Planning report · Westmeath County Council · 2000 m around the house · the last 12 months · 1 Nov 2026, 23:12

Harbour Street, Mullingar

53.52873, -7.34438

Homes here mostly date from before 1919. Most home extensions nearby get approved (89%). 278 homes approved 1.4 km away haven't started.

See on the mapWatch this area

Not held yet for Westmeath County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of MullingarBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2021: 11 files on Mullingar2022: 17 files on Mullingar2023: 10 files on Mullingar2024: 9 files on Mullingar2025: 16 files on Mullingar2026: 3 files on Mullingar66 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Protected building4 within 100 m on the council's record (not republished); on the council's record (not republished)

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Soltec (Ireland) Limited (728 m); Data Packaging Ltd. (841 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings225bridge; post box
Monuments52R165457; R165499
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 56 on the draft 2027 map; 48 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 23:01
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 23:01open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 90–100% by type.

Two-storey rear10 decided · more info asked 50%
100% · council 93%
First-floor10 decided · more info asked 20%
90% · council 92%
Approved nearbyWestmeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 20 nearby, 114 council-wide

Figure 3

Mullingar, file by file since 2021

14 of 18 decided extensions on the road were approved. New houses in side gardens or on sites: 0 of 1.

66 planning files on Mullingar since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 5 · 2021 · two-storey rear · approved · 21103No. 36 · 2021 · two-storey side · refused · 21268No. 5 · 2021 · two-storey rear · approved · 2165No. 36 · 2022 · two-storey side · refused · 22183No number · 2022 · porch / front · approved · 22507No number · 2022 · first-floor · approved · 22541No. 36 · 2023 · attic conversion / dormer · approved · 2360079No. 5 · 2023 · first-floor · approved · 2360135No number · 2024 · other extension · approved · 2460035No. 44 · 2024 · first-floor · approved · 2460293No number · 2024 · other extension · approved · 2473No. 40 · 2025 · rear · approved · 2560083No. 5 · 2025 · first-floor · refused · 2560113No. 56 · 2025 · rear · approved · 2560374No number · 2025 · other extension · approved · 2560381No. 5 · 2025 · single-storey rear · approved · 2560465No. 36 · 2025 · rear · refused · 2560516No. 6 · 2026 · garage conversion · approved · 2660242Porches, roofs, otherNo. 2 · 2021 · other work · approved · 21177No. 41 · 2021 · other work · approved · 21308No. 6 · 2021 · other work · approved · 21311No. 25 · 2021 · other work · approved · 21345No number · 2021 · other work · approved · 21501No. 4 · 2021 · other work · approved · 21618No number · 2021 · other work · approved · 21631No number · 2021 · other work · approved · 21669No number · 2022 · other work · approved · 2210No number · 2022 · other work · refused · 22136No number · 2022 · other work · refused · 22235No. 23 · 2022 · other work · approved · 2226No number · 2022 · other work · approved · 22298No. 28A · 2022 · other work · approved · 22304No number · 2022 · other work · approved · 2235No number · 2022 · other work · refused · 2241No. 38 · 2022 · other work · approved · 22437No number · 2022 · other work · approved · 22464No number · 2022 · other work · approved · 22542No number · 2022 · other work · approved · 22560No. 22 · 2022 · other work · approved · 2260032No number · 2022 · other work · approved · 2268No number · 2023 · other work · approved · 23134No number · 2023 · other work · approved · 2341No. 16 · 2023 · other work · approved · 2358No number · 2023 · other work · approved · 2360157No. 9 · 2023 · other work · approved · 2360225No. 52 · 2023 · other work · approved · 2360244No. 8 · 2023 · other work · approved · 2360362No. 17 · 2023 · other work · approved · 2385No number · 2024 · other work · approved · 2460149No. 3A · 2024 · other work · approved · 2460176No. 17 · 2024 · other work · approved · 2460316No number · 2024 · other work · approved · 2460325No. 33 · 2024 · other work · approved · 2460363No number · 2024 · first-floor · approved · 2460407No number · 2025 · other work · approved · 2541No number · 2025 · other work · refused · 2560062No number · 2025 · other work · refused · 2560135No number · 2025 · other work · refused · 2560227No number · 2025 · other work · approved · 2560270No number · 2025 · other work · approved · 2560286No number · 2025 · other work · approved · 2560356No number · 2025 · other work · refused · 2560484No number · 2025 · other work · approved · 2560513No. 15 · 2025 · other work · approved · 2560554No number · 2026 · other work · approved · 2660218New house in a side gardenNo. 4 · 2026 · new house · refused · 26601834
ApprovedRefusedWithdrawn or invalid

66 files with "Mullingar" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Garage conversion11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 23:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 23:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 23:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 23:01open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 4 is asked for more information, which adds about 102 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 4): 155 days; Appeal window: 4 weeks; Building starts: 138 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 51–55 (n=51)53 daysIf more info asked (1 in 4)With further information: median 155 days (n=20)155 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 138 days after permission (n=20)138 days after permissionSigned off75% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated71 decided home extensions, 20 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Appeals nearby 1 in the last 12 months
    • 501836 Invalid · Saunders Bridge , Ardmore Road Ballinderry Td. , Mullingar Co.… · 1.1 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 23:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 23:01open
    Question 4

    What's changing around you?

    Street map around Harbour Street, Mullingar with 15 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedLarge schemeEmpty land zoned for homes
    1. 121 Ashefield Apartments, Mullingar 2660550No decision yet · 603 m
    2. 2Dublin Road, Mullingar 2660558No decision yet · 1.3 km
    3. 339 & 41 Oliver Plunkett Street 21308Approved, not started, approval runs out within a year · 459 m
    4. 4Spout Well Lane 2235Approved, no sign building has started · 473 m
    5. 5Robinstown 2360056Approved, no sign building has started · 723 m
    6. 6Robinstown and Robinstown 21680Approved, no sign building has started · 1.0 km
    7. 7Saunders Bridge 2560495Approved, no sign building has started · 1.2 km
    8. 8Rathgowan or Farranshock 2660222Approved, no sign building has started · 1.4 km
    9. 9Ardeevin House Bellview, Dublin Road Mullingar 2660093Refused · 1.3 km
    10. 10Dublin Road, Petitswood Townland 2660379Approved with conditions · 1.9 km
    11. 111.6 ha zoned for homesEmpty land zoned for homes · 134 m
    12. 120.9 ha zoned for homesEmpty land zoned for homes · 268 m
    13. 130.3 ha zoned for homesEmpty land zoned for homes · 321 m
    14. 141.8 ha zoned for homesEmpty land zoned for homes · 350 m
    15. 151.0 ha zoned for homesEmpty land zoned for homes · 389 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 41 permissions since 2016, 12 show a start notice and 4 have a completion certificate.

    49 applications lodged within 500 m. Council: 41 approved, 8 refused. After appeals: 41 approved. Of those: 4 signed off, 1 built with the owner's opt-out, 7 started, 27 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT41: lodged → approved8: lodged → refused41: approved → approved8: refused → refused27: approved → no start notice found1: approved → built, owner opted out7: approved → started, not signed off4: approved → signed off2: approved → ran out49 lodged49 lodged41 approved41 approved8 refused8 refused41 approved41 approved8 refused8 refused27 no start notice found27 no start notice found1 built, owner opted out1 built, owner opted out7 started, not signed off7 started, not signed off4 signed off4 signed off2 ran out2 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured49 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    2 deadlines within 2.0 km; the first closes 16 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-16 2660550: application received — construction of an extension to our existing apartment to include a stairs on the first floor and on the second floor at; 2026-11-20 2660558: application received — the development will consist of: RETENTION of replacement of external cladding and fenestration, 2 no. first-floor windotoday6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec2660550: application received — construction of an extension to our existing apartment to include a stairs on the first floor and on the second floor at · 603 m away · 2026-11-162660558: application received — the development will consist of: RETENTION of replacement of external cladding and fenestration, 2 no. first-floor windo · 1.3 km away · 2026-11-20
    Comments close
    • Comments close 16 Nov 202615 days left
      12660550 · application received — construction of an extension to our existing apartment to include a stairs on the first floor…
      €20 to the council · 603 m away
    • Comments close 20 Nov 202619 days left
      22660558 · application received — the development will consist of: RETENTION of replacement of external cladding and fenestration,…
      €20 to the council · 1.3 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    278 homes 1.4 km away were approved Oct 2026 with no start notice yet; the permission runs to Oct 2031. 4 building sites nearby stopped before sign-off.

    Rathgowan or Farranshock · 278 homes: 278 homes approved Oct 2026, not started; Robinstown and Robinstown · 81 homes: 81 homes approved Feb 2023, not started; Saunders Bridge · 73 homes: 73 homes approved Aug 2026, not started; Robinstown · 38 homes: 38 homes approved Nov 2023, not started2023202420252026202720282029203020312032Rathgowan or Farranshock · 278 homes1.4 km · 2660222278 homes approved Oct 2026, not started278 homes approved Oct 2026, not startedRobinstown and Robinstown · 81 homes1.0 km · 2168081 homes approved Feb 2023, not started81 homes approved Feb 2023, not startedSaunders Bridge · 73 homes1.2 km · 256049573 homes approved Aug 2026, not started73 homes approved Aug 2026, not startedRobinstown · 38 homes723 m · 236005638 homes approved Nov 2023, not started38 homes approved Nov 2023, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 19 within 2.0 km

    Building site that stopped 4

    • rear of 16 Springfield Cottages, Mullingar · 13 homes, started Nov 2021, never signed off · 771 m
    • Ashe Road, Mullingar · 18 homes, started Jun 2021, never signed off · 852 m
    • Delvin Road, Mullingar · 12 homes, started Apr 2023, never signed off · 936 m
    • Irishtown, Mullingar · 28 homes, started Aug 2023, never signed off · 1.8 km

    Approved, not started, approval running out 1

    Approved, not started 5

    Empty land zoned for homes 9

    • 111.6 ha zoned for homes · no homes built on it yet · 134 m
    • 120.9 ha zoned for homes · no homes built on it yet · 268 m
    • 130.3 ha zoned for homes · no homes built on it yet · 321 m
    • 141.8 ha zoned for homes · no homes built on it yet · 350 m
    • 151.0 ha zoned for homes · no homes built on it yet · 389 m
    • 0.2 ha zoned for homes · no homes built on it yet · 452 m
    • 0.6 ha zoned for homes · no homes built on it yet · 459 m
    • 1.1 ha zoned for homes · no homes built on it yet · 557 m
    • 5.6 ha zoned for homes · no homes built on it yet · 736 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 23:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 23:01open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 6 and 13 a year; busiest 2022. 84% of decisions were approvals.

    2021: 10, 2022: 13, 2023: 6, 2024: 6, 2025: 13, 2026: 1051015202021: 10 approved10’21*2022: 10 approved2022: 3 refused13’222023: 6 approved6’232024: 6 approved6’242025: 8 approved2025: 5 refused13’252026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 65 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 23:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 23:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 31 in the last 12 months
    2 signed off as finished20 not signed off9 no sign-off needed
    • 13 Gort Na Dtobar Irishtown, Mullingar, Westmeath · 26 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 21568 · 1.7 km
    • 4 Zone A, Mullingar, Westmeath · 11 Sept 2026 · 7-day notice not signed off · 2660293 · 920 m
    • 25 Gort Na Dtobar, Mullingar, Westmeath · 30 Jul 2026 · 1 homes · start notice not signed off · 21568 · 1.6 km
    • Springfield Cottages, Mullingar, Westmeath · 1 Jul 2026 · 9 homes · start notice not signed off · 21616 · 865 m
    • 26 Gort NaDtobar, Irish Town, Mullingar, Westmeath · 5 Jun 2026 · 1 homes · start notice not signed off · 21568 · 1.6 km
    • 22 Gort Na Dtobar, Irishtown, Mullingar, Westmeath · 18 May 2026 · 1 homes · start notice, opted out no sign-off needed · 21568 · 1.6 km
    • 21 Gort Na Dtobar, Irishtown, Mullingar, Westmeath · 18 May 2026 · 1 homes · start notice, opted out no sign-off needed · 21568 · 1.6 km
    • Ballinderry, Mullingar, Westmeath, N91 A7P0 · 6 May 2026 · 1 homes · start notice not signed off · 2560461 · 1.3 km
    • 12 Austin Friars Street, Mullingar, Westmeath, N91 Y6P2 · 1 May 2026 · 6 homes · 7-day notice not signed off · 523 m
    • Ardmore Road, Mullingar, Westmeath · 30 Apr 2026 · 104 homes · start notice not signed off · 25/60259 · 1.9 km
    • Kilcumny, Barbavilla, Collinstown, Mullingar, Westmeath · 27 Apr 2026 · start notice not signed off · 24/60273 · 385 m
    • 33 Sráid an Phiarsaigh, An Muileann gCearr, Westmeath, N91 X9RN · 16 Apr 2026 · 7-day notice not signed off · 2460363 · 404 m
    • 3 Mount Street, Mullingar, Westmeath, N91 NX73 · 16 Apr 2026 · 7-day notice not signed off · 428 m
    • 15/17 Oliver Plunkett Street, Mullingar, Westmeath, N91 Y049 · 30 Mar 2026 · 1 homes · start notice not signed off · 24/60316 · 414 m
    • 18 Lynn Avenue, Mullingar, Westmeath, N91 F7D4 · 27 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60568 · 1.1 km
    • 15 Harbour Street, Mullingar, Westmeath, N91 W9X7 · 24 Mar 2026 · short notice no sign-off needed · 2560554 · 291 m
    • Ardmore Road, Mullingar, Westmeath · 20 Mar 2026 · 104 homes · start notice not signed off · 25/60259 · 1.9 km
    • College Street, Mullingar, Westmeath · 5 Mar 2026 · 7 homes · 7-day notice not signed off · 23134 · 403 m
    • College Street, Mullingar, Westmeath · 26 Feb 2026 · 7 homes · start notice not signed off · 23134 · 405 m
    • 11 Cathedral View, Mullingar, Westmeath, N91 E2N8 · 6 Feb 2026 · 1 homes · start notice not signed off · 343 m
    • Ardmore Road, Mullingar, Westmeath · 3 Feb 2026 · 104 homes · start notice not signed off · 25/60259 · 1.9 km
    • 2 Ballinderry, Mullingar, Westmeath, N91 F5F2 · 30 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 2560096 · 1.2 km
    • Ballinderry, Mullingar, Westmeath, N91Y4E6 · 4 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 25/60052 · 1.2 km
    • Bellview, Mullingar, Westmeath · 1 Dec 2025 · 7-day notice signed off · 1.1 km
    • Grand Parade, Mullingar, Westmeath, N91 KN28 · 24 Nov 2025 · 7-day notice signed off · 537 m
    • Longford Road, Mullingar, Westmeath, N91 N602​ · 19 Nov 2025 · start notice not signed off · 905 m
    • Longford Road, Mullingar, Westmeath, N91 NA43 · 19 Nov 2025 · start notice not signed off · ​24-60149 · 669 m
    • 7 Gort Na Dtobar Irishtown, Mullingar, Westmeath · 19 Nov 2025 · short notice no sign-off needed · 2460359 · 1.8 km
    • 10 Gort Na Dtobar Irishtown, Mullingar, Westmeath · 19 Nov 2025 · short notice no sign-off needed · 2460357 · 1.7 km
    • Longford Road, Mullingar, Westmeath, N91 NA43 · 19 Nov 2025 · start notice not signed off · ​24-60149 · 669 m
    • Ardmore Road, Mullingar, Westmeath · 14 Nov 2025 · 71 homes · start notice not signed off · ABP-317280-23 · 1.9 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 501 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 23:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 23:01open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Women’s Community Projects Mullingar Association CLG · Crèche18 Jul 2024 · report · Tusla Early Years Inspectorateapprox. 578 m
    Bright Beginnings · Crèche14 May 2026 · report · Tusla Early Years Inspectorateapprox. 578 m
    Bright Star Academy · Crèche28 Jan 2026 · report · Tusla Early Years Inspectorateapprox. 578 m
    Busy Little Bees · Crèche10 Dec 2025 · report · Tusla Early Years Inspectorateapprox. 578 m
    Early Steps Childcare · Crèche23 May 2025 · report · Tusla Early Years Inspectorateapprox. 578 m
    First Class Montessori · Crèche14 May 2025 · report · Tusla Early Years Inspectorateapprox. 578 m
    Steps Ahead Playschool · Crèche14 Nov 2025 · report · Tusla Early Years Inspectorateapprox. 578 m
    An Gairdin Scoil Montessori · Crèche30 Apr 2025 · report · Tusla Early Years Inspectorateapprox. 578 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Westmeath County Council.
    Homes approved
    Here219
    Council middle0
    Homes started
    Here367
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 23:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 23:01open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    36% of homes built before 1971 (council 26%). 28% owner-occupied (council 68%).

    Homes built before 1971
    36% · council 26%
    Homes built since 2001
    9% · council 34%
    Owner-occupied
    28% · council 68%
    Rented
    63% · council 26%
    Children under 15
    11% · council 21%
    Aged 65 and over
    21% · council 15%
    Households with 2+ cars
    13% · council 44%
    Work mainly from home
    0% · council 9%
    This small area (182 people)Westmeath

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 237106011

    Bus
    112 m
    Presentation Convent · MU1, MU2 · busiest stop within 500 m: 6 an hour at peak
    Nearest school
    18 m
    St Brigids Spec Sch, 93 pupils
    Homes sold nearby
    10
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • St Brigids Spec Sch · primary · 93 pupils · 18 m
    • Scoil na Maighdine Mhuire · primary · 307 pupils · 123 m
    • Presentation Convent (Jnr) · primary · 277 pupils · 123 m
    • Loreto College · postprimary · 825 pupils · 159 m
    • Colaiste Mhuire, · postprimary · 873 pupils · 231 m
    • Scoil na mBraithre · primary · 409 pupils · 339 m
    • S N na Naomh Uile · primary · 86 pupils · 571 m
    • Gaelscoil An Mhuilinn · primary · 179 pupils · 826 m

    Stops 58

    • Presentation Convent · MU1, MU2 · 4/hour at peak · 112 m
    • Primary Care Centre · MU1, MU2 · 4/hour at peak · 118 m
    • Presentation Convent · MU1, MU2 · 4/hour at peak · 131 m
    • Primary Care Centre · MU1, MU2 · 4/hour at peak · 273 m
    • Mullingar Castle Street · 816, 818, 819, MU1, MU2 · 5/hour at peak · 378 m
    • Castle Street · 115, 115C, 115X, 167, 23, 70 · 6/hour at peak · 379 m
    • Oliver Plunkett Street · MU1 · 2/hour at peak · 416 m
    • Oliver Plunkett Street · MU1 · 2/hour at peak · 429 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Brigids Spec Sch · 18 m+8.1% pupils (93)
    • Scoil na Maighdine Mhuire · 123 m0% pupils (307)
    • Presentation Convent (Jnr) · 123 m-2.5% pupils (277)
    • Loreto College · 159 m-1.7% pupils (825)
    • Colaiste Mhuire, · 231 m+4.6% pupils (873)
    • Scoil na mBraithre · 339 m-4% pupils (409)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 23:05
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 23:01open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 603 m away open for comments until 16 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Mullingar
    Electoral division
    Mullingar North Urban
    Electoral area
    Mullingar
    Council
    Westmeath County Council
    Everything we found, as a list 8 lines
    • Not protected; no vacant land tax.
    • 19 sites nearby could change: 4 stalled builds, 6 approved schemes, 9 empty zoned plots.
    • 2 applications open for comments nearby; nearest closes 16 Nov 2026.
    • 501 homes approved nearby, not started; largest 278 at Rathgowan or Farranshock.
    • Castle Street (bus 115, 115C) 379 m away: 6 an hour at morning peak; 33 from all stops within 500 m.
    • Here (2022 census): 63% rent (council 26%); 11% of homes empty (council 9%); most built before 1919; 46% drive to work (council 63%); population up 5% since 2016.
    • 1 home extension within 250 m since 2026.
    • The council decides in a median 59 days (about 8 weeks); 43% are asked for more information.
    What the terms mean 10 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 28
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services7.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 23:12 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.