Raheny Lane
Homes here mostly date from the 1990s. 1 planning file on this house, the latest from 2015. Most home extensions nearby get approved (86%).
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 54 days
- 4Appeal window4 weeks after the decision
- 5AppealHere about 5 months
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 4 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built 1991–2000, under planning permission and building regulations. 1 planning file on this house, the latest from 2015.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
- 2015F15A/0269 · permission for the · approved 2015 · started, not signed offapprovedstartedsigned off
Zoning, protection, tax and flood: the detail
What it says
CI - Community Infrastructure: Protect and promote an inclusive county, accessible to all members of the community, facilitating the sustainable development of necessary community, health, religious, educational, social and civic infrastructure. A wide range of different community facilities, civic facilities and social services exist within the County ranging from those of regional importance such as education and health facilities, to those of local and neighbourhood importance such as places of worship, community centres and childcare facilities. It is important to facilitate the development and expansion of such services in order to deliver a quality environment whilst improving the quality of life for all.
FINGAL_DP_OWN · — – —
What it says
CI - Community Infrastructure: Provide for and protect civic, religious, community, education, health care and social infrastructure
Reserved for civic, religious, community, education, health-care and social infrastructure.
the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029
Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Lusk (989 m)
| Within 500 m | Count | For example |
|---|---|---|
| Radon grid squares | 2 | |
| Monuments | 6 | Excavation - miscellaneous; Fulacht fia |
How we work this out
Sources: zoning, constraints.radon, epa_leap, rzlt, constraints, constraints.flood_cfram, constraints.smr · fetched 4 Oct 2026, 23:11
| Source | Licence | Fetched | Link |
|---|---|---|---|
| zoning | CC-BY-4.0 | 4 Oct 2026, 23:11 | open |
| constraints.radon | CC-BY-4.0 | 27 Sept 2026, 19:36 | open |
| epa_leap | CC-BY-4.0 | 5 Oct 2026, 23:09 | open |
| rzlt | CC-BY-4.0 | 4 Oct 2026, 23:59 | open |
| constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 27 Sept 2026, 19:37 | open |
| constraints.flood_cfram | CC-BY-NC-ND-4.0 · not redistributable — shown as a flag only | 11 Sept 2026, 19:11 | open |
| constraints.smr | CC-BY-4.0 | 27 Sept 2026, 19:29 | open |
How we work this out
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
Extensions are almost always approved here: 85–100% by type. A new house in a garden is harder: 55% approved, and 1 in 4 is asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 67 nearby, 3,965 council-wide
Raheny Lane, file by file since 2012
2 of 2 decided extensions on the road were approved.
12 files with "Raheny Lane" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 2012–2026
Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m
Extensions and refusals near you 0 extensions within 250 m · the last 12 months
No home extensions within 250 m in the last 12 months.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
How long, and what if someone objects?
A home extension's journey here
A decision takes 54 days. 1 in 4 is asked for more information, which adds about 49 days. Building starts about 4 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated93 decided home extensions, 40 start notices, 20 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
9 of 16 appealed refusals became permissions. 0 of 5 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
What's changing around you?
- 10.2 ha zoned for homes
- 24.1 ha zoned for homes
- 30.6 ha zoned for homes
- 40.5 ha zoned for homes
- 50.5 ha zoned for homes
- 60.6 ha zoned for homes
- 79 Millers Square, Lusk Village F26A/0637E
- 822 Clonrath Hill, Lusk F26A/0580E
- 918 Scribes Court, Lusk F26A/0634E
- 109 Saddler's Place, Lusk F26A/0451E
What happens to applications within 500 m
Permission isn't building. Of 41 permissions since 2016, 18 show a start notice and 10 have a completion certificate.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured54 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
Nothing closes within 500 m in the next 30 days.
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Sites that could change 9 within 500 m
Empty land zoned for homes 9
- 10.2 ha zoned for homes · no homes built on it yet · 239 m
- 24.1 ha zoned for homes · no homes built on it yet · 249 m
- 30.6 ha zoned for homes · no homes built on it yet · 272 m
- 40.5 ha zoned for homes · no homes built on it yet · 342 m
- 50.5 ha zoned for homes · no homes built on it yet · 424 m
- 60.6 ha zoned for homes · no homes built on it yet · 431 m
- 0.3 ha zoned for homes · no homes built on it yet · 451 m
- 0.5 ha zoned for homes · no homes built on it yet · 483 m
- 0.4 ha zoned for homes · no homes built on it yet · 497 m
Sources: acp, bcms, derelict, moderngov, npad, rzlt · fetched 9 Oct 2026, 23:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| acp | CC-BY-4.0 | 9 Oct 2026, 23:03 | open |
| bcms | CC-BY-4.0 | 10 Oct 2026, 23:46 | open |
| derelict | CC-BY-4.0 | 5 Oct 2026, 09:35 | open |
| moderngov | public | 11 Oct 2026, 01:26 | open |
| npad | CC-BY-4.0 | 11 Oct 2026, 01:43 | open |
| rzlt | CC-BY-4.0 | 4 Oct 2026, 23:59 | open |
Applications within 500 m, by year
Between 3 and 10 a year; busiest 2018. 85% of decisions were approvals.
2016 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Every application within 500 m 4 in the last 12 months
See every application on the map
- 918 Scribes Court, Lusk, Co. Dublin, K45 YX45 ApprovedPlanning Permission for attic conversion with dormers x 2 to rear to a
- 79 Millers Square, Lusk Village, K45X048 ApprovedPlanning permission for attic conversion as non habitable storage spac
- 822 Clonrath Hill, Lusk, Co. Dublin, K45 DP98 ApprovedThe development will consist of an attic conversion with dormer roof t
- 109 Saddler's Place, Lusk, Co. Dublin, K45 YX25 No decision yetThe development consists & will consist of: Retention Permission:
How we work this out
Building work nearby 1 in the last 12 months
- 21 Great Commons, Lusk, Fingal, K45 E060 · 18 Dec 2025 · 1 homes · short notice no sign-off needed · F25A/0563 · 297 m
How we work this out
Source: bcms · fetched 10 Oct 2026, 23:46
| Source | Licence | Fetched | Link |
|---|---|---|---|
| bcms | CC-BY-4.0 | 10 Oct 2026, 23:46 | open |
Homes coming 0 not started
- Rathmore Road and Lusk North Park · 84 homes · building started · 300 m
- Raheny Lane · 50 homes · building started · 194 m
- Clonrath Avenue · 39 homes · building started · 198 m
How we work this out
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Developments within 1.0 km
| Scheme | Homes | Progress | Distance |
|---|---|---|---|
| Lusk and Greatcommons Residential Development | 64 | 64 built (2026-Q2) | 308 m |
| Station Road, Lusk | 181 | 181 built (2025-Q4) | 472 m |
| Lands at Station Road, Lusk | 35 | 35 not started (2026-Q2) | 533 m |
Crèches and schools inspected
| Name | Latest inspection | Distance |
|---|---|---|
| Bambi's Land Montessori & ASD Play school · Crèche | 15 Jan 2025 · report · Tusla Early Years Inspectorate | 324 m |
| Precious Days Montessori · Crèche | 4 Mar 2025 · report · Tusla Early Years Inspectorate | 739 m |
| Just Like Home · Crèche | 11 May 2026 · report · Tusla Early Years Inspectorate | 797 m |
| ButterFlies Creche & Montessori · Crèche | 27 May 2025 · report · Tusla Early Years Inspectorate | 844 m |
| Naionra Montessori Lusca · Crèche | 20 Apr 2026 · report · Tusla Early Years Inspectorate | 846 m |
| Little Scholars Montessori & Childcare Limited · Crèche | 8 Jan 2026 · report · Tusla Early Years Inspectorate | 897 m |
| Little Scholars Montessori and Childcare Limited · Crèche | 11 Dec 2025 · report · Tusla Early Years Inspectorate | 978 m |
How we work this out
Sources: dublin_pipeline, npad, schools, tusla_ey · fetched 5 Oct 2026, 23:01
| Source | Licence | Fetched | Link |
|---|---|---|---|
| dublin_pipeline | CC-BY-4.0 | 5 Oct 2026, 23:01 | open |
| npad | CC-BY-4.0 | 11 Oct 2026, 01:43 | open |
| schools | CC-BY-4.0 | 27 Sept 2026, 23:32 | open |
| tusla_ey | public (Tusla statutory register; acknowledgement required, no open licence stated) | 5 Oct 2026, 23:33 | open |
How busy is this area Busier than most of Fingal County Council.
How we work this out
What's the area like?
This street block against the council
22% of homes built before 1971 (council 11%). 89% owner-occupied (council 67%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267104017/02
Schools, stops and the council
Schools
- Rush and Lusk Educate Together NS · primary · 393 pupils · 54 m
- Lusk Community College · postprimary · 1104 pupils · 112 m
- S N Lusca · primary · 413 pupils · 695 m
- Lusk Junior National School St Maccullins · primary · 366 pupils · 695 m
Stops 8
- Orlynn Park · 33, 33A, 33E, 33X, 33n · 2/hour at peak · 602 m
- Orlynn Park · 33, 33A, 33X · 5/hour at peak · 604 m
- Station Road · 33, 33A, 33E, 33T, 33X, 33n · 2/hour at peak · 640 m
- Station Road · 33, 33A, 33X · 5/hour at peak · 659 m
- Lusk House · 33, 33A, 33X · 5/hour at peak · 793 m
Schools growing or shrinking planning in 3 years · pupils last year
- Rush and Lusk Educate Together NS · 54 m-4.1% pupils (393)
- Lusk Community College · 112 m+2.1% pupils (1,104)
- S N Lusca · 695 m-0.7% pupils (413)
- Lusk Junior National School St Maccullins · 695 m-4.2% pupils (366)
Open consultations
Council meetings 30 items
- 14 Sept 2026 · Notice of proposed disposal of land to the rear of Beaver Lodge, The Priory, Donabate, Co. Dublin…
- 14 Sept 2026 · Notice of proposed disposal of land at Garristown, Co. Dublin to North and East Voluntary Housing…
- 14 Sept 2026 · Ormond Court, Rush, Co. Dublin
- 14 Sept 2026 · Knightsgate Avenue, Rush, Co. Dublin
- 10 Sept 2026 · Councillor M. Boland - Engagement with the National Transport Authority (NTA) and Irish Rail re…
- 10 Sept 2026 · Councillor C. Johnston - Coastal Erosion Emergency Measures - Portrane - AI109687
- 10 Sept 2026 · Councillor C. Johnston - Tower Bay - Portrane to Donabate Pedestrian and Cycle Path - AI109688
- 10 Sept 2026 · Councillor E. Dockrell - Identifying a Site in Rush/Lusk for Padel-Courts - AI109220
Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
| Source | Licence | Fetched | Link |
|---|---|---|---|
| gtfs | CC-BY-4.0 | 4 Oct 2026, 23:41 | open |
| schools | CC-BY-4.0 | 27 Sept 2026, 23:32 | open |
| npad | CC-BY-4.0 | 11 Oct 2026, 01:43 | open |
| consult | public | 11 Oct 2026, 01:25 | open |
| moderngov | public | 11 Oct 2026, 01:26 | open |
| lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Permission for the (F15A/0269) started Oct 2015, never signed off: is it finished?Seller · solicitorAsk for: The completion certificate, or an engineer's opinion of compliance.
- Planning here goes back to 2012: is the house built as approved?SolicitorAsk for: The original planning grant and an opinion of compliance.
- Flood risk area within 100 m: can you insure it?InsurerAsk for: A flood-cover quote before sale agreed.
- Zoned S3 (community infrastructure), not for homes: could you extend?Solicitor · plannerAsk for: A solicitor's or planner's view.
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Townland
- Lusk
- Electoral division
- Lusk
- Electoral area
- Rush-Lusk
- Council
- Fingal County Council
Everything we found, as a list 8 lines
- 1 job on this site started but never signed off as finished.
- Zoned S3 (community infrastructure); not protected; no vacant land tax; flood risk area within 100 m.
- 9 sites nearby could change: 9 empty zoned plots.
- No morning-peak service within 500 m; nearest is Orlynn Park, 602 m away (2 an hour).
- Here (2022 census): 89% owner-occupied (council 67%); 8% of homes empty (council 5%); most built 1991–2000; 50% drive to work (council 52%); population up 12% since 2016.
- Around here the council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
- Homes started within 1 km: 25 in the last year, 52 three years before.
- 4 applications nearby in the last 12 months.
What the terms mean 6 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 30
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC-BY-4.0 | 9 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC-BY-4.0 | 10 Oct 2026 |
| data.gov.ie | Various (see each layer) | mixed — CC-BY-4.0 except OPW flood (CC… | 27 Sept 2026 |
| s3.eu-west-1.amazonaws.com | Office of Public Works | CC-BY-NC-ND-4.0 · flag only | 11 Sept 2026 |
| gis.epa.ie | Environmental Protection Agency | CC-BY-4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC-BY-4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | https: | Local authorities (consultation portals) | public | 11 Oct 2026 |
| www2.courts.ie | — | all-rights-reserved | 11 Oct 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC-BY-4.0 | 5 Oct 2026 |
| services.arcgis.com | Dublin local authorities (housing delivery pipeline) | CC-BY-4.0 | 5 Oct 2026 |
| data.epa.ie | Environmental Protection Agency (LEAP licence register) | CC-BY-4.0 | 5 Oct 2026 |
| esbnetworks.ie | — | all-rights-reserved (esbnetworks.ie di… · flag only | 11 Sept 2026 |
| transportforireland.ie | National Transport Authority | CC-BY-4.0 | 4 Oct 2026 |
| lda.ie | Land Development Agency | CC-BY-4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | public | 11 Oct 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC-BY-4.0 | 11 Oct 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC-BY-4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC-BY-4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | PSI — PSRA re-use terms (psr.ie/re-use… | 11 Oct 2026 |
| services.arcgis.com | Local authorities (RZLT maps) | CC-BY-4.0 | 4 Oct 2026 |
| gov.ie | Department of Education | CC-BY-4.0 | 27 Sept 2026 |
| gov.ie | Department of Housing | CC-BY-SA-4.0 | 9 Oct 2026 |
| tusla.ie | Tusla (Early Years Inspectorate) | public (Tusla statutory register; ackn… | 5 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC-BY-4.0 | 4 Oct 2026 |