Planning report · Mayo County Council · 500 m around the house · the last 12 months · 19 Oct 2026, 22:39

River View, Ballinrobe

53.62029, -9.22331

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (97%). 2 applications nearby open for comments.

See on the mapWatch this area

Not held yet for Mayo County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
Yes
Protected or listed · inside the zone around a recorded monument (MA118-022011-)
No
Vacant land tax · lived-in homes don't pay it
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect the amenity and character of existing residential areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

mayo county development plan 2022 2028 · 10 Aug 2022 – 9 Aug 2028

Protected building2 within 100 m on the council's record (not republished); on the council's record (not republished)
Heritage inventory3 within 100 m Cranmore House; water pump
Monument zoneOn this site Enclosure, Cornaroya; Historic town, Ballinrobe Demesne,Carrownalecka,Cornaroya,Friarsquarter West,Knockanotish,Knockfereen,Rathkelly

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Ballinrobe Town (942 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings36canal (section of); bridge
Monuments18Historic town; Castle - unclassified
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 23 on the draft 2027 map; 15 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, SMR zones of notification, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.012 Oct 2026, 23:31open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 82% approved, and 1 in 3 is asked for more information.

New house in a garden or site17 decided · more info asked 35%
82% · council 91%
Approved nearbyMayo overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 17 nearby, 3,390 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 51 days. 1 in 2 is asked for more information, which adds about 135 days.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 2): 196 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 46–53 (n=17)51 daysIf more info asked (1 in 2)With further information: median 196 days (n=13)196 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off33% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated30 decided home extensions, 3 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    0 of 1 appealed refusals became permissions.

    Refusals appealed1 decided
    0 became permissions
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around River View, Ballinrobe with 11 numbered planning items
    ⌖ the houseOpen for commentsEmpty land zoned for homesNo decision yetApproved
    1. 1Bowgate Court, Bowgate Street 2660773No decision yet · 100 m
    2. 2Ballinrobe Demesne, Ballinrobe 2660736No decision yet · 368 m
    3. 30.4 ha zoned for homesEmpty land zoned for homes · 91 m
    4. 40.3 ha zoned for homesEmpty land zoned for homes · 109 m
    5. 50.1 ha zoned for homesEmpty land zoned for homes · 200 m
    6. 61.3 ha zoned for homesEmpty land zoned for homes · 328 m
    7. 70.1 ha zoned for homesEmpty land zoned for homes · 341 m
    8. 80.1 ha zoned for homesEmpty land zoned for homes · 492 m
    9. 9Neale Road & New Line, Ballinrobe 2560921No decision yet · 88 m
    10. 10Cornaroya Cornmarket, Ballinrobe 2560859Approved with conditions · 166 m
    11. 11The Bowers, Ballinrobe 2660100Approved with conditions · 245 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 36 permissions since 2016, 2 show a start notice and 1 has a completion certificate.

    40 applications lodged within 500 m. Council: 36 approved, 4 refused. After appeals: 36 approved. Of those: 1 signed off, 0 built with the owner's opt-out, 1 started, 17 with no start notice found, 17 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT36: lodged → approved4: lodged → refused36: approved → approved4: refused → refused17: approved → no start notice found1: approved → started, not signed off1: approved → signed off17: approved → ran out40 lodged40 lodged36 approved36 approved4 refused4 refused36 approved36 approved4 refused4 refused17 no start notice found17 no start notice found1 started, not signed off1 started, not signed off1 signed off1 signed off17 ran out17 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured40 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    2 deadlines within 500 m; the first closes 27 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-27 2660736: application received — Planning Permission to construct extension to dwelling house as shown on plans and all ancillary site developments; 2026-11-09 2660773: application received — Resilire Ltd. intend to apply for permission for development at Bowgate Court, Bowgate Street, Ballinrobe, Co. Mayo. Ttoday24 Oct29 Oct3 Nov8 Nov13 Nov18 Nov2660736: application received — Planning Permission to construct extension to dwelling house as shown on plans and all ancillary site developments · 368 m away · 2026-10-272660773: application received — Resilire Ltd. intend to apply for permission for development at Bowgate Court, Bowgate Street, Ballinrobe, Co. Mayo. T · 100 m away · 2026-11-09
    Comments close
    • Comments close 27 Oct 20268 days left
      22660736 · application received — Planning Permission to construct extension to dwelling house as shown on plans and all ancillary…
      €20 to the council · 368 m away
    • Comments close 9 Nov 202621 days left
      12660773 · application received — Resilire Ltd. intend to apply for permission for development at Bowgate Court, Bowgate Street,…
      €20 to the council · 100 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 6 within 500 m

    Empty land zoned for homes 6

    • 30.4 ha zoned for homes · no homes built on it yet · 91 m
    • 40.3 ha zoned for homes · no homes built on it yet · 109 m
    • 50.1 ha zoned for homes · no homes built on it yet · 200 m
    • 61.3 ha zoned for homes · no homes built on it yet · 328 m
    • 70.1 ha zoned for homes · no homes built on it yet · 341 m
    • 80.1 ha zoned for homes · no homes built on it yet · 492 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 7

    Applications within 500 m, by year

    Between 2 and 8 a year; busiest 2018. 90% of decisions were approvals.

    2017: 4, 2018: 8, 2019: 2, 2020: 5, 2021: 4, 2022: 2, 2023: 4, 2024: 3, 2025: 7, 2026: 105102017: 4 approved4’17*2018: 7 approved2018: 1 refused8’182019: 1 approved2019: 1 refused2’192020: 4 approved2020: 1 refused5’202021: 4 approved4’212022: 2 approved2’222023: 3 approved2023: 1 refused4’232024: 3 approved3’242025: 7 approved7’252026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 7 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Building work nearby 3 in the last 12 months
    3 not signed off
    • 5 Glebe Street, Ballinrobe, Mayo, F31 DN83 · 27 Jul 2026 · 15 homes · 7-day notice not signed off · 398 m
    • Convent Road, Ballinrobe, Mayo · 3 Nov 2025 · 3 homes · start notice not signed off · PT8MO201 · 424 m
    • Main Street, Ballinrobe, Mayo, F31 FY50 · 3 Nov 2025 · 3 homes · start notice not signed off · PT8MO199 · 378 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 19 Oct 2026, 01:33
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Ballinrobe Bright Beginnings · Crèche16 Apr 2026 · report · Tusla Early Years Inspectorate598 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Mayo County Council.
    Homes approved
    Here45
    Council middle0
    Homes started
    Here50
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    6% of homes built before 1971 (council 26%). 68% owner-occupied (council 73%).

    Homes built before 1971
    6% · council 26%
    Homes built since 2001
    57% · council 32%
    Owner-occupied
    68% · council 73%
    Rented
    23% · council 21%
    Children under 15
    22% · council 19%
    Aged 65 and over
    14% · council 20%
    Households with 2+ cars
    44% · council 45%
    Work mainly from home
    9% · council 9%
    This small area (354 people)Mayo

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 157021006

    Bus
    132 m
    Ballinrobe South · 435 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    553 m
    St. Josephs N. S., 451 pupils
    Schools, stops and the council

    Schools

    • St. Josephs N. S. · primary · 451 pupils · 553 m
    • Ballinrobe Community School · postprimary · 865 pupils · 768 m

    Stops 4

    • Ballinrobe South · 435 · 0/hour at peak · 132 m
    • Ballinrobe · 422, 431, 456 · 1/hour at peak · 409 m
    • Ballinrobe · 422, 456 · 0/hour at peak · 412 m
    • Ballinrobe · 431 · 415 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St. Josephs N. S. · 553 m-0.4% pupils (451)
    • Ballinrobe Community School · 768 m+3% pupils (865) · an extension 2025, approved with conditions
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 19 Oct 2026, 02:28
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Council consultation portalsPublic19 Oct 2026, 01:38open
    Council meetings (ModernGov)Public19 Oct 2026, 02:28open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    2. Application 100 m away open for comments until 9 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Ballinrobe Demesne
    Electoral division
    Ballinrobe
    Electoral area
    Claremorris
    Council
    Mayo County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); monument zone; no vacant land tax.
    • 6 sites nearby could change: 6 empty zoned plots.
    • 2 applications open for comments nearby; nearest closes 9 Nov 2026.
    • Ballinrobe (bus 422, 431) 409 m away: 12 a day, fewer than one an hour at morning peak.
    • Here (2022 census): 68% owner-occupied (council 73%); 10% of homes empty (council 22%); most built 2001–2010; 63% drive to work (council 66%); population up 9% since 2016.
    • Around here the council decides in a median 55 days (about 8 weeks); 43% are asked for more information.
    • Homes started within 1 km: 44 in the last year, 2 three years before.
    • 7 applications nearby in the last 12 months.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.019 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public19 Oct 2026
    www2.courts.ie—© the publisher19 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.012 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public19 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.019 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence19 Oct 2026
    services6.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 19 Oct 2026, 22:39 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.