Fingal, K45 KD21 · 2 Dec 2025 · short notice no sign-off needed · F25A/0498E · 232 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      Homes coming 0 not started
      • Hands Lane · 41 homes · building started · 238 m
      • Ballough Place (Leonards Garage), Lusk · Completed · 10 homes · 321 m
      • Barnewall Lane, Rathmore, Lusk, Co. Dublin (Phase 1)* · Completed · 5 homes · 321 m
      • Hands Lane, Lusk · Completed · 13 homes · 321 m
      • Katie Hunt's Cottage, Church Road, Lusk · Completed · 5 homes · 321 m
      • Killhedge Lane, Dun Emer, Lusk · Completed · 7 homes · 321 m
      • Lusk Village, Lusk, Co. Dublin, Phase 2 (Phase 2)* · Completed · 4 homes · 321 m
      • Lusk Village Quarter, Lusk, Co. Dublin (Phase 1)* · Completed · 14 homes · 321 m
      • Remount, Lusk · On site · 18 homes · 321 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Regles · 6 applications in 10 years

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Minister's Road Development312—411 m
      Regles——411 m
      Lands at Station Road, Lusk3535 not started (2026-Q2)811 m
      Station Road181181 built (2025-Q4)888 m
      Lusk and Greatcommons Residential Development6464 built (2026-Q2)957 m
      Racecourse Common24no activity on site reported (2026-Q2)979 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Little Scholars Montessori & Childcare Limited · Crèche8 Jan 2026 · report · Tusla Early Years Inspectorate323 m
      Just Like Home · Crèche11 May 2026 · report · Tusla Early Years Inspectorate331 m
      Precious Days Montessori · Crèche4 Mar 2025 · report · Tusla Early Years Inspectorate429 m
      Little Scholars Montessori and Childcare Limited · Crèche11 Dec 2025 · report · Tusla Early Years Inspectorate434 m
      Woodlands Crèche & Montessori · Crèche11 May 2026 · report · Tusla Early Years Inspectorate506 m
      Bambi's Land Montessori & ASD Play school · Crèche15 Jan 2025 · report · Tusla Early Years Inspectorate843 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.02 Nov 2026, 23:01open
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register4 Nov 2026, 23:36open
      How busy is this area Busier than most of Fingal County Council.
      Homes approved
      Here23
      Council middle0
      Homes started
      Here414
      Council middle3
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Question 5

      What's the area like?

      Figure 8

      This street block against the council

      28% of homes built before 1971 (council 11%). 63% owner-occupied (council 67%).

      Homes built before 1971
      28% · council 11%
      Homes built since 2001
      5% · council 43%
      Owner-occupied
      63% · council 67%
      Rented
      33% · council 28%
      Children under 15
      17% · council 22%
      Aged 65 and over
      24% · council 11%
      Households with 2+ cars
      41% · council 42%
      Work mainly from home
      7% · council 12%
      This small area (266 people)Fingal

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267104022

      Bus
      525 m
      Barrack Lane · 33, 33A, 33E
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Flood
      Within 500 m
      OPW flood map area, not beside the house
      Nearest school
      486 m
      S N Lusca, 413 pupils
      Homes sold nearby
      467
      in 3 years, 308 new (Property Price Register)
      Schools, stops and the council

      Schools

      • S N Lusca · primary · 413 pupils · 486 m
      • Lusk Junior National School St Maccullins · primary · 366 pupils · 486 m

      Stops 8

      • Barrack Lane · 33, 33A, 33E, 33T, 33X, 33n · 2/hour at peak · 525 m
      • Barrack Lane · 33, 33A, 33X · 5/hour at peak · 567 m
      • Station Road · 33, 33A, 33X · 5/hour at peak · 614 m
      • Station Road · 33, 33A, 33E, 33T, 33X, 33n · 2/hour at peak · 641 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • S N Lusca · 486 m-0.7% pupils (413)
      • Lusk Junior National School St Maccullins · 486 m-4.2% pupils (366)

      Council meetings 30 items

      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Council consultation portalsPublic5 Nov 2026, 01:15open
      Council meetings (ModernGov)Public5 Nov 2026, 02:33open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Extension (F26A/0848) awaits a decision: what is planned?
        Ask for: The application on the council's website.
        Seller · solicitor
      2. Next to a recorded monument: does digging need notice?
        Ask for: Details of past works from the seller.
        Seller · council
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Lusk
      Electoral division
      Lusk
      Electoral area
      Rush-Lusk
      Council
      Fingal County Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest F26A/0848, no decision yet.
      • Zoned R2 (existing residential); monument zone; no vacant land tax.
      • 6 sites nearby could change: 6 empty zoned plots.
      • No morning-peak service within 500 m; nearest is Barrack Lane, 525 m away (2 an hour).
      • Here (2022 census): 63% owner-occupied (council 67%); 3% of homes empty (council 5%); most built 1971–1980; 62% drive to work (council 52%); population up 12% since 2016.
      • 2 home extensions within 250 m since 2026.
      • Around here the council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      • 2 appeals nearby decided in the last 12 months; none changed the council's decision.
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Conservation area (Architectural Conservation Area (ACA)): A street or area whose character is protected.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 37
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
      www2.courts.ie—© the publisher4 Nov 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.02 Nov 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.02 Nov 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
      water.ie—© the publisher · flag only—
      water.ie—© the publisher · flag only—
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 5 Nov 2026, 10:16 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.