Planning report · Meath County Council · 2000 m around the house · the last 12 months · 21 Oct 2026, 15:52

Otterstown Road

53.61585, -6.91797

Homes here mostly date from the 1970s. 64 homes approved 1.2 km away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of AthboyBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2017: 1 file on Athboy2018: 1 file on Athboy2020: 3 files on Athboy2022: 3 files on Athboy2023: 4 files on Athboy2024: 2 files on Athboy2026: 1 file on Athboy15 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  • 16 Feb 2018 · notice that building work was starting · no official sign-off needed for this kind of work
  • 20 Oct 2017 · notice that building work was starting · not signed off as finished (no completion certificate on file)
  • 14 Sept 2017 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
  • 11 Sept 2017 · notice that building work was starting · no official sign-off needed for this kind of work
  • 6 Sept 2017 · notice that building work was starting · no official sign-off needed for this kind of work
  • 23 Aug 2017 · notice that building work was starting · not signed off as finished (no completion certificate on file)
  • 25 Jul 2017 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
  • 2 Jun 2017 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
  • 3 May 2017 · notice that building work was starting · signed off as finished jul 2018
  • 17 Apr 2017 · notice that building work was starting · not signed off as finished (no completion certificate on file)
On this site
P5
Zoning · Rural and agricultural
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningP5 · Rural and agricultural
What it says

RA - Rural Area: Rural Area

Land zoned to stay rural. New houses are restricted to demonstrated local need under the rural-housing policy of the development plan.

meath county development plan 2021 2027 · 3 Nov 2021 – 2 Nov 2027

ZoningP5 · Rural and agricultural
What it says

RA - Rural Area: Rural Area

Land zoned to stay rural. New houses are restricted to demonstrated local need under the rural-housing policy of the development plan.

meath county development plan 2021 2027 as varied · 3 Nov 2021 – 2 Nov 2027

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Athboy (475 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings36Castletown House; sign post
Monuments33Enclosure - large enclosure; Castle - unclassified
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 15 on the draft 2027 map; 14 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 81% approved, and 1 in 2 is asked for more information.

New house in a garden or site16 decided · more info asked 44%
81% · council 78%
Approved nearbyMeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 16 nearby, 2,968 council-wide

Figure 3

Athboy, file by file since 2017

5 of 6 decided extensions on the road were approved. New houses in side gardens or on sites: 3 of 3.

15 planning files on Athboy since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo. 25 · 2017 · single-storey side · approved · KA170615No number · 2018 · single-storey rear · approved · KA180010No number · 2022 · attic conversion / dormer · refused · 221331No number · 2023 · single-storey rear · approved · 23513No number · 2024 · single-storey rear · approved · 2460719No number · 2024 · attic conversion / dormer · approved · 2460834Porches, roofs, otherNo number · 2022 · other work · approved · 221160No number · 2022 · other work · approved · 22327No number · 2023 · other work · approved · 2360327No number · 2023 · other work · approved · 23665No number · 2023 · attic conversion / dormer · approved · 23923No number · 2026 · other work · refused · 2660119New house in a side gardenNo number · 2020 · new house · approved · KA202058No number · 2020 · new house · approved · KA202059No number · 2020 · new house · approved · KA202090
ApprovedRefusedWithdrawn or invalid

15 files with "Athboy" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; Appeal window: 4 weeks; Building starts: 131 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–54 (n=17)52 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 131 days after permission (n=10)131 days after permissionSigned off40% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated23 decided home extensions, 10 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 2 appealed refusals became permissions.

    Refusals appealed2 decided
    1 became permissions
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501592 Open · Connaught Street , Athboy , Co.Meath. · 1.0 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher21 Oct 2026, 01:40open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 4

    What's changing around you?

    Street map around Otterstown Road with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedEmpty land zoned for homesRefusedNo decision yet
    1. 1THE JUNCTION OF O GROWNEY STREET (N51) & L4001 – KILDALKEY ROAD, ATHBOY 2661253No decision yet · 541 m
    2. 2A site of 1.1 Ha in Athboy Co. Meath., The site comprises: an existing dwelling (Eircode C15 YX24) and its grounds in the townland of Fosterfields; land to the side and rear of the existing dwelling (Eircode C15 YX24) principally for new residential 2661260No decision yet · 709 m
    3. 3Eighty Eight Acres, Hill of Ward Athboy 2660698Approved with conditions · 1.4 km
    4. 4Town Parks & Fostersfields 2460241Approved, no sign building has started · 1.2 km
    5. 5Bunboggan 24204Approved, no sign building has started · 1.2 km
    6. 62.9 ha zoned for homesEmpty land zoned for homes · 486 m
    7. 70.6 ha zoned for homesEmpty land zoned for homes · 569 m
    8. 80.2 ha zoned for homesEmpty land zoned for homes · 707 m
    9. 90.5 ha zoned for homesEmpty land zoned for homes · 914 m
    10. 103.2 ha zoned for homesEmpty land zoned for homes · 936 m
    11. 110.1 ha zoned for homesEmpty land zoned for homes · 959 m
    12. 12Frayne Road Castletown, Athboy 2660119Refused · 590 m
    13. 13Connaught St., Athboy 2660163Refused · 664 m
    14. 14Rear of Connaught St., Town Parks 2660301No decision yet · 720 m
    15. 15Townparks, Athboy 2660503No decision yet · 795 m
    Figure 6

    The next 30 days

    3 deadlines within 2.0 km; the first closes 3 Nov 2026.

    3 deadlines in the next 30 days: 2026-11-03 2660698: CONDITIONAL — permission to amend condition no. 3 of planning reference no. KA202035, on this site, which consists of the amendment o; 2026-11-16 2661253: application received — The development will comprise of the following: a. Alterations to an existing two storey dwelling to include for demoli; 2026-11-17 2661260: application received — the development principally comprises the construction of 6 No. semi-detached, 2-storey, 3-bedroom houses (111.2 sq m) ttoday26 Oct31 Oct5 Nov10 Nov15 Nov20 Nov2660698: CONDITIONAL — permission to amend condition no. 3 of planning reference no. KA202035, on this site, which consists of the amendment o · 1.4 km away · 2026-11-032661253: application received — The development will comprise of the following: a. Alterations to an existing two storey dwelling to include for demoli · 541 m away · 2026-11-162661260: application received — the development principally comprises the construction of 6 No. semi-detached, 2-storey, 3-bedroom houses (111.2 sq m) t · 709 m away · 2026-11-17
    Comments closeTime to appeal ends
    • Time to appeal ends 3 Nov 202613 days left
      32660698 · CONDITIONAL — permission to amend condition no. 3 of planning reference no. KA202035, on this site, which consists of…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.4 km away
    • Comments close 16 Nov 202626 days left
      12661253 · application received — The development will comprise of the following: a. Alterations to an existing two storey…
      €20 to the council · 541 m away
    • Comments close 17 Nov 202627 days left
      22661260 · application received — the development principally comprises the construction of 6 No. semi-detached, 2-storey,…
      €20 to the council · 709 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    64 homes 1.2 km away were approved Mar 2025 with no start notice yet; the permission runs to Mar 2030.

    Bunboggan · 64 homes: 64 homes approved Mar 2025, not started; Town Parks & Fostersfields · 15 homes: 15 homes approved May 2025, not started20242025202620272028202920302031Bunboggan · 64 homes1.2 km · 2420464 homes approved Mar 2025, not started64 homes approved Mar 2025, not startedTown Parks & Fostersfields · 15 homes1.1 km · 246024115 homes approved May 2025, not started15 homes approved May 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 2.0 km

    Approved, not started 2

    Empty land zoned for homes 9

    • 62.9 ha zoned for homes · no homes built on it yet · 486 m
    • 70.6 ha zoned for homes · no homes built on it yet · 569 m
    • 80.2 ha zoned for homes · no homes built on it yet · 707 m
    • 90.5 ha zoned for homes · no homes built on it yet · 914 m
    • 103.2 ha zoned for homes · no homes built on it yet · 936 m
    • 110.1 ha zoned for homes · no homes built on it yet · 959 m
    • 1.5 ha zoned for homes · no homes built on it yet · 963 m
    • 0.1 ha zoned for homes · no homes built on it yet · 983 m
    • 1.4 ha zoned for homes · no homes built on it yet · 1.1 km

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 8

    Applications within 500 m, by year

    Between 1 and 3 a year; busiest 2020. 88% of decisions were approvals.

    2017: 1, 2020: 3, 2022: 2, 2023: 1, 2024: 105102017: 1 approved1’17*2020: 3 approved3’202022: 1 approved2022: 1 refused2’222023: 1 approved1’232024: 1 approved1’24
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 15 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    Building work nearby 8 in the last 12 months
    6 not signed off2 no sign-off needed
    • Townparks, Athboy, Meath · 4 Sept 2026 · 85 homes · start notice not signed off · 2460667 · 1.0 km
    • Kells Road, Athboy, Meath, C15 XY73 · 13 Jul 2026 · 7-day notice not signed off · 1.2 km
    • Eighty Eight Acres, Athboy, Meath · 3 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 21598 · 1.1 km
    • Town Parks, Athboy, Meath · 21 May 2026 · 85 homes · start notice not signed off · 2460667 · 880 m
    • Eighty Eight Acres,, Athboy, Meath · 12 May 2026 · 1 homes · start notice, opted out no sign-off needed · 21598 · 1.1 km
    • Town Parks, Athboy, Meath · 9 Feb 2026 · 19 homes · start notice not signed off · 2460667 · 666 m
    • Eighty Eight Acres, Athboy, Meath · 5 Dec 2025 · 3 homes · start notice not signed off · 24332 · 1.1 km
    • Fosterfield, Athboy, Meath · 5 Dec 2025 · 1 homes · start notice not signed off · 2461037 · 1.5 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 21 Oct 2026, 01:58
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    Homes coming 79 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Cookies Early Learning Centre · Crèche11 Mar 2025 · report · Tusla Early Years Inspectorate681 m
    Athboy Montessori School · Crèche9 Apr 2025 · report · Tusla Early Years Inspectorate907 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Meath County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here97
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    38% of homes built before 1971 (council 18%). 88% owner-occupied (council 75%).

    Homes built before 1971
    38% · council 18%
    Homes built since 2001
    23% · council 45%
    Owner-occupied
    88% · council 75%
    Rented
    6% · council 20%
    Children under 15
    14% · council 23%
    Aged 65 and over
    21% · council 12%
    Households with 2+ cars
    64% · council 54%
    Work mainly from home
    7% · council 11%
    This small area (346 people)Meath

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 167035003/167035004

    Bus
    653 m
    Athboy · 188
    Nearest school
    672 m
    O'Growney National School, 382 pupils
    Homes sold nearby
    51
    in 3 years, 2 new (Property Price Register)
    Schools, stops and the council

    Schools

    • O'Growney National School · primary · 382 pupils · 672 m
    • Athboy Community School · postprimary · 681 pupils · 1.2 km

    Stops 3

    • Athboy · 188 · 0/hour at peak · 653 m
    • Athboy · 109B, 111, 111A, 111X, UM09 · 3/hour at peak · 686 m
    • Athboy · 109B, 111, 111A, 111X, UM09 · 1/hour at peak · 697 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • O'Growney National School · 672 m+0.8% pupils (382)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 21 Oct 2026, 02:35
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Council consultation portalsPublic21 Oct 2026, 01:42open
    Council meetings (ModernGov)Public21 Oct 2026, 02:35open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Zoned P5 (rural and agricultural), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    2. Application 541 m away open for comments until 16 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Castletown
    Electoral division
    Grennanstown
    Electoral area
    Kells
    Council
    Meath County Council
    Everything we found, as a list 8 lines
    • Zoned P5 (rural and agricultural); not protected; no vacant land tax.
    • 11 sites nearby could change: 2 approved schemes, 9 empty zoned plots.
    • 2 applications open for comments nearby; nearest closes 16 Nov 2026.
    • 79 homes approved nearby, not started; largest 64 at Bunboggan.
    • No morning-peak service within 500 m; nearest is Athboy, 653 m away (8 a day).
    • Here (2022 census): 88% owner-occupied (council 75%); 9% of homes empty (council 6%); most built 1971–1980; 67% drive to work (council 64%).
    • The council decides in a median 55 days (about 8 weeks); 38% are asked for more information.
    • Homes started within 1 km: 85 in the last year, 83 three years before.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.021 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public21 Oct 2026
    www2.courts.ie—© the publisher21 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public21 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.021 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence21 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    water.ie—© the publisher · flag only—
    water.ie—© the publisher · flag only—
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 21 Oct 2026, 15:52 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.