Kelly Park
Homes here mostly date from the 1970s. 1 planning file on this house, the latest from 2026. Most home extensions nearby get approved (88%).
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 53 days
- 4Appeal window4 weeks after the decision
- 5AppealHere about 6 months
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 4 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 1 planning file on this house, the latest from 2026.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
- 2026F26A/0848 · extension · no decision yetapproved?started?signed off?
Zoning, protection, tax and flood: the detail
What it says
RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.
What it says
RS - Residential: Provide for residential development and protect and improve residential amenity
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029
Not on this site: protected building, heritage inventory, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Lusk (888 m)
| Within 500 m | Count | For example |
|---|---|---|
| Conservation areas | 1 | Lusk ACA |
| Heritage inventory buildings | 10 | Lusk National School; water pump |
| Radon grid squares | 2 | |
| Protected buildings | 5 | Former St. Macculin's (C of I) Church; Tower of Former St. Macculin's (C of I) Church |
| Monuments | 23 | Ecclesiastical site; Round tower |
How we work this out
Sources: Development plan zoning (councils), Architectural Conservation Areas, EPA radon map, SMR zones of notification, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), National Inventory of Architectural Heritage, Records of Protected Structures, Sites and Monuments Record · fetched 2 Nov 2026, 23:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Development plan zoning (councils) | CC BY 4.0 | 1 Nov 2026, 23:13 | open |
| Architectural Conservation Areas | CC BY 4.0 | 27 Sept 2026, 19:36 | open |
| EPA radon map | CC BY 4.0 | 27 Sept 2026, 19:36 | open |
| SMR zones of notification | CC BY 4.0 | 27 Sept 2026, 19:34 | open |
| EPA licensed facilities (LEAP) | CC BY 4.0 | 2 Nov 2026, 23:44 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 1 Nov 2026, 23:58 | open |
| Constraint layers (bundle) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026, 19:37 | open |
| OPW flood maps (CFRAM) | CC BY-NC-ND 4.0 · shown as a yes/no only | 11 Sept 2026, 19:11 | open |
| National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026, 19:35 | open |
| Records of Protected Structures | CC BY 4.0 | 27 Sept 2026, 19:36 | open |
| Sites and Monuments Record | CC BY 4.0 | 27 Sept 2026, 19:29 | open |
How we work this out
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
Extensions are almost always approved here: 90–100% by type. A new house in a garden is harder: 33% approved, and 1 in 3 is asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 37 nearby, 2,164 council-wide
Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m
Extensions and refusals near you 2 extensions within 250 m · the last 12 months
| Kind | Applied | Approved | Refused |
|---|---|---|---|
| Dormer or attic | 1 | 0 | — |
| Two-storey rear | 1 | 0 | — |
On Regles: 1 extensions in 10 years; most common two-storey rear.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
How long, and what if someone objects?
A home extension's journey here
A decision takes 53 days. 1 in 7 is asked for more information, which adds about 47 days. Building starts about 4 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated60 decided home extensions, 26 start notices, 16 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
7 of 12 appealed refusals became permissions. 0 of 4 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
Appeals nearby 4 in the last 12 months
None of 2 changed the council's decision
- 501518 Refused · St Elmo's, Barrack Lane, Lusk, Co. Dublin, K45 R650 · 413 m report
- 501126 Refused · Site at the corner of Chapel Road and, St. Joseph's Avenue, Lusk, Co.… · 430 m report
- 324022 Granted with conditions · Lusk, Co. Dublin. · 412 m report
- 500465 Invalid · Site at the corner of Chapel Road and St. Joseph's Road, Lusk, Co.… · 430 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Courts Service legal diary (judicial reviews) | © the publisher | 4 Nov 2026, 23:17 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
What's changing around you?
- 10.4 ha zoned for homes
- 20.3 ha zoned for homes
- 30.2 ha zoned for homes
- 48.1 ha zoned for homes
- 50.2 ha zoned for homes
- 60.1 ha zoned for homes
- 718 Minister's Road, Lusk F26A/0848
- 8Kilhedge Lane, Lusk F26A/0715E
- 96 Dun Emer Green, Lusk F26A/0655
- 10John J. Browne & Sons (Builders) Ltd., Church Road F26A/0827E
- 11Round Towers Lusk GAA, Thomas Ashe Park F25A/1084E
- 122 Dun Emer Way, Lusk F25A/1097E
- 13Regles, The Green F25A/1184E
- 14St Elmo's, Barrack Lane F26A/0253E
- 15Site at the corner of Chapel Road and, St. Joseph's Avenue F26A/0053E
What happens to applications within 500 m
Permission isn't building. Of 34 permissions since 2016, 16 show a start notice and 4 have a completion certificate.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured59 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
Nothing closes within 500 m in the next 30 days.
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Sites that could change 6 within 500 m
Empty land zoned for homes 6
- 10.4 ha zoned for homes · no homes built on it yet · 347 m
- 20.3 ha zoned for homes · no homes built on it yet · 358 m
- 30.2 ha zoned for homes · no homes built on it yet · 373 m
- 48.1 ha zoned for homes · no homes built on it yet · 413 m
- 50.2 ha zoned for homes · no homes built on it yet · 461 m
- 60.1 ha zoned for homes · no homes built on it yet · 498 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
| Derelict sites registers | CC BY 4.0 | 2 Nov 2026, 23:17 | open |
| Council meetings (ModernGov) | Public | 5 Nov 2026, 02:33 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 1 Nov 2026, 23:58 | open |
Applications within 500 m, by year
Between 2 and 21 a year; busiest 2025. 67% of decisions were approvals.
2021 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Every application within 500 m 18 in the last 12 months
See every application on the map
- 718 Minister's Road, Lusk, Co.Dublin No decision yetThe development will consist of the construction of a single storey extension to the side of the existing…
- 10John J. Browne & Sons (Builders) Ltd., Church Road, Lusk, Co. Dublin, K45 Y535 No decision yetPlanning Permission for: 1/ Retention for 2 no. single storey lean-to shelters for the covered storage and…
- 8Kilhedge Lane, Lusk, Co. Dublin No decision yetThe development will consist of the construction of 3 no. two-storey d
- Green Hollow, Quickpenny Road, Lusk, Co. Dublin., K45 XH74 No decision yetPlanning Permission is requested for 2 no. two-storey detached four-be
- 96 Dun Emer Green, Lusk, Co. Dublin, K45 PV20 No decision yetPermission sought for proposed pediestrian gateway to side garden boun
- Post Office Road, Lusk, Co. Dublin, K45 V324 RefusedPermission is sought for (i) removal of existing bungalow roof, (ii) d
- 14St Elmo's, Barrack Lane, Lusk, Co. Dublin, K45 R650 RefusedSingle-storey flat roof extension to the rear linking the existing gar
- 15Site at the corner of Chapel Road and, St. Joseph's Avenue, Lusk, Co. RefusedThe development will consist of alterations to the previously permitte
- Site at the corner of Chapel Road and St. Joseph's Road, Lusk, Co. Dub Withdrawn or not valid• An additional 2 bed bungalow to the rear of the site • 1no. new/ad
- Green Hollow, Quickpenny Road, Lusk, Co. Dublin., K45 XH74 RefusedPlanning Permission is requested for 3 no. two-storey detached four-be
- 13Regles, The Green, Quickpenny Road, Lusk, Co. Dublin No decision yetThe development will consist of 27 dwellings, comprising of - 8 no. 3
- Regles, The Green, Quickpenny Road, Lusk, Co. Dublin Withdrawn or not validThe development will consist of 27 dwellings, comprising of - 8 no. 3
- Regles, The Green, Quickpenny Road, Lusk, Co. Dublin Withdrawn or not validThe development will consist of 27 dwellings, comprising of - 8 no. 3
- Post Office Road, Lusk, Co. Dublin, K45 V324 Refused(i) removal of existing bungalow roof, (ii) demolition of existing bun
- 122 Dun Emer Way, Lusk, Co. Dublin, K45 VP02 ApprovedConstruction of a single-storey, flat-roof extension to the side and r
- 11Round Towers Lusk GAA, Thomas Ashe Park, Minister's Road, Lusk, Co. Du No decision yetPlanning Permission for: construction of a new handball alley with a c
- Post Office Road, Lusk, Co. Dublin, K45 V324 Withdrawn or not validPlanning permission is sought for the 1st floor extension over existin
- 1 Dun Emer Avenue, Lusk, Co. Dublin, K45 KC03 ApprovedPlanning Permission for the construction of a single storey extension
How we work this out
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
Building work nearby 2 in the last 12 months
- 2 Dun Emer Way, Lusk, Dublin, K45 VP02 · 13 Aug 2026 · 1 homes · short notice no sign-off needed · F25A/1097E · 330 m
- 24 Dun Emer Avenue, Lusk, Fingal, K45 KD21 · 2 Dec 2025 · short notice no sign-off needed · F25A/0498E · 232 m
How we work this out
Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
Homes coming 0 not started
- Hands Lane · 41 homes · building started · 238 m
- Ballough Place (Leonards Garage), Lusk · Completed · 10 homes · 321 m
- Barnewall Lane, Rathmore, Lusk, Co. Dublin (Phase 1)* · Completed · 5 homes · 321 m
- Hands Lane, Lusk · Completed · 13 homes · 321 m
- Katie Hunt's Cottage, Church Road, Lusk · Completed · 5 homes · 321 m
- Killhedge Lane, Dun Emer, Lusk · Completed · 7 homes · 321 m
- Lusk Village, Lusk, Co. Dublin, Phase 2 (Phase 2)* · Completed · 4 homes · 321 m
- Lusk Village Quarter, Lusk, Co. Dublin (Phase 1)* · Completed · 14 homes · 321 m
- Remount, Lusk · On site · 18 homes · 321 m
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
| Social housing construction status report | CC BY-SA 4.0 | 23 Oct 2026, 23:02 | open |
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Estate: Regles · 6 applications in 10 years
Developments within 1.0 km
| Scheme | Homes | Progress | Distance |
|---|---|---|---|
| Minister's Road Development | 312 | — | 411 m |
| Regles | — | — | 411 m |
| Lands at Station Road, Lusk | 35 | 35 not started (2026-Q2) | 811 m |
| Station Road | 181 | 181 built (2025-Q4) | 888 m |
| Lusk and Greatcommons Residential Development | 64 | 64 built (2026-Q2) | 957 m |
| Racecourse Common | 24 | no activity on site reported (2026-Q2) | 979 m |
Crèches and schools inspected
| Name | Latest inspection | Distance |
|---|---|---|
| Little Scholars Montessori & Childcare Limited · Crèche | 8 Jan 2026 · report · Tusla Early Years Inspectorate | 323 m |
| Just Like Home · Crèche | 11 May 2026 · report · Tusla Early Years Inspectorate | 331 m |
| Precious Days Montessori · Crèche | 4 Mar 2025 · report · Tusla Early Years Inspectorate | 429 m |
| Little Scholars Montessori and Childcare Limited · Crèche | 11 Dec 2025 · report · Tusla Early Years Inspectorate | 434 m |
| Woodlands Crèche & Montessori · Crèche | 11 May 2026 · report · Tusla Early Years Inspectorate | 506 m |
| Bambi's Land Montessori & ASD Play school · Crèche | 15 Jan 2025 · report · Tusla Early Years Inspectorate | 843 m |
How we work this out
Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Dublin housing delivery pipeline | CC BY 4.0 | 2 Nov 2026, 23:01 | open |
| Housing estates | ODbL 1.0, CC BY-SA 4.0, CC BY 4.0 | 27 Oct 2026, 23:03 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
| Tusla early years register | Public register | 4 Nov 2026, 23:36 | open |
How busy is this area Busier than most of Fingal County Council.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
What's the area like?
This street block against the council
28% of homes built before 1971 (council 11%). 63% owner-occupied (council 67%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267104022
Schools, stops and the council
Schools
- S N Lusca · primary · 413 pupils · 486 m
- Lusk Junior National School St Maccullins · primary · 366 pupils · 486 m
Stops 8
- Barrack Lane · 33, 33A, 33E, 33T, 33X, 33n · 2/hour at peak · 525 m
- Barrack Lane · 33, 33A, 33X · 5/hour at peak · 567 m
- Station Road · 33, 33A, 33X · 5/hour at peak · 614 m
- Station Road · 33, 33A, 33E, 33T, 33X, 33n · 2/hour at peak · 641 m
Schools growing or shrinking planning in 3 years · pupils last year
- S N Lusca · 486 m-0.7% pupils (413)
- Lusk Junior National School St Maccullins · 486 m-4.2% pupils (366)
Council meetings 30 items
- 5 Nov 2026 · Councillor J. Burtchaell - Update on Development of All-Weather Facility in Damastown Park -…
- 5 Nov 2026 · Councillor K. Relihan - Dumping of Supermarket Trolleys in Whitestown Estate - AI110653
- 4 Nov 2026 · Councillor J. Hopkins - Health Check on Trees in Racecourse Park beside the Community Hall -…
- 12 Oct 2026 · Notice of proposed wayleave at Ballough, Co. Dublin to Gas Networks Ireland, P.O. Box 51, Gasworks…
- 12 Oct 2026 · Notice of proposed disposal of land adjacent to 56 Seaview Park, Portrane, Co. Dublin to Margaret…
- 8 Oct 2026 · Councillor M. Boland - Public Electric Vehicle (EV) Charging Points Rush - AI109447
- 8 Oct 2026 · Councillor M. Boland - Updated list of Taking in Charge - Rush and Lusk - AI109448
- 8 Oct 2026 · Councillor P. Mulville - Portrane Road Cycle Path - AI109737
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Public transport stops and routes (NTA GTFS) | CC BY 4.0 | 1 Nov 2026, 23:05 | open |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
| Council consultation portals | Public | 5 Nov 2026, 01:15 | open |
| Council meetings (ModernGov) | Public | 5 Nov 2026, 02:33 | open |
| Land Development Agency public land register | CC BY 4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Extension (F26A/0848) awaits a decision: what is planned?Seller · solicitorAsk for: The application on the council's website.
- Next to a recorded monument: does digging need notice?Seller · councilAsk for: Details of past works from the seller.
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Townland
- Lusk
- Electoral division
- Lusk
- Electoral area
- Rush-Lusk
- Council
- Fingal County Council
Everything we found, as a list 8 lines
- 1 application on this site; latest F26A/0848, no decision yet.
- Zoned R2 (existing residential); monument zone; no vacant land tax.
- 6 sites nearby could change: 6 empty zoned plots.
- No morning-peak service within 500 m; nearest is Barrack Lane, 525 m away (2 an hour).
- Here (2022 census): 63% owner-occupied (council 67%); 3% of homes empty (council 5%); most built 1971–1980; 62% drive to work (council 52%); population up 12% since 2016.
- 2 home extensions within 250 m since 2026.
- Around here the council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
- 2 appeals nearby decided in the last 12 months; none changed the council's decision.
What the terms mean 7 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Conservation area (Architectural Conservation Area (ACA)): A street or area whose character is protected.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 37
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC BY 4.0 | 30 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC BY 4.0 | 5 Nov 2026 |
| data.gov.ie | Various (see each layer) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026 |
| services.arcgis.com | Local authorities (ACAs) | CC BY 4.0 | 27 Sept 2026 |
| s3.eu-west-1.amazonaws.com | Office of Public Works | CC BY-NC-ND 4.0 · flag only | 11 Sept 2026 |
| services-eu1.arcgis.com | National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026 |
| gis.epa.ie | Environmental Protection Agency | CC BY 4.0 | 27 Sept 2026 |
| services.arcgis.com | Local authorities (Record of Protected Structures) | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR zones) | CC BY 4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | Local authorities (consultation portals) | Public | 5 Nov 2026 |
| www2.courts.ie | — | © the publisher | 4 Nov 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC BY 4.0 | 2 Nov 2026 |
| services.arcgis.com | Dublin local authorities (housing delivery pipeline) | CC BY 4.0 | 2 Nov 2026 |
| data.epa.ie | Environmental Protection Agency (LEAP licence register) | CC BY 4.0 | 2 Nov 2026 |
| esbnetworks.ie | — | © the publisher · flag only | 11 Sept 2026 |
| overpass-api.de | OpenStreetMap contributors, NHDS, Kildare County Council | ODbL 1.0, CC BY-SA 4.0, CC BY 4.0 | 27 Oct 2026 |
| transportforireland.ie | National Transport Authority | CC BY 4.0 | 1 Nov 2026 |
| lda.ie | Land Development Agency | CC BY 4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | Public | 5 Nov 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC BY 4.0 | 5 Nov 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC BY 4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC BY 4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | © PSRA, PSI licence | 5 Nov 2026 |
| services.arcgis.com | Local authorities (RZLT maps) | CC BY 4.0 | 1 Nov 2026 |
| gov.ie | Department of Education | CC BY 4.0 | 27 Oct 2026 |
| gov.ie | Department of Housing | CC BY-SA 4.0 | 23 Oct 2026 |
| tusla.ie | Tusla (Early Years Inspectorate) | Public register | 4 Nov 2026 |
| water.ie | — | © the publisher · flag only | — |
| water.ie | — | © the publisher · flag only | — |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC BY 4.0 | 1 Nov 2026 |