Planning report · Fingal County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 19:58

Park Road, Rush, Rush Demesne

53.52995, -6.10316

Homes here mostly date from the 2000s. Most home extensions nearby get approved (85%). 49 homes approved 84 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Park RoadBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 1 file on Park Road2022: 1 file on Park Road2023: 1 file on Park Road2024: 3 files on Park Road2025: 1 file on Park Road7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R1
Zoning · New residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RA - Residential Area: Ensure the provision of high quality new residential environments with good layout and design, with adequate public transport and cycle links and within walking distance of community facilities. Provide an appropriate mix of house sizes, types and tenures in order to meet household needs and to promote balanced communities.

ZoningR1 · New residential
What it says

RA - Residential Area: Provide for new residential communities subject to the provision of the necessary social and physical infrastructure

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares1
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 16 on the draft 2027 map; 16 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 79–80% by type. A new house in a garden is harder: 46% approved, and 1 in 3 is asked for more information.

Single-storey rear10 decided · more info asked 30%
80% · council 92%
Attic or dormer29 decided · more info asked 34%
79% · council 92%
New house in a garden or site46 decided · more info asked 37%
46% · council 53%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 85 nearby, 2,164 council-wide

Figure 3

Park Road, file by file since 2021

New houses in side gardens or on sites: 1 of 1.

7 planning files on Park Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsPorches, roofs, otherNo number · 2021 · other work · refused · F21A/0218No number · 2023 · other work · approved · F23A/0169No number · 2024 · other work · approved · F24A/0066No number · 2024 · other work · approved · F24A/0540ENo number · 2024 · other work · approved · F24A/0972ENo number · 2025 · other work · approved · F25A/0161ENew house in a side gardenNo number · 2022 · new house · approved · F22A/0618
ApprovedRefusedWithdrawn or invalid

7 files with "Park Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 3 is asked for more information, which adds about 70 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 3): 122 days; Appeal window: 4 weeks; If appealed: +140 days; Building starts: 144 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–55 (n=43)53 daysIf more info asked (1 in 3)With further information: median 122 days (n=8)122 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 140 days (n=29, all appeals within 1.5 km)+140 daysBuilding startsStart notice: median 144 days after permission (n=18)144 days after permissionSigned off62% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated65 decided home extensions, 21 start notices, 29 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    3 of 15 appealed refusals became permissions. 1 of 15 appealed approvals were reversed.

    Refusals appealed15 decided
    3 became permissions
    Approvals appealed15 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months

    1 of 1 changed the council's decision

    • 502116 Pending · a vacant site, Knightsgate Walk, Rush, Co. Dublin · 337 m
    • 324034 Granted with conditions · Lands east of Kenure Park and west of Goldenridge, Skerries Road,… · 492 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Park Road, Rush, Rush Demesne with 12 numbered planning items
    ⌖ the houseApproved, not startedEmpty land zoned for homesApprovedRefusedNo decision yet
    1. 1Park Road Development F24A/0066Approved, no sign building has started · 84 m
    2. 20.5 ha zoned for homesEmpty land zoned for homes · 121 m
    3. 30.8 ha zoned for homesEmpty land zoned for homes · 125 m
    4. 46.4 ha zoned for homesEmpty land zoned for homes · 197 m
    5. 51.6 ha zoned for homesEmpty land zoned for homes · 211 m
    6. 60.3 ha zoned for homesEmpty land zoned for homes · 262 m
    7. 70.5 ha zoned for homesEmpty land zoned for homes · 279 m
    8. 813 Knightsgate Walk, Rush F26A/0014EApproved · 295 m
    9. 9a vacant site, Knightsgate Walk F26A/0612ERefused · 337 m
    10. 10Site on Palmer Avenue, Rush F26A/0519ENo decision yet · 348 m
    11. 11Lands at Palmer Road (within the townland of ‘Rush Demesne’), east of F26A/0673ENo decision yet · 376 m
    12. 1219 Palmer Court, Palmer Road F26A/0122EApproved · 433 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 23 permissions since 2016, 6 show a start notice and 2 have a completion certificate.

    42 applications lodged within 500 m. Council: 22 approved, 9 refused. After appeals: 23 approved. Of those: 2 signed off, 2 built with the owner's opt-out, 2 started, 17 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT22: lodged → approved9: lodged → refused9: lodged → withdrawn or invalid2: lodged → undecided21: approved → approved7: refused → refused9: withdrawn or invalid → withdrawn2: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal17: approved → no start notice found2: approved → built, owner opted out2: approved → started, not signed off2: approved → signed off42 lodged42 lodged22 approved22 approved9 refused9 refused9 withdrawn or invalid9 withdrawn or invalid2 undecided2 undecided23 approved23 approved7 refused7 refused10 withdrawn10 withdrawn2 undecided2 undecided17 no start notice found17 no start notice found2 built, owner opted out2 built, owner opted out2 started, not signed off2 started, not signed off2 signed off2 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured42 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      49 homes 84 m away were approved Sept 2024 with no start notice yet; the permission runs to Sept 2029.

      Park Road Development · 49 homes: 49 homes approved Sep 2024, not started2024202520262027202820292030Park Road Development · 49 homes84 m · F24A/006649 homes approved Sep 2024, not started49 homes approved Sep 2024, not startedtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 11 within 500 m

      Approved, not started 1

      Empty land zoned for homes 10

      • 20.5 ha zoned for homes · no homes built on it yet · 121 m
      • 30.8 ha zoned for homes · no homes built on it yet · 125 m
      • 46.4 ha zoned for homes · no homes built on it yet · 197 m
      • 51.6 ha zoned for homes · no homes built on it yet · 211 m
      • 60.3 ha zoned for homes · no homes built on it yet · 262 m
      • 70.5 ha zoned for homes · no homes built on it yet · 279 m
      • 0.7 ha zoned for homes · no homes built on it yet · 330 m
      • 0.1 ha zoned for homes · no homes built on it yet · 336 m
      • 0.1 ha zoned for homes · no homes built on it yet · 343 m
      • 5.1 ha zoned for homes · no homes built on it yet · 0 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 9

      Applications within 500 m, by year

      Between 4 and 12 a year; busiest 2022. 71% of decisions were approvals.

      2021: 7, 2022: 12, 2023: 4, 2024: 7, 2025: 6, 2026: 6051015202021: 4 approved2021: 2 refused2021: 1 withdrawn or invalid7’21*2022: 4 approved2022: 3 refused2022: 5 withdrawn or invalid12’222023: 2 approved2023: 1 refused2023: 1 withdrawn or invalid4’232024: 7 approved7’242025: 3 approved2025: 2 refused2025: 1 withdrawn or invalid6’252026: 2 approved2026: 1 refused2026: 1 withdrawn or invalid2026: 2 undecided6’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 6 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 1 in the last 12 months
      1 not signed off
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Homes coming 49 not started
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Bellingham · 2 applications in 10 years

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Park Road Development4040 built (2026-Q2)0 m
      Kenure Park Road Development3232 not started (2026-Q2)137 m
      Lands at Palmer Road and Park Road3939 not started (2026-Q2)218 m
      Palmer Road and Palmer Avenue7474 not started (2025-Q4)221 m
      Lands North of Palmer Road and West of Palmer Avenue2828 being built (2026-Q2)419 m
      Goldenridge——493 m
      Brook Lane Development54no activity on site reported (2026-Q1)516 m
      Hayestown Road Development50no activity on site reported (2026-Q1)523 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Charlie's Childcare Rush · Crèche12 Nov 2025 · report · Tusla Early Years Inspectorate508 m
      Tadpoles Childcare · Crèche18 Sept 2025 · report · Tusla Early Years Inspectorate570 m
      Smarty Pants Montessori Naíonra & Afterschool · Crèche8 Oct 2024 · report · Tusla Early Years Inspectorate605 m
      The Crescent Academy · Crèche14 Jul 2025 · report · Tusla Early Years Inspectorate661 m
      Mill Bank Kids · Crèche17 Apr 2024 · report · Tusla Early Years Inspectorate868 m
      Ros-Eo Community Preschool · Crèche11 Oct 2024 · report · Tusla Early Years Inspectorate936 m
      Bright Beginners · Crèche24 Mar 2026 · report · Tusla Early Years Inspectorate968 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Fingal County Council.
      Homes approved
      Here153
      Council middle0
      Homes started
      Here319
      Council middle3
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      1% of homes built before 1971 (council 11%). 84% owner-occupied (council 67%).

      Homes built before 1971
      1% · council 11%
      Homes built since 2001
      68% · council 43%
      Owner-occupied
      84% · council 67%
      Rented
      12% · council 28%
      Children under 15
      25% · council 22%
      Aged 65 and over
      7% · council 11%
      Households with 2+ cars
      46% · council 42%
      Work mainly from home
      16% · council 12%
      This small area (241 people)Fingal

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267118027

      Bus
      772 m
      Rush Cricket Club · 33, 33A, 33E
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      321 m
      Gaelscoil Ros Eo, 167 pupils
      Homes sold nearby
      10
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Gaelscoil Ros Eo · primary · 167 pupils · 321 m
      • Scoil Nais Caitriona · primary · 274 pupils · 625 m

      Stops 12

      • Rush Cricket Club · 33, 33A, 33E, 33X, 33n · 3/hour at peak · 772 m
      • Palmer Road · 33, 33A, 33X · 5/hour at peak · 782 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Gaelscoil Ros Eo · 321 m+5% pupils (167)
      • Scoil Nais Caitriona · 625 m-1.4% pupils (274) · an extension 2024, approved

      Council meetings 30 items

      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      2. 49 homes approved 84 m away (Park Road Development), not started: what is planned?
        Ask for: The planning file for F24A/0066.
        Council
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Rush
      Electoral division
      Rush
      Electoral area
      Rush-Lusk
      Council
      Fingal County Council
      Everything we found, as a list 8 lines
      • Zoned R1 (new residential); not protected; on the vacant land tax map.
      • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
      • 49 homes approved nearby, not started; largest 49 at Park Road Development.
      • No morning-peak service within 500 m; nearest is Rush Cricket Club, 772 m away (3 an hour).
      • Here (2022 census): 84% owner-occupied (council 67%); 1% of homes empty (council 5%); most built 2001–2010; 43% drive to work (council 52%); population up 12% since 2016.
      • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
      • Homes started within 1 km: 79 in the last year, 138 three years before.
      • 6 applications nearby in the last 12 months.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 19:58 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.