Planning report · Westmeath County Council · 500 m around the house · the last 12 months · 25 Oct 2026, 20:50

Dún Mhic Coluim, Mullingar

53.52892, -7.35687

Homes here mostly date from the 1990s. Most home extensions nearby get approved (86%). A building site 26 m away stopped before it was finished.

See on the mapWatch this area

Not held yet for Westmeath County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of MullingarBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2021: 6 files on Mullingar2022: 4 files on Mullingar2023: 5 files on Mullingar2024: 1 file on Mullingar2025: 5 files on Mullingar2026: 4 files on Mullingar25 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings17Rathgowan; Columb Barracks
Monuments1Standing stone
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 9 on the draft 2027 map; 8 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

Mullingar, file by file since 2021

5 of 8 decided extensions on the road were approved. New houses in side gardens or on sites: 0 of 1.

25 planning files on Mullingar since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 36 · 2021 · two-storey side · refused · 21268No. 36 · 2022 · two-storey side · refused · 22183No. 36 · 2023 · attic conversion / dormer · approved · 2360079No. 5 · 2023 · first-floor · approved · 2360135No number · 2024 · other extension · approved · 2473No. 40 · 2025 · rear · approved · 2560083No. 36 · 2025 · rear · refused · 2560516No. 18 · 2026 · attic conversion / dormer · approved · 2660273Porches, roofs, otherNo number · 2021 · other work · approved · 21139No. 6 · 2021 · other work · approved · 21311No number · 2021 · other work · approved · 21501No number · 2021 · other work · approved · 21631No number · 2021 · other work · approved · 2197No number · 2022 · other work · refused · 22235No number · 2022 · other work · approved · 22515No number · 2022 · other work · approved · 22560No number · 2023 · other work · approved · 2360056No number · 2023 · other work · approved · 2360270No number · 2023 · other work · refused · 2360451No number · 2025 · other work · approved · 2528No number · 2025 · other work · approved · 2541No number · 2025 · other work · approved · 2560034No. 227 · 2026 · other work · approved · 2660196No number · 2026 · other work · approved · 2660222New house in a side gardenNo. 4 · 2026 · new house · refused · 26601834
ApprovedRefusedWithdrawn or invalid

25 files with "Mullingar" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 25 Oct 2026, 01:30
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 53 days. 1 in 3 is asked for more information, which adds about 101 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 3): 155 days; Appeal window: 4 weeks; Building starts: 88 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 51–55 (n=35)53 daysIf more info asked (1 in 3)With further information: median 155 days (n=14)155 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 88 days after permission (n=12)88 days after permissionSigned off58% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated49 decided home extensions, 12 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Dún Mhic Coluim, Mullingar with 10 numbered planning items
    ⌖ the houseOpen for commentsBuilding site that stoppedLarge schemeEmpty land zoned for homesRefusedApproved
    1. 121 Ashefield Apartments, Mullingar 2660550No decision yet · 188 m
    2. 2Ashe Road, Mullingar 19/6121Building site that stopped · 26 m
    3. 3Rathgowan or Farranshock (townland), Mullingar 2660222Approved with conditions · 474 m
    4. 45.6 ha zoned for homesEmpty land zoned for homes · 20 m
    5. 51.6 ha zoned for homesEmpty land zoned for homes · 160 m
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 162 m
    7. 70.5 ha zoned for homesEmpty land zoned for homes · 241 m
    8. 86.6 ha zoned for homesEmpty land zoned for homes · 256 m
    9. 94 Ashe Road, Mullingar 2660183Refused · 299 m
    10. 10227 Abbeylands, Mullingar 2660196Approved with conditions · 312 m
    Figure 4

    What happens to applications within 500 m

    Permission isn't building. Of 17 permissions since 2016, 4 show a start notice and 3 have a completion certificate.

    22 applications lodged within 500 m. Council: 17 approved, 5 refused. After appeals: 17 approved. Of those: 3 signed off, 0 built with the owner's opt-out, 1 started, 13 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT17: lodged → approved5: lodged → refused17: approved → approved5: refused → refused13: approved → no start notice found1: approved → started, not signed off3: approved → signed off22 lodged22 lodged17 approved17 approved5 refused5 refused17 approved17 approved5 refused5 refused13 no start notice found13 no start notice found1 started, not signed off1 started, not signed off3 signed off3 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured22 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 5

    The next 30 days

    1 deadline within 500 m; the first closes 16 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-16 2660550: application received — construction of an extension to our existing apartment to include a stairs on the first floor and on the second floor attoday30 Oct4 Nov9 Nov14 Nov19 Nov24 Nov2660550: application received — construction of an extension to our existing apartment to include a stairs on the first floor and on the second floor at · 188 m away · 2026-11-16
    Comments close
    • Comments close 16 Nov 202622 days left
      12660550 · application received — construction of an extension to our existing apartment to include a stairs on the first floor…
      €20 to the council · 188 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 6

    Approved, stalled or planned, not built yet

    1 building site nearby stopped before sign-off.

    Ashe Road, Mullingar · 18 homes: 18 homes, started Jun 2021, never signed off20212022202320242025202620272028Ashe Road, Mullingar · 18 homes26 m · 19/612118 homes, started Jun 2021, never signed off18 homes, started Jun 2021, never signed offtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 9 within 500 m

    Building site that stopped 1

    • 2Ashe Road, Mullingar · 18 homes, started Jun 2021, never signed off · 26 m

    Empty land zoned for homes 8

    • 45.6 ha zoned for homes · no homes built on it yet · 20 m
    • 51.6 ha zoned for homes · no homes built on it yet · 160 m
    • 60.2 ha zoned for homes · no homes built on it yet · 162 m
    • 70.5 ha zoned for homes · no homes built on it yet · 241 m
    • 86.6 ha zoned for homes · no homes built on it yet · 256 m
    • 0.6 ha zoned for homes · no homes built on it yet · 308 m
    • 1.1 ha zoned for homes · no homes built on it yet · 407 m
    • 6.2 ha zoned for homes · no homes built on it yet · 478 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 7

    Applications within 500 m, by year

    Between 1 and 5 a year; busiest 2025. 77% of decisions were approvals.

    2021: 6, 2022: 2, 2023: 4, 2024: 1, 2025: 5, 2026: 405102021: 5 approved2021: 1 refused6’21*2022: 1 approved2022: 1 refused2’222023: 3 approved2023: 1 refused4’232024: 1 approved1’242025: 4 approved2025: 1 refused5’252026: 3 approved2026: 1 refused4’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 8 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    Homes coming 0 not started
    • Rathgowan · 213 homes · building started · 290 m
    • Rathgowan · 171 homes · building started · 123 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Precious Angels Pre- School · Crèche30 Jan 2026 · report · Tusla Early Years Inspectorate195 m
    Tots Creche and Daycare · Crèche23 Sept 2025 · report · Tusla Early Years Inspectorate351 m
    An Gairdin Scoil Montessori · Crèche30 Apr 2025 · report · Tusla Early Years Inspectorateapprox. 771 m
    Early Steps Childcare · Crèche23 May 2025 · report · Tusla Early Years Inspectorateapprox. 771 m
    First Class Montessori · Crèche14 May 2025 · report · Tusla Early Years Inspectorateapprox. 771 m
    Bright Star Academy · Crèche28 Jan 2026 · report · Tusla Early Years Inspectorateapprox. 771 m
    Irene's Pre-School · Crèche11 Mar 2026 · report · Tusla Early Years Inspectorateapprox. 771 m
    Busy Little Bees · Crèche10 Dec 2025 · report · Tusla Early Years Inspectorateapprox. 771 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Westmeath County Council.
    Homes approved
    Here497
    Council middle0
    Homes started
    Here260
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    1% of homes built before 1971 (council 26%). 54% owner-occupied (council 68%).

    Homes built before 1971
    1% · council 26%
    Homes built since 2001
    35% · council 34%
    Owner-occupied
    54% · council 68%
    Rented
    39% · council 26%
    Children under 15
    24% · council 21%
    Aged 65 and over
    7% · council 15%
    Households with 2+ cars
    26% · council 44%
    Work mainly from home
    7% · council 9%
    This small area (234 people)Westmeath

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 237106014

    Bus
    260 m
    Farranshock Park · MU2 · busiest stop within 500 m: 2 an hour at peak
    Nearest school
    99 m
    Gaelscoil An Mhuilinn, 179 pupils
    Schools, stops and the council

    Schools

    • Gaelscoil An Mhuilinn · primary · 179 pupils · 99 m
    • Mullingar Educate Together NS · primary · 381 pupils · 608 m
    • Colaiste Mhuire, · postprimary · 873 pupils · 688 m
    • Loreto College · postprimary · 825 pupils · 716 m
    • Scoil na mBraithre · primary · 409 pupils · 727 m
    • St Brigids Spec Sch · primary · 93 pupils · 843 m
    • Scoil na Maighdine Mhuire · primary · 307 pupils · 947 m
    • Presentation Convent (Jnr) · primary · 277 pupils · 947 m

    Stops 24

    • Farranshock Park · MU2 · 2/hour at peak · 260 m
    • Farranshock Park · MU2 · 2/hour at peak · 264 m
    • Ashefield · MU2 · 2/hour at peak · 415 m
    • Ashefield · MU2 · 2/hour at peak · 450 m
    • Rathgowan Park · MU2 · 2/hour at peak · 465 m
    • Rathgowan Park · MU2 · 2/hour at peak · 485 m
    • Regional Hospital · 816, 819, MB01, MU1, MU2 · 4/hour at peak · 684 m
    • Regional Hospital · 816, 819, 837, MB01, MU1, MU2 · 5/hour at peak · 686 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Gaelscoil An Mhuilinn · 99 m-2.2% pupils (179)
    • Mullingar Educate Together NS · 608 m+0.5% pupils (381)
    • Colaiste Mhuire, · 688 m+4.6% pupils (873)
    • Loreto College · 716 m-1.7% pupils (825)
    • Scoil na mBraithre · 727 m-4% pupils (409)
    • St Brigids Spec Sch · 843 m+8.1% pupils (93)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 25 Oct 2026, 01:51
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Council consultation portalsPublic25 Oct 2026, 01:52open
    Council meetings (ModernGov)Public25 Oct 2026, 01:51open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Stalled build 26 m away (Ashe Road, Mullingar): what happens next?
      Ask for: The planning file for 19/6121.
      Council
    2. Application 188 m away open for comments until 16 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Mullingar
    Electoral division
    Mullingar North Urban
    Electoral area
    Mullingar
    Council
    Westmeath County Council
    Everything we found, as a list 8 lines
    • Not protected; no vacant land tax.
    • 9 sites nearby could change: 1 stalled build, 8 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 16 Nov 2026.
    • Farranshock Park (bus MU2) 260 m away: 2 an hour at morning peak; 12 from all stops within 500 m.
    • Here (2022 census): 54% owner-occupied (council 68%); 2% of homes empty (council 9%); most built 1991–2000; 55% drive to work (council 63%); population up 5% since 2016.
    • The council decides in a median 58 days (about 8 weeks); 43% are asked for more information.
    • Homes started within 1 km: 8 in the last year, 222 three years before.
    • 8 applications nearby in the last 12 months.
    What the terms mean 5 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.025 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public25 Oct 2026
    www2.courts.ie—© the publisher24 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public25 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.025 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence25 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 25 Oct 2026, 20:50 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.